Public tenders for bridge in Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Renovation of the old bridge bridge U-3502

Kaupunkiympäristö | Published August 4, 2017  -  Deadline August 31, 2017
cpvs
45221119

Renovation of the old bridge bridge U-3502 (construction). Renovation of the old bridge bridge U-3502 (construction).

Drum Bridge and bridge railings

Maatilayrityspalvelu Vigren ay | Published March 24, 2015  -  Deadline April 10, 2015
cpvs
44212120

The tender drum bridge, delivered and assembled to the installation site, as well as sillankaiteista installed.

Optie bridge, light traffic bridge

Vimpelin kunta | Published September 7, 2017  -  Deadline October 6, 2017
cpvs
45221000

The technical service of the municipality of Vimpel asks for your offer, in accordance with the attached tender documents, for your total price offer Rauhala city plan for the light traffic bridge to be built in the area. The contract package includes the construction of a steel / timber bridge according to plan documents. The technical service of the municipality of Vimpel asks for your offer, in accordance with the attached tender documents, for your total price offer Rauhala city plan for the light traffic bridge to be built in the area. The contract package includes the construction of a steel / timber bridge according to plan documents.

City of Oulu iron bridge and the Swan Bridge Repair

Oulun kaupungin yhdyskunta- ja ympäristöpalvelut | Published April 17, 2015  -  Deadline May 5, 2015
cpvs
45200000

The construction includes: - Iron bridge light traffic lane replacement, - Iron bridge railing replacement, - Iron bridge expansion joint device replacement, - Swan bridge the two expansion joint device repair - Swan Bridge on T1 expansion joint device demolition and replacement of the mass expansion joint device.

Ternujoen bridge

Hirvaan metsätien tiekunta | Published May 5, 2017  -  Deadline May 19, 2017
cpvs
45221110

the demolition of the current poor condition and built closed to traffic in 1956, the forest road reinforced concrete bridge and a new reinforced concrete bridge construction similar to the construction site at the same time. The new bridge State Administrative Agency authorization decision has been obtained (No 45/2016/2 of 24.8.2016). It is an overall length of 21.5 meters and a width of 5.5 meters commercial bridge, with the free central hole of 12 meters and kansiulokkeet both sides having a length of about 4 meters. The question is a shallow freshwater river where the bridge is located in a rock on the ground, on which the bridge is established. The bridge is carried out in accordance with the Finnish Transport Agency's bridge building instructions. The current bridge has been replaced with a temporary steel-structured bridge element, which will be used throughout the work period. Construction Tekin Those things Inquiries: Hannu demolition of the built Sandqvist 0400 242289. The current poor condition and the one closed in 1956, the forest road reinforced concrete bridge and a new reinforced concrete bridge construction similar to the construction site at the same time. The new bridge State Administrative Agency authorization decision has been obtained (No 45/2016/2 of 24.8.2016). It is an overall length of 21.5 meters and a width of 5.5 meters commercial bridge, with the free central hole of 12 meters and kansiulokkeet both sides having a length of about 4 meters. The question is a shallow freshwater river where the bridge is located in a rock on the ground, on which the bridge is established. The bridge is carried out in accordance with the Finnish Transport Agency's bridge building instructions. The current bridge has been replaced with a temporary steel-structured bridge element, which will be used throughout the work period. Construction Tekin Those things Inquiries: Hannu Sandqvist 0400 242 289.

Friitala bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published April 27, 2017  -  Deadline June 8, 2017
cpvs
45221110

Requirements for documents relating to the acquisition in accordance with the specified Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements. The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST. The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15m. The contract is the main work phases include .: - job-term traffic - construction work early roundabout ST - the detour and the thief tonight's construction of ST - the existing bridge demolition - the new bridge structural steel fabrication - the bridge of agriculture and the construction of intermediate supports - piles of tiles and tulopenkereiden construction - road construction - installation of a new bridge steel structure - reinforced concrete cover slab construction - the bridge surface structures, equipment and appliances, as well as steel structures surface treatment - the detour and the thief tonight's demolition - bridge place finish contract includes job-term traffic arrangements, the existing bridge demolition and construction of a new Friitala bridge to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment. Requirements for documents relating to the acquisition in accordance with the specified

Haukilahden nettle bridge and bridge repair

Kotkan kaupunki / Tekniset Palvelut | Published February 9, 2016  -  Deadline March 2, 2016
cpvs
45200000

The contract includes two Mussalo road reinforced concrete slab bridge renovation.

Haukilahden bridge renovation includes, among other things:

- Renewal of the superstructure; The cover structure is renewed in its entirety by a new cover of two reinforced concrete elements,

- Renewal of the edge beams,

- Railing of the bridge and embankment railings renewed.

Nettle bridge renovation includes, among other things:

- The edge beams will be renewed,

- Cover surface structures are renewed,

- Railing of the bridge and embankment railings renewed.

North bridge and the bridge in the fresh Vartiokylänlahti over the Gulf of

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published March 27, 2017  -  Deadline April 11, 2017
cpvs
45200000

Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction. Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction.

Silversmiths (Paasikiventie river bridge) bridge repair works

Hämeenlinnan kaupunki | Published December 19, 2016  -  Deadline February 24, 2017
cpvs
45200000

The contract includes the execution of silversmiths bridge repair. This is a 1985 graduate of prestressed continuous box girder bridge with a total length of about 175 meters. The contract includes the execution of silversmiths bridge repair. This is a 1985 graduate of prestressed continuous box girder bridge with a total length of about 175 meters.

Asema and the bridge of the bridge of the bridge, the renovation and repair of the bridge

Helsingin kaupunki, kaupunkiympäristön toimiala, rakennuttaminen | Published September 12, 2017  -  Deadline October 3, 2017
cpvs
45200000

The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plans plan. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be built with rail and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the requirements of the tenderer's suitability for the supplier. The contract involves the extension of the Asemapllllikönkatu bridge to the south in accordance with the plans plan. At the same time, the old bridge cover will be repaired to the extent of the invitation to tender documents and new street structures will be built with rail and wiring harnesses in accordance with the plan documents. Construction work is carried out in the railway area and therefore the work of the Finnish Transport Regulatory Authority is required to work in the railway area. The contractor is selected as the most economically advantageous tenderer. The most economically advantageous tender is the tender that is cheaper than the one that meets the requirements of the tenderer's suitability for the supplier.

Friitala bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published July 5, 2017
cpvs
45221110

The contract includes a job-term traffic, the demolition of the existing bridge and construction of a new bridge Friitala to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment. Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements. The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST. The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15m. The contract includes a job-term traffic, the demolition of the existing bridge and construction of a new bridge Friitala to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment.

Jyllinkoski bridge

Kurikan kaupunki | Published July 17, 2014  -  Deadline September 1, 2014
cpvs
45000000

Jyllinkoski a timber bridge re-construction of the existing payments. The bridge belongs to Lusa, Pine Road PRIVATE ROAD road network.

Bridge work

OTSO Metsäpalvelut Oy | Published August 28, 2017  -  Deadline September 15, 2017
cpvs
45221110

OTSO Metsäpalvelut Oy will ask for your offer on the construction of the Jormonjoki bridge in Pölkkäpääntie, Joensuu. The construction works include the dismantling of an old concrete bridge and the construction of a new Ble II bridge type bridge according to the volume list. The work is carried out on condition that state aid is provided for the construction of the bridge. The construction date is June-September 2018 and will be determined after the state subsidy decision. A more accurate time is defined when contracting a contract. An invitation to tender for a work is attached. OTSO Metsäpalvelut Oy will ask for your offer on the construction of the Jormonjoki bridge in Pölkkäpääntie, Joensuu. The construction works include the dismantling of an old concrete bridge and the construction of a new Ble II bridge type bridge according to the volume list. The work is carried out on condition that state aid is provided for the construction of the bridge. The construction date is June-September 2018 and will be determined after the state subsidy decision. A more accurate time is defined when contracting a contract. An invitation to tender for a work is attached.

North bridge and the bridge in the fresh Vartiokylänlahti over the Gulf of

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published June 13, 2017
Winner
Kreate Oy
cpvs
45200000

Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction. The total contract. The phasing of the work and duties of the project supervisor of tender documents by. The calculation period will be extended. Overview of a chore extent defined in the tender documents. Construction of the bridge comprises a Vuosaaren street repair work and new fresh bridge construction (Vuosaaren street between the bridge and the bridge, the subway) and the street and the fresh bridge west and east end of the bottom construction, street areas and engineering structures construction.

Optie Bridge, a light traffic bridge

Vimpelin kunta | Published October 4, 2017
cpvs
45221000

The technical service of the municipality of Vimpel asks for your offer in accordance with the attached tender documents for your total price offer Rauhala city plan for the light traffic bridge to be built in the area. The contract package includes the construction of a steel / wooden bridge along the plan documents. The technical service of the municipality of Vimpel asks for your offer in accordance with the attached tender documents for your total price offer Rauhala city plan for the light traffic bridge to be built in the area. The contract package includes the construction of a steel / wooden bridge along the plan documents.

Martikkala bridge

Seinäjoen kaupunki | Published May 16, 2014  -  Deadline June 13, 2014
cpvs
45200000

Martikkala bridge repair work. Purpose of the project is to renew the existing bridge with wooden deck concrete composite betonikanneksi. The work includes renovation of the existing steel beams. The new deck is constructed from reinforced concrete elements. In addition, the new abutment edge beams, bearings, and erosion protection. Useful width of the bridge is 4.5 m and spans of 13.8 m + 13.8 m bridge is a district of the City of Seinäjoki Nurmo Nurmo and leads over the river. The total contract is a contract.

North bridge and the bridge in the fresh Vartiokylänlahti over the Gulf

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published March 1, 2017  -  Deadline April 3, 2017
cpvs
45200000

The requirements in the contract documents in accordance with the specified overall contract. The phasing of the work and duties of the project supervisor of the tender documents by. Overview of the contract defining the extent of the tender documents. The contract includes the Vuosaari street bridge repair and construction of a new bridge in the fresh (between Vuosaari street bridge and subway bridge) as well as street-drinkers and the bridge on the west and the east end of the base construction, street areas, and skill building structures. The requirements in the contract documents in accordance with the specified

Kulosaari metro bridge

Helsingin kaupungin liikennelaitos -liikelaitos | Published May 5, 2017
Winner
Kreate Oy
cpvs
45240000

Kulosaaren underground fortification of the bridge, the proportion 2. Kulosaaren metro bridge fortification, Ossus 2. Kulosaaren underground fortification of the bridge, the proportion of two.

The bridge works

OTSO Metsäpalvelut | Published August 11, 2016  -  Deadline September 9, 2016
cpvs
45221110

OTSO Forest Services to request a quotation Kouvanjoen in Pudasjärvi Kouvanjoentiellä bridge construction work. The bridge construction work has to be carried out talvirakentamisena 01.01.2017 - 31.03.2017 between the bridge and the other on 30.06.2017 by the construction work. The work is carried out on the condition that the construction of the bridge from government grants. Construction Date of contract award shall be determined in more detail in connection with the YH. (Invitation to tender attached)

Kailo bridge repair

Naantalin kaupunki | Published March 13, 2017  -  Deadline April 12, 2017
cpvs
45221110

Kailo bridge is in the center, ponttonirakenteinen. The contract includes the renovation of the ground supports of the bridge, the new bridge abutments and between the pontoons and will be renewed ponttoniosuudelta rails. Kailo bridge is in the center, ponttonirakenteinen. The contract includes the renovation of the ground supports of the bridge, the new bridge abutments and between the pontoons and will be renewed ponttoniosuudelta rails.