Construction-site supervision services

Главна дирекция „Пожарна безопасност и защита на населението“ — МВР | Published January 11, 2017  -  Deadline February 9, 2017

The selected contractor shall perform advisory services to art. 166, para. 1 of the Law on Spatial Planning to draw up a comprehensive report assessing the compliance of the project with the essential requirements for construction and construction supervision during construction and control of the quantity, quality and compliance of the performed construction works and used materials including performance obligations coordinator of health and safety in accordance with Decree № 2 from 22.03.2004 on the minimum health and safety in carrying out construction works and the exercise of investment control 6 center to enhance the readiness of the population to respond to floods .

Each center to enhance the readiness of the population to respond to floods consists of training center and Training complex.

Construction-site supervision services

Главна дирекция „Пожарна безопасност и защита на населението“ — МВР | Published December 28, 2016  -  Deadline January 30, 2017

The selected contractor shall perform advisory services to art. 166, para. 1 of the Law on Spatial Planning to draw up a comprehensive report assessing the compliance of the project with the essential requirements for construction and construction supervision during construction and control of the quantity, quality and compliance of the performed construction works and used materials including performance obligations coordinator of health and safety in accordance with Decree № 2 from 22.03.2004 on the minimum health and safety in carrying out construction works and the exercise of investment control 6 center to enhance the readiness of the population to respond to floods .

Each center to enhance the readiness of the population to respond to floods consists of training center and Training complex.

The selected contractor shall perform advisory services to art. 166, para. 1 of the Law on Spatial Planning to draw up a comprehensive report assessing the compliance of the project with the essential requirements for construction and construction supervision during construction and control of the quantity, quality and compliance of the performed construction works and used materials including performance obligations coordinator of health and safety in accordance with Decree № 2 from 03.22.2004 on the minimum health and safety in carrying out construction works and the exercise of investment control of six centers to increase the willingness of the population to respond to floods .

Each center to enhance the readiness of the population to respond to floods consists of training center and Training complex.

A detailed description of the training centers and educational training complexes available in the Technical Specifications.

Architectural, construction, engineering and inspection services

„ЧЕЗ Разпределение България“ АД | Published January 21, 2017  -  Deadline February 23, 2017

"CEZ Distribution Bulgaria" held an open procedure with subject "Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of Destination Sofia region and Pleven," Ref . № RRS 16-110.

The subject of the contract is divided into 3 lots, as follows:

1. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Pernik, Kyustendil"

2. Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Vratsa, Lovech"

3. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-region "Vidin-Montana."

Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of "Pernik, Kyustendil."

The main types of activities and approximate amounts as follows:

- Rab. Projects range in part "Electric" part "Construction" part "Architecture" - 8. Construction of a new substation 1h800 kVA and 3 pcs. to build a new power station 2x800 kVA;

- Rab. Projects section "Electric": Connection to the busbars to 1 kV existing trafopost- 5 pcs., Joining busbars 1 kV up to 35 kV an existing substation-5 pcs., Reconstruction of part Electrical MV and LV with replacement / installation of power transformer existing substation-25 pcs., cable lines MV-8000 m-route Skyway LV-5000 m-route Skyway MV with AC wiring for 1 triplet-1000 m-route Skyway MV with AC wires 2 triples 1-pole line 500 m-track, on ...

Construction of 20 kV cable lines, terminal equipment of cells in the substation, construction of junctions, construction of substations with cable lines from substations to switching stations and connection object

Национална компания индустриални зони ЕАД | Published December 23, 2016  -  Deadline January 24, 2017
1. equip the terminal cells №6 and № 30 in substation modern suburb "ESO" EAD; 2. Construction of tubular track in concrete casing and outside the sidewalks in town - without concrete housing, including tube fiber optic cable, and download all cables MV, starting with cells № 6 and № 30 to Nodal station 20 kv / 20 kV, in UPI v-000273, kv.15 - owned "National Company Industrial Zones" EAD. 3. Construction of a nodal station; 4. Construction of the cable line project nodal station in existing tubular packages of the contracting authority in sidewalks, construction of new substations and tubular track cable line HH of the new building CCTS to-person.

Works for complete or part construction and civil engineering work

„ЧЕЗ Разпределение България“ АД | Published January 21, 2017  -  Deadline February 24, 2017

Contract award is due to the need for maintenance of the equipment belonging to the substations owned by the "CEZ Distribution Bulgaria", as well as building units (rooms, facades, roofs and more. Items), representing site energy facilities, the allocation of power. energy, to improve the functional status of facilities and hence increase their service life and reliability. Types of work are described in the attached documentation to participate bill of quantities (KSF). The ranking will be completed by criterion "lowest price". The contract term is three (3) years from the date of its signing by the two countries or to reach its maximum value in BGN without VAT, depending on which date comes first. Bidders must meet the requirements for the personal situation and selection criteria set by the contracting authority.

"CEZ Distribution Bulgaria" held an open procedure for the award of public procurement "Implementation of construction and repair works in substations and adjacent facilities within the" CEZ Distribution Bulgaria ", Sofia region and Sofia region. Contract award is due to the need for maintenance of the equipment belonging to the substations owned by the "CEZ Distribution Bulgaria", as well as building units (rooms, facades, roofs and more. Items), representing site energy facilities, the allocation of power. energy, to improve the functional status of facilities and hence increase their service life and reliability. Types of work are described in the attached documentation to participate bill of quantities (KSF). Each participant valued applied in this documentation KSF. Types of work include but are not limited to: Mechanical excavation for foundations and collectors - 150 m ?; Cutting of concrete pavements to ...

Construction work

Министерски съвет | Published January 14, 2017  -  Deadline February 6, 2017

Сградата е от 1-ва категория съобразно чл. 137, ал. 1 от ЗУТ въз основа ПМС № 181 от 20.7.2009 г.

Строителството се извършва въз основа на изработен работен проект — за обект „Строително-монтажни работи на сградата и на част от сградните инсталации с въвеждане на енергоефективни мерки за Дом № 2 от комплекс Бояна по повод ползване на обекта за целите на председателството на Република България на Съвета на Европейския съюз през 2018 г.“.

Настоящият ремонт обхваща следните зони и части:

1. Подмяна на дограма на цялата сграда, вкл. демонтаж външни ролетни дървени щори, топлоизолация от вътрешната страна на помещенията, вкл. мазилки, шпакаловки, латекс, завиване с найлони и почистване след СМР;

2. Изпълняват се, съгласно проектите /по части архитектурна, ВиК, електро/ всички коти само в общите представителни части на блокове 4, 2Б и 2В /зали, ресторанти, фоайета, рецепция, санитарни възли и други/;

3. По част конструктивна — обхвата е само възстановяване на бетоново покритие и защита на бетонови повърхности на част от козирките на сградата.

4. По част ВиК — изпълняват се само демонтажни и монтажни дейности на санитарните възли на общите представителни части в блокове 4, 2Б и 2В и частта за подгряване хоризонталните и вертикални водосточни тръби и подмяна на част от тях;

5. Част Електро — изпълняват се силнотоковите инсталации /ел. табла, осветление, контакти/на всички коти само в общите представителни части на блокове 4, 2Б и 2В /зали, ресторанти, фоайета, рецепция, санитарни възли и други/. Изпълнява се и част „Мълниезащитна и заземителни инсталации на сградата“;

6. Част Дърводелски дейности — изпълняват се на всички коти съобразно разработен интериорен проект само в общите представителни части на блокове 4, 2Б и 2В /зали, ресторанти, фоайета, рецепция, санитарни възли и други/ и зоните на работните офиси;

Основните видове СМР са както следва:

— Подмяна на съществуваща алуминиева дограма — приблизително 4 890 кв. м;

— Направа на облицовки от гранитогрес и фаянс — приблизително 1 437 кв. м;

— Доставка и монтаж на мокет — приблизително 2 640 кв. м;

— Доставка и монтаж от трислоен паркет — приблизително 275 кв. м;

— Направа на циментова замазка — приблизително 2 200 кв. м;

— Направа на мазилки по стени и тавани — приблизително 3 326 кв. м;

— Доставка и монтаж на влагоустойчив гипсокартон — приблизително 1 800 кв. м;

— Направа на топлоизолация — приблизително 1 800 кв. м;

— Почистване, шлайфане и кристализация на мозайка и мрамор — приблизително 8 143 кв. м;

— Боядисване с висок клас водоустойчив латекс стени и тавани — приблизително 16 326 кв. м;

— Доставка и полагане на кабели на електроинсталации — приблизително 54 238 л.м;

— Доставка и монтаж на различни размери водопроводни полипропиленови тръби — приблизително 692 л.м;

— Доставка и монтаж на различни размери канализациони тръби — приблизително 1 012 л.м.

Design, construction and commissioning of the Automatic Identification System (ID) registration number of the vehicle installed in the official car of Interior Ministry

Главна дирекция Национална полиция - Министерство на вътрешните работи | Published December 27, 2016  -  Deadline February 2, 2017
Design, construction and commissioning of the Automatic Identification System (ID) of the registration numbers of motor vehicles (MV) installed in at least 23 the number of official vehicles of the Ministry of Interior in implementing the project financed by the Bulgarian - Swiss cooperation program on "Combating crimes related to trafficking in motor vehicles" with beneficiary GDNP. All equipment and software must meet the technical characteristics specified in the technical specification and can be regarded as minimum mandatory requirements.

Construction-site supervision services

„Топлофикация София“ ЕАД | Published December 28, 2016  -  Deadline January 27, 2017

The subject of the award of this contract is "Choosing a contractor to perform consulting services in connection with the realization of the investment project with subject:" Modernisation of turbo GT 4 in TPP "Sofia East" with a new anti-pressure turbine. "

Road construction works

Агенция „Пътна инфраструктура“ | Published January 18, 2017  -  Deadline January 26, 2017

Continued from field II.1.1) (...):

- Lot 1 - Lot 16 "Road II-35 Lovech - Troyan - Karnare from km 37 + 393 to km 46 +105, with a total length of 8.712 km, Lovech"

- Lot 2 - Lot 17 "Road III-306 Red Beach - Chomakovtsi from km 9+ 715 to km 19 + 207, with a total length of 9.492 km, Pleven region";

- Lot 3 - Lot 18 "Road III-112 Oak neighborhood - Montana from km 10 +500 to km 227.88 16+, 20+ km of 579 to km 27 + 736.15, from km 29 + 675 to km 36 654.63 km and 37 ++ 825 to km 47 + 806.74, with a total length of 29.846 km, Montana. "

Preparation of complete project documentation of Accession. new User ID., rekonstr., renovation and construction of new power stations, cab. and give. lines MV and LV Terry. of example. Sofia municipality. and Pleven

ЧЕЗ Разпределение България АД | Published January 20, 2017  -  Deadline February 24, 2017
CEZ Distribution Bulgaria AD held an open procedure with subject "Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV within the Department of Sofia and Pleven region", Ref. № RRS 16-110. The subject of the contract is divided into 3 lots, as follows: 1. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Pernik, Kyustendil" 2. Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Vratsa, Lovech" 3. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new substations, cable and vazd.linii MV and LV-region "Vidin-Montana."

Construction works of the building and part of Sgr. systems with the introduction of energy efficiency measures for Dom№2 complex Boyana regarding use of the site for the Presidency of the Republic of Bulgaria to the EU Council in 2018

Министерски съвет | Published January 13, 2017  -  Deadline February 7, 2017
The building is the first category according to art. 137, para. 1 LSP based on Decree № 181 of 20.07.2009 The construction is based on the detailed design made - for "Construction works of the building and part of the building installations with the introduction of energy efficiency measures for Home № 2 complex Bojana regarding use of the site for the Presidency of the Republic of Bulgaria to the European Union Council in 2018 ".

Preparation of fair market valuations for the establishment of permanent right of construction for 8 pcs. steps poles and 9 pcs. easements by a licensed appraiser of property in forest areas of overhead 110kV "Vidbol"

Електроенергиен системен оператор ЕАД | Published December 30, 2016  -  Deadline February 10, 2017
The contract includes the preparation of the fair market valuation to establish a permanent right of construction for 8 pcs. steps poles and 9 pcs. easements by a licensed appraiser of property in forest areas for reconstruction of the overhead line 110kV overhead line "Vidbol" after providing an output from the contracting authority.

Construction activities in the Directorate "Social activities" at the Metropolitan Municipality

Столична община | Published January 20, 2017  -  Deadline February 6, 2017
The opening of tenders is public and may be attended by participants in the procedure or their authorized representatives, and representatives of mass media. Date and time of opening of tenders: Date: (dd / mm / yyyy) 06/02/2017. Time: 13:30 Place of Bid Opening: Sofia Municipality, St. Paris 3, Room 109

Design and construction works - Reconstruction of a bathroom with toilet, yard and gazebo house museum "Nenko Balkan"

Столична община | Published January 4, 2017  -  Deadline January 26, 2017

"Implementation of construction and repair works in substations and adjacent facilities within the" CEZ Distribution Bulgaria ", Sofia region and Sofia region."

ЧЕЗ Разпределение България АД | Published January 20, 2017  -  Deadline February 27, 2017
Contract award is due to the need for maintenance of the equipment belonging to the substations owned by the "CEZ Distribution Bulgaria", as well as building units (rooms, facades, roofs and dr.elementi) representing site energy facilities, related to the distribution of electricity in order to improve the functional status of facilities and hence increase their service life and reliability. Types of work are described in the attached documentation to participate bill of quantities (KSF). The ranking will be completed by criterion "lowest price". The contract term is three (3) years from the date of its signing by both sides or until the maximum value in lev, VAT excluded, depending on which date comes first. Bidders must meet the requirements for the personal situation and selection criteria set by the contracting authority.

"Implementation of building supervision and assessment of investment projects"

Главна дирекция Пожарна безопасност и защита на населението - МВР | Published December 27, 2016  -  Deadline February 1, 2017
The selected contractor shall perform advisory services to art. 166, Paragraph 1 of the Law on Spatial Planning to draw up a comprehensive report assessing the compliance of the project with the essential requirements for construction and construction supervision during construction and control of the quantity, quality and compliance of the performed construction works and used materials including implementation of the obligations of the coordinator of health and safety in accordance with Decree № 2 from 22 March 2004 for minimum health and safety in carrying out construction works and the exercise of investment control of six centers to increase the readiness of the population response flooding. Each center to enhance the readiness of the population to respond to floods consists of training center and Training complex.

"Replacing corroded steel structures in extended joints and two drainage galleries yaz.rayon Vacha"

Национална електрическа компания ЕАД | Published January 5, 2017  -  Deadline February 8, 2017
Replacement of corroded steel structures in extended joints and two drainage galleries

"Selecting a consultant on art. 166, para. 1 pt. 1 of the SPA for "Repair and reconstruction of the building of housing" B "of the Faculty of Physics at Sofia University" St. Kliment Ohridski ''

Софийски университет Св. Климент Охридски | Published January 19, 2017  -  Deadline February 21, 2017
SPECIFIC ACTIVITIES TO CONTRACTOR shall perform 1.Otsenyavane compliance of the investment project in accordance with Art. 142, para. 5 of LSP 2. The construction supervision will be in volume and scope, as an integral part of this technical specification for implementing assessment services saotveststvie the investment project and construction supervision of the building of housing "B" of the Faculty of Physics at Sofia University "St. Kliment Ohridski '' are attached the following documents:? Report energy efficiency audit of the building? Energy performance certificate of a building in operation? Technical passport of the building; ? Architectural survey of the building.

,, SELECTION operators to provide electronic communications services through public electronic mobile network standard GSM / UMTS / LTE FOR THE NEEDS OF THE AGENCY IN FORESTS AND ITS STRUCTURE

Изпълнителна агенция по горите | Published January 9, 2017  -  Deadline February 14, 2017
Vazlganeto of this contract aims to provide digital mobile telephony standard GSM and related specialized services in the use of public mobile electronic networks in Bulgaria and abroad, by providing service "roaming". It is planned to be carried carrier selection for providing electronic communications services through public electronic mobile network standard GSM / UMTS / LTE for the needs of EFA and its structures. Provision of telecommunications services is designed to forecast br.-1700 pcs. Voice SIM cards for mobile telephony and forecast br.-300 pcs. data cards for mobile internet and includes all services standard GSM / UMTS (phone calls, messages through SMS and MMS, data transmission, mobile Internet access, etc.). The specified number of SIM cards and such for mobile. Internet is not permanent and may be increased or reduced in the duration of the contract at the request of the sponsor.

Updating the system management processes in UGS 'UGS'

Булгартрансгаз ЕАД | Published December 16, 2016  -  Deadline January 31, 2017
The subject of the contract is engineering implementation (turnkey) to replace the existing programmable logic controller Honeywell S9100e and existing Experion PKS SCADA system UGS 'UGS' including design, equipment supply, construction and deployment of the DCS control system of technological processes in UGS 'UGS', covering a minimum, the following activities: 1.Prouchvane existing condition and available technical documentation. 2. Develop project - phase "Technical design" and stage "Work Project"; 3.Dostavka the necessary materials, equipment, licenses, software and hardware; 4. Construction and deployment of the DCS system; 5.Dostavka of spare parts and support equipment; 6.Provezhdane training of specialists to the Employer; These activities should be implemented according to the requirements set out in the technical specification and its annexes, part of the documentation for the procedure.