Call +44 800 9755 164

Public tenders for construction in Varna Bulgaria

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction-site supervision services

Община Варна | Published April 5, 2017  -  Deadline May 22, 2017
cpvs
71521000, 71520000

The subject of the contract is related to the selection of contractors to exercise construction supervision during construction of five sites in the implementation of the project - "Modernization of educational infrastructure in the territory of the city" and to assess the compliance of investment projects construction supervision of five other object entrusted to the engineering in implementing the same project.

Construction-site supervision services

Община Варна | Published April 22, 2017  -  Deadline May 29, 2017
cpvs
71521000, 71520000

The subject of the contract is related to the selection of contractors to exercise construction supervision during the construction of three sites in the implementation of project - "Integrated urban transport in Varna - second phase" and to assess the compliance of investment projects and exercising construction supervision during construction of five other sites awarded engineering in implementing the same project.

The specific responsibilities of the contractor are performing:

178 of TDA. The construction supervision is carried out in the compulsory coverage as required by the TDA requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- The continuous construction supervision over the implementation of works, according to the technical design and requirements of the regulations;

- verification of completed construction works in volumes and prices and the protocols on acceptance of the completed works, drawn up by the contractor for construction works in the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Health and safety (OHS) and its regulations;

- control of the environmental protection;

- control of the conformity of materials and products and other similar activities.

The specific responsibilities of the Contractor are performing:

178 of TDA. The construction supervision is carried out in the compulsory coverage as required by the TDA requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- The continuous construction supervision over the implementation of works, according to the technical design and requirements of the regulations;

- verification of completed construction works in volumes and prices and the protocols on acceptance of the completed works, drawn up by the contractor for construction works in the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Health and safety (OHS) and its regulations;

- control of the environmental protection;

- control of the conformity of materials and products and other similar activities.

The specific responsibilities of the Contractor are performing:

9 LSP; and

178 of TDA. The construction supervision is carried out in the compulsory coverage as required by the TDA requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- The continuous construction supervision over the implementation of works, according to the technical design and requirements of the regulations;

- verification of completed construction works in volumes and prices and the protocols on acceptance of the completed works, drawn up by the contractor for engineering in the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Health and safety (OHS) and its regulations;

- control of the environmental protection;

- control of the conformity of materials and products and other similar activities.

The specific responsibilities of the Contractor are performing:

9 LSP; and

178 of TDA. The construction supervision is carried out in the compulsory coverage as required by the TDA requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- The continuous construction supervision over the implementation of works, according to the technical design and

Construction work

Община Варна | Published March 22, 2017  -  Deadline May 4, 2017
cpvs
45000000, 71320000, 71311000, 45200000, 45400000, 45333000

The subject of the contract relates to the selection of contractors to develop investment projects in the phase of technical projects, carry out works and to carry out supervision during construction for 5 lots for the project "Modernization of the educational infrastructure in the city of Varna" of Varna Municipality in procedure BG16RFOP001-1.002. The first lot is for repair and implementation of energy efficiency measures at school "Stefan Karadzha". Lot 2 has a subject - repair, implementation of energy efficiency measures and furnishings DG № 1 "Firefly." Lot 3's subject - repairs, gas and equipment SG № 41 "First of June" (with nursery group). Lot 4 is the subject - overhaul subsidiary of SG № 12 "Ian Bibian" and Lot 5's subject - repair and implementation of energy efficiency measures in the building of the school "Nikola Vaptsarov".

It is planned to be developed investment project in technical design to be made for construction site "repair and energy efficiency measures at school" Stefan Karadzha "" to be exercised supervision during construction.

Within the subject of the contract should be made: studies / if necessary / and design; preparation of technical project with the purpose of authorization for construction in all parts of the investment project in accordance with Decree № 4 / 22.04.2004 for the scope and content of investment projects, KS and KSF; coordination and removal of all necessary permits, incl. building permit; preparation of detailed work schedules of works; coordination of sketches and developed project with all control bodies operating companies, municipal and state institutions according to legal requirements before submitting the project to the contracting authority to assess the compliance of the project with the essential requirements for construction, approval and obtaining a construction permit; execution of works and exercising author ...

Construction-site supervision services

Община Варна | Published March 22, 2017  -  Deadline May 8, 2017
cpvs
71521000, 71520000

The subject of the contract relates to the selection of contractors to exercise construction supervision during construction of 5 sites in implementing the project - "Modernization of the educational infrastructure in the city of Varna" and to assess the compliance of investment projects construction supervision of five other object entrusted to the engineering in implementing the same project.

The specific responsibilities of the contractor are performing:

178 of TDA. Construction supervision is carried out in accordance with the requirements mandatory coverage of LSP, the requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- Exercise of continuous construction supervision over the implementation of works under technical design and requirements of the regulations;

- Check the executed works on quantities and prices and signing of protocols acceptance of the completed works drawn up by the contractor for works on the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Law on health and safety (OHS) and its regulations;

- Control of Environmental Protection;

- Control of compliance of materials and products and other similar activities.

The specific responsibilities of the contractor are performing:

9 TDA; and

178 of TDA. Construction supervision is carried out in accordance with the requirements mandatory coverage of LSP, the requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- Exercise of continuous construction supervision over the implementation of works under technical design and requirements of the regulations;

- Check the executed works on quantities and prices and signing of protocols acceptance of the completed works drawn up by the contractor for engineering in the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Law on health and safety (OHS) and its regulations;

- Control of Environmental Protection;

- Control of compliance of materials and products and other similar activities.

The specific responsibilities of the Contractor are performing:

9 TDA; and

178 of TDA. Construction supervision is carried out in accordance with the requirements mandatory coverage of LSP, the requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- Exercise of continuous construction supervision over the implementation of works under technical design and requirements of the regulations;

- Check the executed works on quantities and prices and signing of protocols acceptance of the completed works drawn up by the contractor for engineering in the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Law on health and safety (OHS) and its regulations;

- Control of Environmental Protection;

- Control of compliance of materials and products and other similar activities.

The specific responsibilities of the Contractor are performing:

9 TDA; and

178 of TDA. Construction supervision is carried out in accordance with the requirements mandatory coverage of LSP, the requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- Exercise of continuous construction supervision over the implementation of works under

Construction-site supervision services

Община Варна | Published March 24, 2017  -  Deadline May 4, 2017
cpvs
71521000, 71520000

The subject of the contract relates to the selection of contractors to assess the compliance of investment projects and construction supervision of 5 site assigned to engineering in implementing the project - "Aesthetics and modernization of the urban environment in Varna".

The specific responsibilities of the contractor are performing:

9 TDA; and

178 of TDA. Construction supervision is carried out in accordance with the requirements mandatory coverage of LSP, the requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Perform at least the following activities:

- Exercise of continuous construction supervision over the implementation of works under technical design and requirements of the regulations;

- Check the executed works on quantities and prices and signing of protocols acceptance of the completed works drawn up by the contractor for engineering in the respective lot / former model act № 19 /;

72/2003) before, during construction works and after their completion;

- Ensuring compliance with the conditions for safety, according to the Law on health and safety (OHS) and its regulations;

- Control of Environmental Protection;

- Control of compliance of materials and products and other similar activities.

Construction work

Технически Университет — Варна | Published March 25, 2017  -  Deadline May 1, 2017
cpvs
45000000

(1) Subject to this contract is a major repair and maintenance of the buildings of the Technical University of Varna. External refurbishment including delivery and installation of joinery. Outside insulation activities. Exterior rendering of buildings. Overhaul or partial repair of roofs and roofing. Laying of waterproofing. Repair and rehabilitation of the adjacent space around buildings.

(2) The types of activities maintenance and repairs in case such needs are identified in the Technical Specifications. In the process of realization of the contract concluded on the basis of this contract. TU Varna will pay only the actual work performed, commissioned by the established in the attached draft agreement on the proposed order of participants unit prices for the implementation of the service.

(3) If there is need TU Varna reserves the right to assign additional activities foreseen in the technical specifications, unit prices, which are proved by analysis.

Types of activities maintenance and repair of buildings of TU Varna are listed in the Technical Specifications. External refurbishment including delivery and installation of joinery. Outside insulation activities. Exterior rendering of buildings. Overhaul or partial repair of roofs and roofing. Laying of waterproofing. Repair and rehabilitation of the adjacent space around buildings.

Construction work

Община Варна | Published March 22, 2017  -  Deadline May 8, 2017
cpvs
45000000, 45200000, 45400000, 44912400, 45313000, 45313100, 44114250

The subject of the first lot of this procurement is related to choosing a contractor to do renovation, repair and partial reconstruction of the building of the Professional School of Forestry and Woodworking "Nikolay Haytov" c. Varna ". The second lot is subject - Overhaul and implementation of energy efficiency measures at the building of the Professional School of Economics "Dr. Ivan Bogorov" c. Varna ".

With business investment project activities are provided for the renovation of the building and the yard:

1. Sanitation - all housings of the main liaison by installing insulation or replacing old windows (doors and windows) with new ones in order to increase energy efficiency of the building;

2. Repairs Part Architecture - dismantling or removal of old equipment, cladding, walls, damaged plaster, damaged flooring and other damaged items from a building or yard.

3. Flooring - deletes the existing parquet floors from ground level of educational production casing in providing coverage plan with a total area of ​​646 m2 After repairing the existing basis with a new coat of 50% of the area of ​​the removed flooring is laid laminate with wear-resistance class AC4 thickness equal to or greater than 8 mm. On the periphery are installed PVC strips and corners.

4. Other elements of the building and repair yard - provides repair of equipment for toilets and wet rooms, waterproofing in the repair of boards, installation of new tin hat on boards repair of electrical wiring, plumbing and HVAC systems set in relevant parts. It provides repair of asphalt pavements and existing sidewalks, carve out new spaces, renovation of sports facilities, straightening existing loose lawns and related activities, including replacement of curbs or install new ones.

5. Partial reconstruction - covers part of the ground floor of ...

Construction work

Община Варна | Published April 5, 2017  -  Deadline May 22, 2017
cpvs
45000000, 45200000, 45400000, 44912400, 45313000, 45313100, 44114250

The subject of the first lot of this contract is related to choosing a contractor to do rehabilitation, repair and partial reconstruction of the building of the Professional School of Forestry and Wood "Nikolay Haytov" c. Varna ". The second lot is covered - Overhaul and implementation of energy efficiency measures in the building of the Professional School of Economics "Dr. Ivan Bogorov" c. Varna ".

Construction supervision within the project BG16RFOP001-3.002-0031 "Improvement and modernization of education infrastructure PGGSD and PGI, Varna with two lots

Община Варна | Published March 20, 2017  -  Deadline May 11, 2017
cpvs
71521000

The subject of the first lot of this procurement is related to the selection of a contractor who provide services related to construction supervision in carrying out construction work on the renovation, repair and partial reconstruction of the building of the Professional School of Forestry and woodworking "Nikolay Haytov" c. Varna. The second lot is subject - construction supervision in carrying out the overhaul and implementation of energy efficiency measures at the building of the Professional School of Economics "Dr. Ivan Bogorov" c. Varna.

Conformity assessment of investment projects and construction supervision for the sites assigned to the engineering part of the project "Aesthetics and modernization of the urban environment in Varna"

Община Варна | Published March 23, 2017  -  Deadline May 9, 2017
cpvs
71521000

The subject of the contract relates to the selection of contractors to assess the compliance of investment projects and construction supervision of five sites assigned to engineering in implementing the project - "Aesthetics and modernization of the urban environment in Varna".

"External construction works on the buildings of the Technical University of Varna"

Технически Университет - Варна | Published March 24, 2017  -  Deadline May 2, 2017
cpvs
45000000

(1) The subject of this contract is a major repair and maintenance of the buildings of the Technical University of Varna. External refurbishment including delivery and installation of joinery. External insulation activities. External plastering of buildings. Overhaul or partial repair of roofs and roof structures. Laying of waterproofing. Repair and rehabilitation of the adjacent space around buildings. (2) The types of activities maintenance and repairs in case such needs are identified in the Technical Specifications. In the process of realization of the contract concluded on the basis of this contract. TU Varna will pay only the actual work performed, commissioned by the established in the attached draft agreement on the proposed order of participants single prices for the service. (3) In case of necessity TU Varna reserves the right to assign additional activities foreseen in the technical specifications, unit prices, which are proving analysis

Performance of the consultant for the objects within the project "Modernization of the educational infrastructure in the city of Varna"

Община Варна | Published March 20, 2017  -  Deadline May 9, 2017
cpvs
71521000

The subject of the contract relates to the selection of contractors to exercise construction supervision during construction of five sites in the implementation of the project - "Modernization of the educational infrastructure in the city of Varna" and to assess the compliance of investment projects construction supervision of five other object entrusted to the engineering in implementing the same project.

Rental of construction machinery operator - bulldozer to clean breaks of 110 and 220kV transmission lines operated by ESO, MER Varna

Мрежови експлоатационен район/МЕР/ ЕАД - Варна към ЕСО | Published March 28, 2017  -  Deadline April 24, 2017
cpvs
77211300

Submitted bids will be opened publicly at the date and time indicated in the notice on the premises of the contracting authority at:. Varna, ul.Oborishte № 13A, 5th floor, boardroom, st.518. The opening may be attended by representatives of the participants. Listing and other documents related to the contract are published on the buyer profile at the address above.

Construction of five sites from investment priority "Educational infrastructure 'within the project" Modernization of the educational infrastructure in the city of Varna "

Община Варна | Published March 20, 2017  -  Deadline May 5, 2017
cpvs
45000000

The subject of the first lot of this procurement is related to choosing a contractor to do the reconstruction, overhaul and implementation of energy efficient measures at the I Primary School, c. Varna. The second lot is subject - implementation of energy efficiency measures on building VII University "Nayden Gerov" c. Varna, the third position is for reconstruction, overhaul and implementation of energy efficient measures the building of Sofia University "Dimtcho Debelyanov" town. Varna. The fourth lot is subject - reconstruction, overhaul and implementation of energy efficient measures the building of Sofia University "P. Kr. Iavorov "c. Varna, and the fifth and final position is subject - reconstruction, overhaul and implementation of energy efficient measures of filial building of school" Konstantin Arabadziev "c. Varna.

Execution of engineering projects within the project "Aesthetics and modernization of the urban environment in Varna"

Община Варна | Published March 23, 2017  -  Deadline May 9, 2017
cpvs
45000000

The subject of the contract relates to the selection of a contractor / contractors to develop investment projects in the phase of technical projects, carry out works and to carry out supervision during the construction of five lots on the project "Aesthetics and modernization of the urban environment in Varna" Varna Municipality in procedure BG16RFOP001-1.002.

Constructing an PROJECT "multifunctional center for teaching in primary education" School for visionary "school" PETKO R.Slaveykov "- Varna and" constructing an repair of school "PETKO R.Slaveykov" - GR .VARNA "by lots: Lot №1:" constructing an PROJECT "multifunctional center for teaching in primary education" SCHOOL OF visionary "OU" PETKO R.Slaveykov "- Varna" LOT №2 "constructing an repair of school" PETKO R.Slaveykov "- Varna"

Основно училище /ОУ/ "П.Р. Славейков" - гр. Варна | Published April 18, 2017  -  Deadline May 12, 2017
cpvs
45200000

Engineering of five sites from investment priority "Educational infrastructure 'within the project" Modernization of the educational infrastructure in the city of Varna "

Община Варна | Published March 20, 2017  -  Deadline May 5, 2017
cpvs
45000000

The subject of the contract relates to the selection of contractors to develop investment projects in the phase of technical projects, carry out works and to carry out supervision during the construction of five lots of the project "Modernization of the educational infrastructure in the city of Varna" of Varna Municipality in procedure BG16RFOP001-1.002. The first lot is for repair and implementation of energy efficiency measures at school "Stefan Karadzha". Lot 2 has a subject - repair, implementation of energy efficiency measures and furnishings DG № 1 "Firefly." Lot 3's subject - repairs, gas and equipment SG № 41 "First of June" (with nursery group). Lot 4 is the subject - overhaul subsidiary of SG № 12 "Ian Bibian" and Lot 5's subject - repair and implementation of energy efficiency measures in the building of the school "Nikola Vaptsarov".

Event services

Община Варна | Published March 22, 2017  -  Deadline May 8, 2017
cpvs
79952000, 22140000, 22150000, 22852100, 18331000, 79341000, 30234600, 30192121, 22816100, 18936000, 30199792

The subject of the contract relates to the selection of a contractor / contractors for publicity and visualization during implementation of the project № BG16RFOP001-1.002-0001 "Modernization of the educational infrastructure in the city of Varna" Project № BG16RFOP001-1.002-0002 " aesthetics and modernization of the urban environment in Varna "and project № BG16RFOP001-1.002-0003" integrated urban transport of Varna - the second phase, "financed by the procedure BG16RFOP001-1.002" Implementation of integrated plans for urban regeneration and development from 2014 to 2020 Varna " Priority axis 1 "Sustainable and integrated urban development" Operational program "Regions in growth viewing" 2014 - 2020

1. Leaflet - Size A4 (not folded), 4 folds, double-sided glossy paper 120 g / m 2 4 + 4 colors - 350 pcs.

2. Booklet, 12 pp., Size 225/216 mm in the unfolded form 4 + 4 colors, 130 g / m 2 double-sided glossy or mat, sewing with two staples - 350 pcs.

3. Folders - A4, 300 gr., Sided chrome with a pocket full color - 350 pcs.

4. T-shirts - monochrome, color: choice of the contracting authority specified after conclusion of the contract, 100% cotton, minimum 180 g / m 2 Branded screen printing / thermal transfer, sizes S (100 pcs), M (100 pcs.), L (150 pcs.), XL (150 pcs.), 2XL (150 pcs.) - 650 pcs.

30 people - a total of 2 pieces.

30 people - 10 pcs.

30 people - 10 pcs.

4. Banners - 10 pcs.

5. Temporary billboards during construction - 10.

6. Permanent explanatory plaque - 10.

7. Portable USB flash drives, minimum 16 GB, with the possibility of printing - 150 pcs.

8. Pens mechanism branded with the pad / screen printing - 350 pcs.

1. Leaflet - Size A4 (not folded), 4 folds, double-sided glossy paper 120 g / m 2 4 + 4 colors - 300 pcs.

2. Booklet, 12 pp., Size 225/216 mm in the unfolded form 4 + 4 colors, 130 g / m 2 double-sided glossy or mat, sewing with two staples - 300 pcs.

100 sheets - 150 pcs.

4. Folders - A4 250 grams, double-sided chrome with a pocket full color - 200 pcs.

5. Promotional bags - branded paper kraft 130 g / sq. m size D24 + 9/36 cm drawstring cotton / polypropylene reinforcement handles and bottom - 150 pcs.

6. T-shirts - monochrome, color: choice of the contracting authority specified after conclusion of the contract, 100% cotton, minimum 180 g / m 2 Branded screen printing / thermal transfer, sizes S (50 pc), M (50 pcs.), L (50 pcs.), XL (100 pcs.), 2XL (50 pcs.) - A total of 300 units.

30 people - 2.

30 people - 7 pcs.

30 people - 7 pcs.

4. Banners - 2 pcs.

5. Temporary billboards during construction - 20.

6. Permanent explanatory plaque - 20.

7. Portable USB flash drives, minimum 16 GB, with the possibility of printing - 150 pcs.

8. Pens metal mechanism branded with the pad / screen Print- 200 pcs.

9. Keychain - metal -brandirani screen printing - 150 pcs.

10. Aluminium business card - branded engraving / screen printing - 150 pcs.

1. Leaflet - Size A4 (not folded), 4 folds, double-sided glossy paper 120 g / m 2 4 + 4 colors - 478 pcs.

2. Booklet, 12 pp., Size 225/216 mm in the unfolded form 4 + 4 colors, 130 g / m 2 double-sided glossy or mat, sewing with two staples - 600 pcs. (2 types 1h500 upon completion of project activities and the number 1x100 number before the ceremony "supply bus").

100 sheets - 300 pcs.

4. Folders - A4, 300 gr., Sided chrome with a pocket full color - 300 pcs.

5. T-shirts - monochrome, color: choice of the contracting authority specified after conclusion of the contract, 100% cotton, minimum 180 g / m 2 Branded screen printing / thermal transfer, sizes S (100 pcs), M (100 pcs.), L (100 pcs.), XL (100 pcs.), 2XL (100 pcs.) - A total of 500 units.

6. The three-section wall calendar, with three sections and head - Expanded dimensions 705h310 mm, Bulgarian, reference information: the number of working days in the month, Bulgarian church holidays, international holidays; 3 separate body size 290h140 mm each, printing in 2 colors offset with a very high degree of whiteness, SMYK (color) fixtures with perforation and colored decorative hat, company head individual design size 310h220 mm, punching base 300 g / m 2 cardboard, folding and creasing with "ears" for better adhesion of the bodies, window without bands in the color of their bodies, 200 pcs. three calendar years - 600 pcs.

380H280H80 mm double lined bag main barrier with zipper and a small inner zip pocket, without PVC, with short and long handles, branded screen printing / transfer - 300 pcs.

8. Stickers buses - 76 pcs., Size 80/50 cm, weather-resistant PVC folio.

30 people - 2.

40 people - 7 pcs.

40 people - 7 pcs.

40 people - 1.

5. Banners - 1 pc.

6. Temporary billboards during construction - 16 pcs.

7. Permanent vol

  • 1