Building the Nybron bridge

Nybrovägen-Nybrontien yksityistie tiekunta | Published December 8, 2017  -  Deadline January 9, 2018
cpvs
45200000

Building the Nybron bridge and improving its associated privatizations for about 70 meters. Building the Nybron bridge and improving its associated privatizations for about 70 meters.

Bridge repairs, Opisto-Hankitti yksityistie

Opisto-Hankutti yksityistie | Published October 16, 2017  -  Deadline December 8, 2017
cpvs
45221119

The Opisto-Acquired Privatization Road will ask for your offer to repair the Palstojentät bridge in Hyvinkää. The bridge is a three-lined concrete slab with a tile slab. The contract involves the improvement of the road floor on both sides of the bridge and road pavement. The invitation to tender is enclosed. The Opisto-Acquired Privatization Road will ask for your offer to repair the Palstojentät bridge in Hyvinkää. The bridge is a three-lined concrete slab with a tile slab. The contract involves the improvement of the road floor on both sides of the bridge and road pavement. The invitation to tender is enclosed. The national threshold for the procurement law is not exceeded, Section 25 of the Procurement Law.

Vt 25 Tynninharju Differential Interface, KU

Lohjan kaupunki | Published September 2, 2017  -  Deadline October 2, 2017
cpvs
45200000

Requirements as specified in the procurement documents The contract is a total price-based total contract. The main stages of the work include: - Construction of a tinker bridge with ramps - Construction of the Tynninharju crossing bridge (S1) and the Ravita subway passage (S2) - Implementation of groundwater protection and noise handling structures - Land cutting and overlay works - - Traffic control and work-in-transit traffic arrangements The object of the acquisition is to build the Tynninharju cross-platform on the highway 25 at Tynninharju in Lohja. A new differential platform with the ramps is implemented on the highway 25 and the alignment of the highway route changes on this section. The project will also include the construction of a new Ravitie subway passageway for the highway. In connection with the Bridging bridge (S1) and the Ravita subway passage (S2), there are roads and light traffic arrangements. In addition, the project implements anti-noise and groundwater protection structures as well as privatization arrangements. Requirements as specified in the procurement documents

Vt 25 Tynninharju Differential Layer, KU

Lohjan kaupunki | Published November 16, 2017
cpvs
45200000

The object of the acquisition is to construct the Tynninharju cross-section on the highway 25 at Tynninharju in Lohja. The new highway platform with the ramps is implemented on the highway 25, and the alignment of the highway route changes on this section. The project will also build a new Ravita subway passageway for the highway. In connection with the Bridging bridge (S1) and Ravitie subway passage (S2), there are roads and light traffic arrangements. In addition, the project implements anti-noise and groundwater protection structures as well as privatization arrangements. The contract is a total price-based total contract. The main work stages of the work include: - Construction of a borehole interconnection with ramps - Construction of the Tynninharju crossing bridge (S1) and the Ravita subway passage (S2) - Implementation of groundwater protection and noise handling structures - Surface grid and overhead construction works - Procedures for roads and light traffic connections and bus stops. - Traffic control and work-based traffic arrangements The object of the acquisition is to construct the Tynninharju interconnector on the highway 25 at Tynninharju in Lohja. The new highway platform with the ramps is implemented on the highway 25, and the alignment of the highway route changes on this section. The project will also build a new Ravita subway passageway for the highway. In connection with the Bridging bridge (S1) and Ravitie subway passage (S2), there are roads and light traffic arrangements. In addition, the project implements anti-noise and groundwater protection structures as well as privatization arrangements.

Works for complete or part construction and civil engineering work

Lohjan kaupunki | Published November 17, 2017
Winner
Graniittirakennus Kallio Oy
cpvs
45200000

The object of the acquisition is to construct the Tynninharju cross-section on the highway 25 at Tynninharju in Lohja. The new highway platform with the ramps is implemented on the highway 25, and the alignment of the highway route changes on this section. The project will also build a new Ravita subway passageway for the highway. In connection with the Bridging bridge (S1) and Ravitie subway passage (S2), there are roads and light traffic arrangements. In addition, the project implements anti-noise and groundwater protection structures as well as privatization arrangements.

The contract is a total price-based total contract.

The main stages of the work include:

- The construction of a multipurpose interconnector with a rampart

- Construction of the Bridging Crossing Bridge (S1) and the Ravine Underpass (S2)

- Implementation of groundwater protection and noise management structures

- Overhead and overhead work

- Measures relating to roads, light traffic connections and bus stops.

- Traffic control and work-based traffic arrangements.