Public tenders for bridge in 00521-helsinki Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Ringåsen Bridge

Kristiinankaupunki | Published April 17, 2018  -  Deadline May 15, 2018
cpvs
45221000

The building is located in Kristiinankaupunki on the Ringåsen road where the road crosses the Teuvanjoki. The old bridge is a timber-framed steel beam bridge with massive concrete ground structures. The old bridge is demolished and rebuilt as a reinforced concrete clay roof tiles (Bul) for the current bridge site. The contract also includes bridge structures on both sides of the bridge. The building is located in Kristiinankaupunki on the Ringåsen road where the road crosses the Teuvanjoki. The old bridge is a timber-framed steel beam bridge with massive concrete ground structures. The old bridge is demolished and rebuilt as a reinforced concrete clay roof tiles (Bul) for the current bridge site. The contract also includes bridge structures on both sides of the bridge.

North bridge and the bridge in the fresh Vartiokylänlahti over the Gulf of

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published March 27, 2017  -  Deadline April 11, 2017
cpvs
45200000

Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction. Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction.

Asema and the bridge of the bridge of the bridge, the renovation and repair of the bridge

Helsingin kaupunki, kaupunkiympäristön toimiala, rakennuttaminen | Published September 12, 2017  -  Deadline October 3, 2017
cpvs
45200000

The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plans plan. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be built with rail and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the requirements of the tenderer's suitability for the supplier. The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plans plan. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be built with rail and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the requirements of the tenderer's suitability for the supplier.

Improving the Vaasa bridge bridge V-1427, KU

Seinäjoen kaupunki | Published March 16, 2018  -  Deadline April 6, 2018
cpvs
45200000

Improving the Vaasantie Bridge (V-1427) in the city street network of Seinäjoki as planned. The contract includes, among others, dismantling and renewal of badly constructed structures, restoring and repairing damages to bridge damage to bridges, repairing and coating of bridging surface structures and waterproofing, and renewal of bridge railings and boulders. Improving the Vaasantie Bridge (V-1427) in the city street network of Seinäjoki as planned. The contract includes, among others, dismantling and renewal of badly constructed structures, restoring and repairing damages to bridge damage to bridges, repairing and coating of bridging surface structures and waterproofing, and renewal of bridge railings and boulders.

North bridge and the bridge in the fresh Vartiokylänlahti over the Gulf of

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published June 13, 2017
Winner
Kreate Oy
cpvs
45200000

Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction. The total contract. The phasing of the work and duties of the project supervisor of tender documents by. The calculation period will be extended. Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction.

North bridge and the bridge in the fresh Vartiokylänlahti over the Gulf

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published March 1, 2017  -  Deadline April 3, 2017
cpvs
45200000

The requirements in the contract documents in accordance with the specified overall contract. The phasing of the work and duties of the project supervisor of the tender documents by. Overview of the contract defining the extent of the tender documents. The contract includes the Vuosaari street bridge repair and construction of a new bridge in the fresh (between Vuosaari street bridge and subway bridge) as well as street-drinkers and the bridge on the west and the east end of the base construction, street areas, and skill building structures. The requirements in the contract documents in accordance with the specified

Kulosaari metro bridge

Helsingin kaupungin liikennelaitos -liikelaitos | Published May 5, 2017
Winner
Kreate Oy
cpvs
45240000

Kulosaaren underground fortification of the bridge, the proportion 2. Kulosaaren metro bridge fortification, Ossus 2. Kulosaaren underground fortification of the bridge, the proportion of two.

Bridge construction work

OTSO Metsäpalvelut Oy | Published March 20, 2018  -  Deadline April 6, 2018
cpvs
45221110

OTSO Metsäpalvelut Oy will apply for your offer at the Teerijoki Bridge at Jäniskoskentie in Vieremä. The construction works include the dismantling of the old bridge and the construction of the new Ble II type bridge, according to the volume list. The work is carried out on condition that state aid is granted for the construction of the bridge. The construction date is August-November 2018 and is determined after the decision on the state subsidy. A more accurate time is defined when contracting a contract. An invitation to tender for a work is attached. OTSO Metsäpalvelut Oy will apply for your offer at the Teerijoki Bridge at Jäniskoskentie in Vieremä. The construction works include the dismantling of the old bridge and the construction of the new Ble II type bridge, according to the volume list. The work is carried out on condition that state aid is granted for the construction of the bridge. The construction date is August-November 2018 and is determined after the decision on the state subsidy. A more accurate time is defined when contracting a contract. An invitation to tender for a work is attached.

Asema and the bridge of the bridge of the bridge, the renovation and repair of the bridge

Helsingin kaupunki, kaupunkiympäristön toimiala, rakennuttaminen | Published December 23, 2017
cpvs
45200000

The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plans plan. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be built with rail and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the requirements of the tenderer's suitability for the supplier. The contract form is a complete contract where the contractor selected for the job acts as the main contractor in the position of the principal contractor referred to by YSE and the legislation. The contractor is responsible for the management responsibilities of the site and the construction site services. The offer is extended for 2 weeks. Additional letter will be delivered via the project bank in the next few days and will be communicated via the Offer Service. The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plans plan. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be built with rail and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the requirements of the tenderer's suitability for the supplier.

Asema and the bridge of the bridge on the bridge and the repair, the total work

Helsingin kaupunki, kaupunkiympäristön toimiala, rakennuttaminen | Published August 4, 2017  -  Deadline September 19, 2017
cpvs
45200000

The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plan specifications. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be constructed along with track and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the tenderer's suitability requirements. The contract form is a comprehensive contract where the contractor selected for the job acts as the main contractor in the position of the principal contractor referred to by YSE and the legislation. The contractor is responsible for the management responsibilities of the site and the construction site services. The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plan specifications. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be constructed along with track and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the tenderer's suitability requirements.

Kotakennään bridge building design; Äänekoski

Liikennevirasto | Published January 18, 2017
Winner
A-Insinöörit suunnittelu Oy
cpvs
71000000

The task is to draw up a plan for the construction of the bridge Kotakennään bridge. The task is to draw up a plan for the construction of the bridge Kotakennään bridge. The bridge is a concrete girder bridge, deck length of approx. 200 m. The task is to draw up a plan for the construction of the bridge Kotakennään bridge.

Bridge of Lepsääjoki

Nurmijärven kunta | Published March 23, 2018  -  Deadline April 25, 2018
cpvs
45000000

Renewing the bridge of the river slopes Replacing the slope of the river slopes

Continuation of the bridge armored car system

Puolustusvoimien Logistiiikkalaitos | Published May 4, 2018
Winner
Patria Land Systems Oy
cpvs
35410000

Bridge bridge, 4 pcs, 14 m bridges, 2 pcs, bridge bridge wagon, 6 pcs and bridge cars, 9 pcs upgrade for 14 m bridges processing, special tools, spare parts, user and maintenance training, documentation update, bridge armored GFE and upgradeable maintenance works . Bridge bridge, 4 pcs, 14 m bridges, 2 pcs, bridge bridge wagon, 6 pcs and bridge cars, 9 pcs upgrade for 14 m bridges processing, special tools, spare parts, user and maintenance training, documentation update, bridge armored GFE and upgradeable maintenance works .

Construction of the Liesoja bridge

Praavan yksityistien tiekunta | Published May 9, 2018  -  Deadline May 25, 2018
cpvs
45000000

Construction of the Liesoja bridge and related privatizations. The bridge to be constructed is of a single-lined reinforced concrete cone, and it is set up on both pegs. The main dimensions of the bridge are: Stretches Jm = 19 m Useful width of the bridge HL = 6,5m Class IV, modest Design cost: LM1 / LM3 (NCCI 1 5.9.2014) Construction of the Liesoja bridge and the associated privatizers. The bridge to be constructed is of a single-lined reinforced concrete cone, and it is set up on both pegs. The main dimensions of the bridge are: Stretches Jm = 19 m The useful width of the bridge HL = 6,5m Class IV, modest Design cost: LM1 / LM3 (NCCI 1 5.9.2014)

Vuosaari bridge and the bridge over the fresh Vartiokylänlahti bay, street and building design

Helsingin kaupunki | Published October 5, 2015
Winner
A-Insinöörit Suunnittelu Oy
cpvs
71000000

Vuosaari bridge repair design, and new lane arrangements in the transport plan as well as the fresh new bridge design and the required fresh arrangements at both ends of the bridge. Contract includes. street, bridge, environmental planning, as well as municipal technical maintenance planning. Planning Exercise focused primarily aimed at the implementation of engineering design

Vuosaari bridge and the bridge over the fresh Vartiokylänlahti bay, street and building design

Helsingin kaupunki, rakennusvirasto, katu- ja puisto-osasto | Published May 15, 2015  -  Deadline June 29, 2015
cpvs
71410000

Vuosaari bridge repair design, and new lane arrangements in the transport plan as well as the fresh new bridge design and the required fresh arrangements at both ends of the bridge. The acquisition includes aimed at the implementation of such plan. street, bridge, environmental planning, as well as municipal technical maintenance planning.

Driveways on the Vantaa River Road Bridge

Liikennevirasto | Published April 25, 2018  -  Deadline May 30, 2018
cpvs
44000000

Material Delivery of Trackballs on Vantaa River Road Bridge Supply Material Delivery of Trackballs on Vantaa River. The material delivery of the jibs of the bridge bridge of Vantaa

Bridge Construction UUD4 2016 KU

Kaakkois-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 24, 2016  -  Deadline March 16, 2016
cpvs
45200000

This is the bridge repair works, which includes the following items:

Brahenkatu crossing the bridge U-2469, Hämeenlinna

Sulkavan River bridge U-3065, Heinola

Tainionkoski (stream) Bridge U-3070, Sysmä

At the same straits bridge U-3088, Sysmä

High Saarensalmi bridge U-3103, Sysmä

Jovin bridges U-3271 and U-2566, Gulf

The contract includes road repair bridges Kanta-Häme and Päijät.

The total contract is based. Bridge repair plans have been drawn up by the customer.

The bridge for light traffic on the bush

Kaupunkiympäristö | Published June 7, 2018  -  Deadline June 27, 2018
cpvs
45200000

Building a glue-bonded glue-bridging bridge. Building a glue-bonded glue-bridging bridge.

Construction of the Nikkilä road bridge

Liikennevirasto | Published September 19, 2017  -  Deadline October 31, 2017
cpvs
45234100

Requirements as set out in the procurement documents, the construction of the new Nikkilä road bridge and the associated trackside, safety equipment and transformation of electrical structures. The acquisition includes the construction work on the Nikkilä road bridge in Kerava-Sköldvik, including shipbuilding, pavement construction work, electrical and safety work. In addition, the acquisition includes the tasks of the main contractor and the main importer. Construction of Nikkilä's new bridging bridge and related track, safety equipment and transformer work on electrical structures. Requirements as specified in the procurement documents