Public tenders for construction in Smolyan Bulgaria

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Южноцентрално държавно предприятие | Published October 21, 2017
Winner
„Обединение ГП“ ДЗЗД
cpvs
45000000, 45100000, 45230000, 45233000, 45233200, 45233300, 45240000, 45262000, 71300000, 71320000

1, b. "B" of the PPL.

Construction of new permanent forest roads and transport technical infrastructure to them;

1, b. "B" of the PPL. Activity description - Implementation of the following axes is foreseen. Activities: Delivery of materials and equipment necessary for use in the construction works (with the exception of these supplies to the Contracting Authority, if any), accompanied by the relevant "Quality Documentation" (certificates of origin, declarations of conformity, technical passports, etc.). Temporary construction and preparatory work. »Organization of the execution of the construction and assembly works. Dismantling and preparatory work. assembly and construction works and building tests. »Construction of construction papers, preparation of executive documentation, executive drawings and cadastral surveys, coordination of acceptance and commissioning activities, etc.

1, b. "B" of the PPL. Description of the activities - The following main activities are envisaged: - Examination of the existing situation, collection of output data, incl. data on construction / reconstruction of existing roads, familiarization with the available technical documentation, shooting of the terrain, elaboration of variant solutions,

- Elaboration and proceeding of the approval of the Detailed Development Plan - Parcel Plan, when necessary and after duly authorized, for the route of the newly designed and reconstructed roads, preparation of the investment project in phases "Technical project" and / or Detailed design and etc.

Construction work

Община Смолян | Published March 11, 2016
cpvs
45000000, 45233200, 45233252, 45233161, 45233142

Construction work

Construction supervision services

Южноцентрално държавно предприятие | Published November 15, 2017  -  Deadline December 18, 2017
cpvs
71520000

Continued from section II.1.1) .... and the secondary legislation for its implementation in the process of construction of new permanent forest roads and transport technical infrastructure, major overhaul of existing forest roads and construction of facilities, incl. construction / overhaul of others. within the meaning of Art. 3, para. 1, item 1, letter "b" of the Public Procurement Act in accordance with the needs of South Central State Enterprise ".

"Implementation of construction supervision and preparation of a report for the assessment of the compliance of an investment project within the meaning of the Spatial Development Act and the secondary legislation for its implementation in the process of construction of new permanent forest roads and transport technical infrastructure and overhaul of existing forest roads and construction of facilities, incl. construction / overhaul of others. within the meaning of Art. 3, para. 1, item 1, letter "b" of the Public Procurement Act in accordance with the needs of South Central State Enterprise ". The construction activities that will be subject to construction supervision under this procedure include:

- construction of new permanent forest roads;

- major overhaul of existing permanent forest roads;

- repairs, reconstruction and construction of facilities.

The project activities that will be subject to the preparation of the Conformity Assessment Report of an investment project under this procedure include:

- Design of new sustainable forest roads;

- design of major repairs and reconstructions of existing permanent forest roads;

- design of major repairs, reconstructions and reconstructions of facilities;

- designing new facilities.

Scope of the contractor's (Consultant) activity under this contract.

The subject of this contract includes the exercise of construction supervision in accordance with Art. 168 of the TDA.

Construction work

Южноцентрално държавно предприятие | Published May 6, 2017  -  Deadline June 8, 2017
cpvs
45000000, 45100000, 45220000, 45230000, 45233000, 45233200, 45233300, 45240000, 45262000, 71000000, 71200000, 71300000, 71320000

1, b. "B" of the PPL.

Continued from item II.2.1):

1, b. "B" of the Public Procurement Act, in accordance with the needs of South Central State Enterprise "DS", including: »construction of new permanent forest roads and transport technical infrastructure to them;

»Overhaul of existing permanent forest roads;

1, b. "B" of the PPA. Description of the activities - The following main activities are foreseen: »Delivery of the materials and equipment necessary for use in the construction works (with the exception of these supplies to the contracting entity, if any) accompanied by the relevant Quality Documentation (certificates of origin, Declarations of conformity, technical passports, etc.).

»Temporary construction and preparatory work.

»Organization of the execution of the construction and assembly works.

»Dismantling and preparatory work.

»Construction and assembly works and tests.

»Compilation of construction papers, preparation of executive documentation, executive drawings and cadastral surveying, coordination of acceptance and commissioning of the construction.

»Removal of defects appearing within the warranty period.

»Organization and implementation of other accompanying activities not mentioned above but essential for the approval of investment projects, construction permit, implementation of construction works and commissioning of the construction works, after duly empowered where the due fees for coordination and approval are for Account of the contracting entity.

1, b. "B" of the PPL in accordance with the needs of the South Central State Enterprise (SUS); Including: »design and author supervision of the construction of new permanent forest roads and transport technical infrastructure to them;

»Design and author supervision of overhaul of existing permanent forest roads;

1, b. "B" of the PPL.

Description of the activities - The following main activities are envisaged: - Examination of the existing situation, collection of output data, incl. Data on construction / reconstruction of existing roads, familiarization with the available technical documentation, shooting of the terrain, elaboration of variant solutions,

- Elaboration and proceeding of the approval of the Detailed Development Plan (PPP), when necessary and after due authorization, for the route of the newly designed and reconstructed roads, preparation of the investment project in phases "Technical project" and / or "Detailed design "Depending on the specificity of the site, where the due fees and the costs of coordination and approval are at the expense of the contracting authority.

166 of the Territory Act.

- Coordination of the project with all authorities and persons whose authorization, assistance or opinion is necessary for the fulfillment of the subject of the public procurement and for obtaining a construction permit (RS) (where necessary) - is carried out by the contractor after duly authorized by the The contracting authority, in which the fees due for coordination and approval of the investment project, including the issue of a building permit, shall be borne by the contracting authority.

Construction work

Община Смолян | Published July 25, 2015  -  Deadline August 31, 2015
cpvs
45000000, 45233200, 45233252, 45233161, 45233142

The object of this contract is "Construction" within the meaning of Art. 3, para. 1 pt. 3 of the PPA with the name: "Repair of streets and roads in the municipality of Smolyan." The main types of work for the contract are the repair of existing asphalt pavement including: milling, blowing and washing the asphalt, repair and installation of curbs, repair and construction of sidewalks, lifting rsh and DS detonation, making new street drainage grates, repairs all associated facilities at the streets, laying asphalt pavement with dense asphaltic concrete patching and filling cracks single, clean the area.

Pipelaying construction work

Община Смолян | Published January 21, 2015  -  Deadline February 26, 2015
cpvs
45231110, 45232150, 45232410, 45232130

Object of this contract is "construction" within the meaning of Art. 3, para. 1 pt. 3 of the PPA with the name: "Construction and improvement of sewerage and water infrastructure in settlements in the Municipality of Smolyan." Performance of the contract is divided into two (2) lots (OP) as follows: - Lot № 1 - Execution of construction works on site: water supply network with. Mogilitsa. - Lot № 2 - Implementation of the construction works of the object: Water, sanitary and storm sewers in St. PRSlaveikov of HCP 2061-20 m to HCP 43 + 10 m and approaches to HCP 2418 + 19 m and HCP 2350, in the town. Smolyan.

Pipelaying construction work

Община Смолян | Published October 3, 2015
Winner
„Красин“ ООД, ЕИК: 120548749
cpvs
45231110, 45232150, 45232410, 45232130

"Building and improving sewerage and water infrastructure in settlements in the municipality of Smolyan." Performance of the contract is divided into two (2) lots (OP) as follows: - Lot № 1 - Execution of construction works on site: water supply network with. Mogilitsa. - Lot № 2 - Implementation of the construction works of the project: Water, sanitary and storm sewers along the streets. "P. Slaveykov "of the island. t. 2061-20 M to O. t. + 43 10 m and o approaches. t. 2418 + 19 m and o. t. 2350, in the town. Smolyan.

Construction supervision in carrying out construction and repair works on the National Programme for Energy Efficiency of Residential Buildings in the municipality of Smolyan Municipality.

Община Смолян | Published February 6, 2016
cpvs
71521000

Construction supervision in carrying out construction and repair works on the National Programme for Energy Efficiency of Residential Buildings in the municipality of Smolyan Municipality.

Construction work

„Южноцентрално държавно предприятие“, ТП „Държавно горско стопанство Смолян“ | Published August 1, 2015
Winner
„Крис — МТ“ ООД, ЕИК 120069414
cpvs
45000000, 45233140, 45233141, 45233142, 45233000

Maintenance, repair of existing forest roads, and construction of temporary forest roads providing access to the sites listed for use in 2015 on the territory of TP "DGS Smolyan."

Exercise of construction supervision during construction works in Smolyan, related to repair and rehabilitation of streets and overpasses for improvement of the environment and renovation of energy efficiency.in the educational infrastructure

Кмет на община Смолян | Published June 13, 2017  -  Deadline July 12, 2017
cpvs
71520000

The contractor under each separate lot exercises construction supervision within the meaning of Art.166, para 1 of the TDA for each construction under the separate item in accordance with the approved investment project, the technical specifications, the technical offer, the construction contract and the other requirements under the contract for Implementation and commissioning through qualified specialists designated for supervision of the respective design parts, including: exercising construction supervision in the mandatory scope under Art. 168, para. 1 of the TDA, compiling and signing Acts and protocols during construction, exercises the functions of health and safety coordinator, performs inspection and control of delivered and used building products, controls the quality of the construction works, prepares a final report, draws up a technical passport, performs the necessary actions for commissioning . The scope of implementation is detailed in the draft contract and annexes thereto.

Construction work

Южноцентрално държавно предприятие, ТП „Държавно горско стопанство Смолян“ | Published August 26, 2016
Winner
„Тераком-Смолян“ ООД, ЕИК: 201330169
cpvs

Maintenance, repair of existing forest roads and construction of temporary forest roads providing access to the sites included for use in 2016 and 2017 on the territory of TP "DGS Smolyan."

Construction work

„Южноцентрално държавно предприятие“, ТП Държавно горско стопанство „Смолян“ | Published April 19, 2016  -  Deadline May 26, 2016
cpvs
45000000, 45233140, 45233141, 45233142, 45233000

"Maintenance, repair of existing forest roads and construction of temporary forest roads providing access to the sites included for use in 2015 on the territory of TP DGS" Smolyan "."

Construction work

Община Смолян | Published March 4, 2017
Winner
„Адванс Строй“ ЕООД, ЕИК — 202584812
cpvs
45000000, 71315000, 71310000, 71221000, 45320000, 45421000, 45261400, 45300000

Performance of the contract is divided into 25 lots, the activities covered by the contract, in any one lot include: - Development of technical / detailed design for the needs of renovation, according to SPA, Decree № 4 of 2001 on the scope and contents of investment projects and related secondary legislation in the relevant parts in relation to the eligible and selected for funding activities. The project should be accompanied by detailed quantity-value accounts in applicable parts. - Execution of works for upgrading energy efficiency in accordance with Part Three construction of the SPA after the issuance of a building permit by the competent authorities of any particular object. The builder performs works for upgrading the energy efficiency of each object / group of objects in accordance with the construction papers, terms of the contract and the requirements of Art. 163 and Art. 163a of the SPA. - Supervision of designers carried out during the execution of construction works / CMP /. Eligible activities for funding under the multi-family residential buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage that occurred during the operation, which are prescribed as mandatory for building in the investigation to establish the technical characteristics of the building; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.); Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of the implemented measures with energy saving effect.

Construction work

Община Смолян | Published December 8, 2016
Winner
„Пи Ес Пи“ ЕООД, ЕИК — 175245413
cpvs
45000000, 71315000, 71310000, 71221000, 45320000, 45421000, 45261400, 45300000

Performance of the contract is divided into 25 lots, the activities covered by the contract, in any one lot include:

- Development of technical / detailed design for the needs of renovation, according to SPA, Decree № 4 of 2001 on the scope and content of investment projects and related secondary legislation in the relevant parts in relation to the eligible and selected for funding activities. The project should be accompanied by detailed quantity-value accounts in applicable parts.

- Execution of works for upgrading energy efficiency in accordance with Part Three construction of the SPA after the issuance of a building permit by the competent authorities of any particular object. The builder performs works for upgrading the energy efficiency of each object / group of objects in accordance with the construction papers, terms of the contract and the requirements of Art. 163 and Art. 163a of the SPA.

- Supervision of designers carried out during the execution of construction works / CMP /. Eligible activities for funding under the multi-family residential buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage that occurred during the operation, which are prescribed as mandatory for building in the investigation to establish the technical characteristics of the building; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.); Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of the implemented measures with energy saving effect.

Architectural, construction, engineering and inspection services

Община Смолян | Published April 16, 2016  -  Deadline May 26, 2016
cpvs
71000000

19 is signed only with the express act signed obr.12; 4. To inform the Principal on the progress of construction and the fulfillment of its actions and omissions of the measures taken and the need for appropriate arrangements by Employer by reporting; 5. As a representative of the Contracting Authority to request and use all necessary documents and papers to check the quality of construction materials used to monitor and control the correctness of the technological building operation and the quality of completed construction works. Upon detection of errors, distortions and obvious defects of the company - contractor CMP, shall notify the Contracting Authority in writing in the form of a report; 6. To notify the Employer of all recognized changes in agreed quantities and emerging CMP, which are not subject to the agreed quantities, signed by the contractor of the site; 7. To ensure strict compliance with deadlines for completion of works.

Advanced and detailed description of the activities covered by the contract for each apartment building, included in the lot is available within the Terms of Reference - Book V, an integral part of the documentation for participation.

Construction work

„Южноцентрално държавно предприятие — Смолян“ | Published January 8, 2016  -  Deadline January 28, 2016
cpvs
45000000, 45220000, 45230000, 45233000, 45233200, 45233300, 71320000

Construction work

Construction work

„Южноцентрално държавно предприятие — Смолян“ | Published February 19, 2016
cpvs
45000000, 45220000, 45230000, 45233000, 45233200, 45233300, 71320000

Construction work

Architectural, construction, engineering and inspection services

Община Смолян | Published November 24, 2016
Winner
„ДИ — 2М“ ЕООД, ЕИК — 120606558
cpvs
71000000

19 is signed only with the express act signed obr.12;

4. To inform the Principal on the progress of construction and the fulfillment of its actions and omissions of the measures taken and the need for appropriate arrangements by Employer by reporting;

5. As a representative of the Contracting Authority to request and use all necessary documents and papers to check the quality of construction materials used to monitor and control the correctness of the technological building operation and the quality of completed construction works. Upon detection of errors, distortions and obvious defects of the company - contractor CMP, shall notify the Contracting Authority in writing in the form of a report;

6. To notify the Employer of all recognized changes in agreed quantities and emerging CMP, which are not subject to the agreed quantities, signed by the contractor of the site;

7. To ensure strict compliance with deadlines for completion of works. Advanced and detailed description of the activities covered by the contract for each apartment building, included in the lot is available within the Terms of Reference - Book V, an integral part of the documentation for participation.

"CONSTRUCTION OF ROAD III - 863 - SOKOLOVTSI - PUPPIES - MUNICIPALITIES - VILLAGE OF VIVA VILLAGE, TERZIJA PLACE".

Кмет на община Смолян | Published October 13, 2017  -  Deadline November 14, 2017
cpvs
45233000

Object of the contract: "CONSTRUCTION OF ROAD III - 863 - SOCKETS - PUPPIES - BANKS - VILLAGE VILLAGE, TERZIJA PLACE". The subject of the contract includes construction works related to the construction of new asphalt pavement and supporting walls - excavation works, asphalt, formwork, concrete works, backfilling and others. The order covers the execution of five retaining walls, the laying of asphalt pavement from point K32 to point 43, the laying of curbs and pavements.

"Design, Authorized Surveillance and Construction in accordance with the needs of South-Central - continued in II.1.4.

Южноцентрално държавно предприятие | Published May 9, 2017  -  Deadline June 12, 2017
cpvs
45000000

Continued from section II.1.1. State enterprise, including: 1. design, author supervision and construction of new permanent forest roads and transport technical infrastructure to them; 2. designing, authorizing supervision and overhaul of existing permanent forest roads; and 3. designing, authoring supervision and construction of technical and fortification facilities incl. Construction / overhaul of others within the meaning of Art. 3, para. 1, item 1, b. "B" of the PPL.