EBRD - Construction of three gas transmission pipelines in Bulgaria

Bulgartransgaz EAD | Published February 7, 2017
cpvs
45231220, 44161100, 71310000

EBRD - Construction of three gas transmission pipelines in Bulgaria

EBRD - Construction of a new 400 kV power line in Bulgaria

Elektroenergien Sistemen Operator EAD | Published January 27, 2017
cpvs
45231400, 71310000

EBRD - Construction of a new 400 kV power line in Bulgaria

Construction work

Софийски университет „Св. Климент Охридски“ | Published January 27, 2017  -  Deadline March 7, 2017
cpvs
45000000, 45200000

This contract includes the execution of engineering (design, construction and supervision) for "Repair and reconstruction of the building of housing" B "on campus" Lozenets "Sofia University" St. Kliment Ohridski '. " The activities to be performed are:

1. Preparation of detailed design according to SPA, Decree № 4 OF 21/05/2001 on the scope and content of investment projects and other normative acts of the TDA;

2. Implementation of construction under Part 3 "construction" of the SPA after the issuance of a building permit for the envisaged technical specifications and construction works

162 TDA.

The main activities detailed design should provide and works, to be carried out on the building are detailed in the technical specification.

This contract includes the execution of engineering (design, construction and supervision) for "Repair and reconstruction of the building of housing" B "on campus" Lozenets "Sofia University" St. Kliment Ohridski '. " The activities to be performed are:

1. Preparation of detailed design according to SPA, Ordinance № 4 of 21.05.2001 on the scope and content of investment projects and other normative acts of the TDA;

2. Implementation of construction under Part 3 "construction" of the SPA after the issuance of a building permit for the envisaged technical specifications and construction works

Construction work

Национална агенция за приходите | Published February 15, 2017  -  Deadline February 24, 2017
cpvs
45000000

The object of the contract is construction, including design and implementation of construction works of the administrative building, managed by the Agency, address: c. Sofia, bul. "Tsarigradsko Shosse" № 111. The construction works to be designed and implemented under the contract are to perform overhaul under item. 42 § 5 of the Additional provisions of the Law on Spatial Planning (LSP), including the separation of the administrative offices of contracting personnel, salon services training rooms and archive areas in accordance with the requirements of current legislation and requirements of the contracting authority expressly referred to in this technical specification and those further specified in the order indicated therein. Contractor should pursue and guarantee activities in the terms set out in its technical proposal and subject to the conditions specified in the contract.

Construction work

„ЧЕЗ Разпределение България“ АД | Published February 4, 2017  -  Deadline March 9, 2017
cpvs
45000000, 45232210

"CEZ Distribution Bulgaria" held an open procedure with subject "Removing the power meters of height in separate quarters of the territory served by the" CEZ Distribution Bulgaria "," Ref. № PPC 16-128.

The subject of the contract is divided into 7 lots as follows:

1. Download el. Panels of height in separate neighborhoods in the city of Sofia;

2. Download el. Panels of height in separate quarters in Sofia area;

3. Removing the power. Boards of height in separate quarters on the territory of Blagoevgrad;

4. Removing the power. Boards of height in separate neighborhoods in Pernik and Kyustendil areas;

5. Remove the el. Panels of height in separate quarters of the territory of Pleven, Vratsa and Lovech areas;

6. Download el. Panels of height in separate quarters on the territory of Vidin and Montana districts;

7. Removing the power. Tray height of the territory of the district. Mladenovo in town. Lom.

Removing the power meters of height in separate neighborhoods in the city of Sofia.

The main types of construction works and estimated amounts, including, but not limited to: installation of steel-cord 7.5 m 40 pc .; installation of concrete pillars: 250-30 pcs., 590-30 pcs., 835-30 pc .; ON installation of LV with suitable fittings for interpole 40 meters-from 3x35 + 54 mm 2 3h150 to + 70 mm 2 -350 Pcs., To 4.times.25 mm 2 - 140 pcs .; download and connecting the insulated (twisted) cable up to 12 meters for powering electric meter box and connect to the network with appropriate accessories - 540 pcs .; downloading and connecting air service pipes from the meter to the building board / pillar / a boom lift / air insulated (twisted) wire, a length of 30 meters, suitable fittings and mounting stud with eye Tightener wall-4180 pcs .; dismantling of: existing building branch-4180 pcs., an existing reinforced concrete pillar-300 pcs., of uninsulated pro ...

Construction-related services

„ЧЕЗ Разпределение България“ АД | Published January 28, 2017  -  Deadline March 2, 2017
cpvs
71500000

166 of the SPA to assess the compliance of the investment project and the exercise of independent supervision for the project: "Replacement of oil-filled cable transmission line 110 kV" Enos "linear knife disconnectors 110 kV PS" Dimitar Dimitrov "a linear knife disconnectors 110 kV PS "Hippodrome", Ref. № PPS 16-124. 

The subject of this contract includes assessing the compliance of prepared projects and the exercise of independent supervision of the said object in its overall performance and putting it into operation, which is certified with authorization for use.

166 of the SPA to assess the compliance of the investment project and the exercise of independent supervision for the project: "Replacement of oil-filled cable transmission line 110 kV" Enos "linear knife disconnectors 110 kV PS" Dimitar Dimitrov "a linear knife disconnectors 110 kV PS "Hippodrome", Ref. № PPS 16-124.

Upon execution of the subject of this contract the contractor should conduct a project: "Replacement of oil-filled cable transmission line 110 kV" Enos "linear knife disconnectors 110 kV PS" Dimitar Dimitrov "a linear knife disconnectors 110 kV PS" Hippodrome "these activities:

166 of the Law on Spatial Planning (LSP) and reporting on conformity assessment;

B) Supervision of works in execution of construction - installation work on site in accordance with the SPA and regulations. Establish a protocol for the detection of a construction site and determining the construction line and level; compilation, completion and validation of the order book of the construction and signing all kinds of acts and protocols during construction as required by legal regulations, including Regulation 3 of 31.7.2003 on drawing up acts and protocols during construction, with which legally is certified implementation of the works, with a view to his responsibility for the final documentation of completed construction for permission to use;

176a of the SPA and Decree № 5 of 28.12.2006 for Technical passport;

D) Geodetic and provide a certificate from the Agency for Geodesy, Cadastre and Cartography;

6 of the TDA.

Performance of the contract under this contract will be performed depending on the readiness of award and performance related to the implementation of this procurement activities - design and construction. The contracting authority shall notify the contractor to document the outsourcing of the date of commencement of operations. Performance begins after drafting and signing of the document / s for outsourcing by the developer and contractor.

Acceptance of the work on any document outsourcing is done with acceptance protocol signed by the two countries. The periods when the activities of the subject of the contract shall indicate in any document outsourcing.

The deadline for implementation and commissioning of the project: "Replacement of oil-filled cable transmission line 110 kV" Enos "linear knife disconnectors 110 kV PS" Dimitar Dimitrov "to the linear blade 110 kV circuit breaker in LV" Hippodrome "is d 11/30/2017 ., but not later than eighteen (18) months from the date of signing the contract for construction.

The contract term of this contract is to finalization construction of the project: Replacement of oil-filled cable transmission line 110 kV "Enos" linear knife disconnectors 110 kV PS "Dimitar Dimitrov" a linear knife disconnectors 110 kV PS "Hippodrome" attested by receipt by the developer permission to use the site and determined the duration of the project and construction works of the object technology deadline for finalization of the construction papers and authorization for use of the construction, but not more than 18 months from the date of conclusion.

Construction-site supervision services

ДП „Фонд затворно дело“ | Published February 11, 2017  -  Deadline March 22, 2017
cpvs
71521000

Performance of the contract includes the preparation of an investment project in phase detailed design, exercising supervision during the execution of construction works on site in accordance with Art. 162, para. 2 and par. 3 of the Law on Spatial Planning and execution of the works in accordance with Part Three "Construction" by TDA.

The subject of the contract includes the preparation of an investment project in phase detailed design, exercising supervision during the execution of construction works on site in accordance with Art. 162, para. 2 and par. 3 of the Law on Spatial Planning and execution of the works in accordance with Part Three "Construction" by TDA.

Road construction works

Агенция „Пътна инфраструктура“ | Published February 18, 2017  -  Deadline March 23, 2017
cpvs
45233120

Continued from field II.1.1) (...), including the adjacent road connections, security of travel gear and accessories under the motorway on the territory of Sofia RRA, RRA Pernik and Kyustendil RRA, managed by RIA. "

The object of this OP is: "Maintenance (preventive, current, winter and repair and rehabilitation works in emergency situations) AM" Lyulin "and" Struma "from km 0 +000 to km 56 + 170 incl. and associated road connections, security of travel gear and accessories under the motorway on the territory of Sofia RRA, RRA Pernik and Kyustendil RRA, managed by RIA. " The subject of OP incl. implementation of these activities, c / o related to the performance of maintenance (preventive, current, winter and repair and rehabilitation works in emergency situations) and are provided or consequence addition to it: Preventive maintenance incl. ff. AHF. activities: closing of cracks on the surface of the pavement; Application of surface treatments on the macadam and asphalt; laying a new wearing layer (overlays); stabilization center (by mechanical or chemical approach); reinforcement of slopes (organic, ready reinforced concrete with steel mesh, with geo-textile materials, etc.); conducting periodic health activities in the construction of road facilities; conducting periodic health activities in the construction of road equipment (road signs, restraint systems, rails, safety nets, lighting installations, etc.); and-recreation repair work on the construction of road facilities. Current maintenance incl. ff. AHF. activities: cleaning of small landslides, landslides and debris; mowing, leveling, profiling and shaping banquets; mowing on slopes restrictive and dividing lines, recreation grounds and other lawns; filling and reinforcement of slopes in some places; cleaning and / or restoration of berms, 'pocket' walls and other supportive facilities; cleaning and removal of ...

Building construction work

Столична община — район Студентски | Published February 11, 2017  -  Deadline March 15, 2017
cpvs
45210000, 71520000, 71247000

103. 

21 'put into operation in 1983, consisting of 48 apartments, 8 floors. The total area is 5574 m2 amount and nature of the works are in the documentation of the developer, the specifics and characteristics listed in the passport of the building.

103, commissioned in 1979, consisting of 153 apartments, 18 (17+ technical floor) floors. The total area is 15,660 square meters quantity and nature of the works are in the documentation of the developer, the specifics and characteristics listed in the passport of the building.

21 (at Lot 1) that service should be provided in volume and in accordance with the documents approved by the contracting authority.

103 (for lot 2) that service should be provided in volume and in accordance with the documents approved by the contracting authority.

The service includes exercising control activities in performing design and construction, according to the approved documentation of the client.

Architectural, construction, engineering and inspection services

„ЧЕЗ Разпределение България“ АД | Published January 28, 2017  -  Deadline March 6, 2017
cpvs
71000000

"CEZ Distribution Bulgaria" held an open procedure for the award of public procurement: "Preparation of complete project documentation for construction, reconstruction and repair of transformers, cables and overhead MV and LV and export of power meters of the property boundary of the territory Operational center of Sofia Province ", Ref. № PPS 16-111.

The territory of OC Sofia Province covers the following municipalities: Kostenets, Dolna Banya, Ihtiman, Samokov, Slivnitsa, Dragoman, Bojurishte Kostinbrod, Godech, Svoge, Botevgrad, Pravets, Etropole, Pirdop, Koprivchitsa, Elin Pelin, Gorna Malina, Zlatitsa Chavdar Chelopech, Mirkovo, Anton.

The main types of activities that are envisaged for implementation are preparing work projects: construction of a new power station, reconstruction of existing power substation, construction of cable and overhead line MV, construction of cable and overhead line NN, removal and installation of power meters on the border property.

The main types of activities and approximate amounts are as follows: Detailed design range - Part Electric Part Overall, Part Architectural-Construction of a new substation 1h800 kVA-40 pcs .; Detailed design in Range-Electric Part, Part Overall, Part Architectural-Construction of a new power station 2x800 kVA-6 pcs .; Detailed design, reconstruction, reconstruction of electrical part MV and LV with replacement / installation of power transformer on an existing substation-60 pcs .; Detailed design Part "Overall" for the reconstruction of the AC of the existing power substation-6 pcs .; Detailed design of mechanical ventilation for existing transformer-4 pcs .; Detailed Design for Cable line (KL) MV-Part-Electric 7000 meters track; Detailed design for Skyway MV-Part-Electric 9000 meters track; Detailed design for Skyway NN-Electric Part 9000 meters track; Detailed design for KL LV in piping Part-Electrical-4000 m track; Detailed design for KL LV free pit-Part-Electric 9000 meters track; Detailed design for installation of power meters, electrical works ...

Architectural, construction, engineering and inspection services

„ЧЕЗ Разпределение България“ АД | Published January 21, 2017  -  Deadline February 23, 2017
cpvs
71000000

"CEZ Distribution Bulgaria" held an open procedure with subject "Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of Destination Sofia region and Pleven," Ref . № RRS 16-110.

The subject of the contract is divided into 3 lots, as follows:

1. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Pernik, Kyustendil"

2. Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Vratsa, Lovech"

3. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-region "Vidin-Montana."

Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of "Pernik, Kyustendil."

The main types of activities and approximate amounts as follows:

- Rab. Projects range in part "Electric" part "Construction" part "Architecture" - 8. Construction of a new substation 1h800 kVA and 3 pcs. to build a new power station 2x800 kVA;

- Rab. Projects section "Electric": Connection to the busbars to 1 kV existing trafopost- 5 pcs., Joining busbars 1 kV up to 35 kV an existing substation-5 pcs., Reconstruction of part Electrical MV and LV with replacement / installation of power transformer existing substation-25 pcs., cable lines MV-8000 m-route Skyway LV-5000 m-route Skyway MV with AC wiring for 1 triplet-1000 m-route Skyway MV with AC wires 2 triples 1-pole line 500 m-track, on ...

Works for complete or part construction and civil engineering work

Софийски университет „Св. Климент Охридски“ | Published February 15, 2017  -  Deadline March 23, 2017
cpvs
45000000, 45200000

This contract includes the execution of engineering (design, construction and supervision) for "Repair and reconstruction of the building of housing" B "on campus" Lozenets "Sofia University" St. Kliment Ohridski '. " The activities to be performed are:

1. Preparation of detailed design according to SPA, Decree № 4 OF 21/05/2001 on the scope and content of investment projects and other normative acts of the TDA;

2. Implementation of construction under Part 3 "construction" of the SPA after the issuance of a building permit for the planned works in the technical specifications; and

3. Exercise of supervision in accordance with Art. 162 TDA.

The main activities detailed design should provide and works, to be carried out on the building are detailed in the technical specification.

"Security system for cable routes cascade" Belmeken - Sestrimo "construction and repair of cable runs in four lots'

Национална електрическа компания (НЕК) ЕАД | Published February 2, 2017  -  Deadline March 1, 2017
cpvs
50331000

Security system for cable routes cascade "Belmeken - Sestrimo" construction and repair of cable routes

Works for complete or part construction and civil engineering work

„ЧЕЗ Разпределение България“ АД | Published January 21, 2017  -  Deadline February 24, 2017
cpvs
45200000

Contract award is due to the need for maintenance of the equipment belonging to the substations owned by the "CEZ Distribution Bulgaria", as well as building units (rooms, facades, roofs and more. Items), representing site energy facilities, the allocation of power. energy, to improve the functional status of facilities and hence increase their service life and reliability. Types of work are described in the attached documentation to participate bill of quantities (KSF). The ranking will be completed by criterion "lowest price". The contract term is three (3) years from the date of its signing by the two countries or to reach its maximum value in BGN without VAT, depending on which date comes first. Bidders must meet the requirements for the personal situation and selection criteria set by the contracting authority.

"CEZ Distribution Bulgaria" held an open procedure for the award of public procurement "Implementation of construction and repair works in substations and adjacent facilities within the" CEZ Distribution Bulgaria ", Sofia region and Sofia region. Contract award is due to the need for maintenance of the equipment belonging to the substations owned by the "CEZ Distribution Bulgaria", as well as building units (rooms, facades, roofs and more. Items), representing site energy facilities, the allocation of power. energy, to improve the functional status of facilities and hence increase their service life and reliability. Types of work are described in the attached documentation to participate bill of quantities (KSF). Each participant valued applied in this documentation KSF. Types of work include but are not limited to: Mechanical excavation for foundations and collectors - 150 m ?; Cutting of concrete pavements to ...

Construction work

Софийски университет „Св. Климент Охридски“ | Published January 24, 2017  -  Deadline February 27, 2017
cpvs
45000000, 45200000, 45300000, 45400000

В рамките на настоящата обществена поръчка следва да се извършат строително-монтажни, строително-ремонтни работи и консервационно — реставрационни работи по обекти, групирани по 4 /четири/ обособени позиции.

Преди започване и по време на изпълнението на възложените работи, изпълнителят трябва да:

— Анализира и проверява всички данни;

— Да провери всички количества, отразени в количествените сметки;

— Да прегледа обекта и да получи цялата необходима информация;

— Да направи допълнителни измервания и калкулации;

— Да изясни всички задачи;

— Да оцени типа оборудване и съоръжения, необходими за изпълнение на работите посочени в спецификациите;

— Да изиска от възложителя цялата налична информация, която е необходима с оглед изпълнението на дейностите, включени в предмета на поръчката.

Подробно описание на дейностите може да намерите в Техническата Спецификация.

„Извършване на строително — монтажни работи /СМР/, строително-ремонти работи /СРР/ и консервационно — реставрационни работи /КРР/ на сгради паметници на културата в гр. София и страната“:

— Ректорат и Университетска библиотека — гр. София, бул. „Цар Освободител“ № 15;

— Факултет по журналистика и масова комуникация и Университетски ботанически градини — гр. София, ул. „Московска“ № 49;

— Биологически факултет — гр. София, бул. „Драган Цанков“ № 8;

— Богословски Факултет — София 1000, пл. „Света Неделя“ 19;

— УНБ гр. Елена, общ. Елена;

— УНБ с. Жеравна, общ. Котел;

— Всички прилежащи сгради и постройки към изброените имоти.

Подробно описание на дейностите може да намерите в Техническата спецификация.

„Извършване на строително — монтажни работи /СМР/ и строително-ремонти работи /СРР/ на сгради в гр. София и Учебни бази в страната“:

— Факултет по начална и предучилищна педагогика — гр. София, бул. „Шипченски проход“ № 69 А;

— Департамент за езиково обучение — ИЧС — гр. София ул. „Коста Лулчев“ № 27;

— Кампус Изток — Философски факултет — гр. София, бул. „Цариградско шосе“ № 125, блок 4;

— Университетска ботаническа градина — гр. София, ул. „Московска“ № 49;

— Кампус Лозенец — Факултет по химия и фармация, Математически факултет и Физически факултет;

— Център за източни езици и култури — гр. София, бул. „Тодор Александров“ № 79;

— Институт Конфуций — гр. София, бул. „Александър Стамболийски“ № 82;

— Център за славяно-византийски проучвания „Проф. Иван Дуйчев“ — гр. София, ул. „Проф. Иван Дуйчев“ № 18;

— Департамент за информация и усъвършенстване на учители — гр. София, бул. „Цар Борис ІІІ“ № 224.

— Апартаменти:

— Апартамент № 1, Мусагеница;

— Апартамент № 22, ж.к. „Дружба“ 2, бл. 262;

— Апартамент № 27, ж.к. „Дружба“ 2, бл. 262;

— Апартамент № 38, ж.к. „Дружба“ 2, бл. 262;

— Апартамент № 41, ж.к. „Дружба“ 2, бл. 262;

— Апартамент № 42, ж.к. „Дружба“ 2, бл. 262;

— Апартамент № 13, ж.к. „Дружба“ 2, бл. 258;

— Апартамент № 75, ж.к. „Дружба“ 2, бл. 258;

— Апартамент № 78, ж.к. „Дружба“ 2, бл. 258;

— Апартамент № 40, ж.к. „Лагера“, ул. „Смолянска“ № 56, вх. Б, ет. 6, ап. 40;

— Апартамент № 64, ул. „Боряна“ № 63, бл. 5А;

— Апартамент № 56, ж.к. „Левски В“, бл. 10, вх. В, ет. 4;

— УНБ м. Гюлечица, общ. Самоков;

— Училищен комплекс с. Славейно, общ. Смолян;

— ТБ м. Бялата вода, общ. Велинград;

— УНБ м. Широка поляна, общ. Батак;

— УНБ гр. Земен, общ. Земен;

— Всички прилежащи сгради и постройки към изброените имоти.

Подробно описание на дейностите може да намерите в Техническата спецификация.

„Извършване на строително- монтажни работи /СМР/ и строително-ремонти работи /СРР/ на сгради към Поделение „Социално-битово обслужване“:

— Поделение „Социално битово обслужване“ — гр. София, блок 42Б, ж.к. „Студентски град“;

— Студентско общежитие блок № 57 АБВ;

— Студентско общежитие блок № 8;

— Студентско общежитие блок № 17;

— Студентско общежитие блок № 18;

— Студентско общежитие блок № 52 АБВ;

— Студентско общежитие блок № 55 АБ;

— Студентско общежитие блок № 41 АБ;

— Студентско общежитие блок № 42 Б;

— Студентско общежитие блок № 50 АБ;

— Студентско общежитие блок № 51;

— Студентски стол № 1;

— Студентски стол № 4;

— Студентски стол № 5;

— Всички прилежащи сгради и постройки към изброените имоти.

Подробно описание на дейностите може да намерите в Техническата спецификация.

„Извършване на строително- монтажни работи /СМР/ и строително-ремонти работи /СРР/ на сгради в район „Черноморие“:

— Университетски ботанически градини — Варна, к.к. Св. Св. Константин и Елена;

— Университетски ботанически градини — Балчик, ул. „Акад. Даки Йорданов“ № 1;

— Творчески дом гр. Китен;

— УНБ с. Черноморец, общ. Созопол;

— УНБ с. Свети Влас, общ. Несебър;

— УНБ с. Синеморец, общ. Царево;

— Всички прилежащи сгради и постройки към изброените имоти.

Подробно описание на дейностите може да намерите в Техническата спецификация.

Maintenance of plumbing and repair of buildings in architectural and construction of the University Hospital "St. Anna" - Sofia

УМБАЛ Света Анна - София АД | Published February 6, 2017  -  Deadline March 10, 2017
cpvs
45000000

The object of the procedure is the maintenance of plumbing and repair of buildings in architectural and construction of the University Hospital "St. Anna" - Sofia / Building repairs / depending on the specific needs of Vazlozhitelya.Podrobno description of the construction and renovation work on the type is presented in the Terms of reference prepared by the Contracting Authority and attached to the documentation for the procedure. TOR includes: * value * value of work material offers the participants to perform the contract must be in full compliance with the terms of reference and requirements specified in the documentation prepared by Vazlozhitelya.Uchastnitsite submit only one tender for the execution of the contract as not allow presentation of options. The implementation period of the contract is 24 months or to absorb the amount of one million lev, VAT excluded.

Play. engineering, design, and construction avt.nadzor VV with modernization and renovation of the learning environment guarantor for improving the quality, attractiveness and effectiveness of the National Academy Kr.Sarafov

Национална академия за театрално и филмово изкуство /НАТФИЗ/ Кръстьо Сарафов | Published January 26, 2017  -  Deadline March 7, 2017
cpvs
45214400

The main objective of the contract is the choice of contractor to carry out engineering - design, construction, supervision. The activity includes the following sub-activities: - Preparation of an investment project in phase "Technical project" subject to "overhaul and partial reconstruction of the building of the National Academy of str." Stefan Karadja "№ 20 g. Sofia"; - Perform supervision by the designer during construction and commissioning of the works in accordance with Bulgarian law; -Make Renovation works (construction), according to the report prepared by the Contractor and approved by the Principal Investment project for construction, according to the explanatory memorandum, quantitative account of the types of work, specifications and details of the project on schedule for completion of construction regulations and orders in the order book building permit and the requirements of technical specifications and requirements for order execution

Construction work

Агенция за социално подпомагане | Published February 17, 2017
cpvs
45000000, 45400000, 45300000

Performing works of administrative buildings used by the ASA and its territorial structures.

Tsyalost.proektna preparation of documentation for construction, reconstruction and repair of power stations, kab.i vazd.linii MV and LV switchboards and removal of the property boundary of teritor.na OC Sofia Province

ЧЕЗ Разпределение България АД | Published January 30, 2017  -  Deadline March 7, 2017
cpvs
71000000

"CEZ Distribution Bulgaria" held an open procedure for the award of public procurement: "Preparation of complete project documentation for construction, reconstruction and repair of transformers, cables and overhead MV and LV and export of power meters of the property boundary of the territory Operational center of Sofia Province ", Ref. № PPS 16-111. The territory of OC Sofia Province covers the following municipalities: Kostenets, Dolna Banya, Ihtiman, Samokov, Slivnitsa, Dragoman, Bojurishte Kostinbrod, Godech, Svoge, Botevgrad, Pravets, Etropole, Pirdop, Koprivchitsa, Elin Pelin, Gorna Malina, Zlatitsa Chavdar Chelopech, Mirkovo, Anton. The main types of activities that are envisaged for implementation are preparing work projects: construction of a new power station, reconstruction of existing power substation, construction of cable and overhead line MV, construction of cable and overhead line NN, removal and installation of switchboards border property.

"Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV in the city.

ЧЕЗ Разпределение България АД | Published January 30, 2017  -  Deadline March 7, 2017
cpvs
71320000

The subject of the contract is divided into three lots as follows: Lot 1 - "Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV in the city. Sofia "- OC" East ". Lot 2 - "Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of Sofia" - OC "West" .Obosobena position 3 - " preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of Sofia "- OC" North ".