Construction of a new 400 kV power line in Bulgaria

 | Published January 20, 2017  -  Deadline January 20, 2018

This General Procurement Notice is an update of the General Procurement Notice published on EBRD web site on 13 October 2014, as updated on 15 October 2015 and on 20 January 2016.

Elektoenergien Sistemen Operator EAD (the "Employer") intends using the proceeds of the grant funds provided by the Kozloduy International Decommissioning Support Fund ("KIDSF"), administered by the European Bank for Reconstruction and Development (the "Bank"), and its own financial sources toward the cost of the Project for: "Construction of a new 400 kV power line from TPP Maritsa Iztok 2 (substation Maritsa Iztok) to substation Plovdiv" ("the Project").

The Project includes procurement of following contracts:

  1. Consultancy services for construction supervision (estimated contract value up to  60,000 EUR);
  2. Construction of a new 400 kV power line from substation Plovdiv to substation Maritsa Iztok (estimated contract value up to 21,600,000 EUR).

70 % will be financed by KIDSF and 30 % by ESO EAD. Consultancy services will be 100 % financed by KIDSF.

Procurement is expected to begin in the second quarter of 2017. The contract implementation period for the construction supervisor will be 24 calendar months, and for the construction - 20 calendar months.

Contracts to be financed with the proceeds of KIDSF Grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the KIDSF Grant will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.

Interested parties should contact:

 

Mr. July Lambriev
Elektroenergien Sistemen Operator EAD
Address: 201, Tsar Boris III Blvd.
1618 Sofia, Bulgaria
E-mail:    j.lambriev@eso.bg
Fax:        + 359 2 96 26 129

Construction of three gas transmission pipelines in Bulgaria

 | Published January 29, 2016  -  Deadline January 30, 2017

This General Procurement Notice is an update of the General Procurement Notice (No. 8018-GPN-17149) published on EBRD web site on 2 October 2015.

Bulgartransgaz EAD intends to use grant proceeds provided by the Kozloduy International Decommissioning Support Fund ("KIDSF"), administrated by the European Bank for Reconstruction and Development (EBRD, "the Bank") and its own funds, to construct gas pipelines with a total length of 122 km to connect the municipalities of Svishtov, Pirdop, Panagiurishte, Bansko and Razlog to the national gas transmission network (the Project).

 

The Project will require procurement of goods, works and services as follows:

1. Gas transmission pipeline to Svishtov
Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, automated gas regulation station (AGRS) to the town of Svishtov and auxiliary facilities.

2. Gas transmission pipeline to Panagiurishte and Pirdop
Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, AGRS to the town of Panagiurishte, AGRS to the town of Pirdop and auxiliary facilities.

3. Gas transmission pipeline to Bansko and Razlog
Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, AGRS to the town of Razlog, AGRS to the town of Bansko and auxiliary facilities.

The total budget for the Project is 21.8 million EUR, 50% will be funded by KIDSF and 50% by Bulgartransgaz EAD.

Procurement is expected to begin in the second half of 2016.

Contracts to be financed with the proceeds of KIDSF Grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the KIDSF Grant will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.
 

Project implementation is expected to take about 50 calendar months.

Interested parties may contact:

 

Name:              Nikolay Patev
Job position:  Projects Management Dept.
Address:         Bulgartransgaz EAD
                        Lulin 2 District
                        66 P. Vladigerov Blvd.
                        1336 Sofia, Bulgaria

Phone:+359 2 9396372
Fax: +359 2 9250063
E-mail: Nikolay.Patev@bulgartransgaz.bg

 

 

Construction of a Small Hydro Power Plant on the Iliina River

 | Published March 30, 2016  -  Deadline March 30, 2017

The Rila Holy Cloister in Bulgaria (the "Employer") intends to use the proceeds of the grant funds provided by the Kozloduy International Decommissioning Support Fund (the "KIDSF"), administered by the European Bank for Reconstruction and Development ("EBRD" or the "Bank") under Grant Agreement No. 033 towards the cost of the Project for Construction of a Small Hydro Power Plant on the Iliina River for the Secure and Reliable Energy Supply and for the Energy Efficiency Improvements of the Rila Holy Cloister and the Rila area. This will require the procurement of the following goods, works or services:

Design, supply, installation and commissioning of a small hydro power plant on the Iliina River

The estimated budget is EUR 2.5 million.

Procurement is expected to be launched in the third quarter of 2016.

The contract to be financed with the proceeds of KIDSF Grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the Grant shall not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law or official regulation of the purchaser's country.

Interested parties should contact:

Mr. Rosen Mihaylov

Address: Rila Holy Cloister – Rila monastery

Fax: +359 7054 3383

e-mail: ramihajloff@gmail.com

 

Working days: 9:00 to 16:00.

Construction work

Община Горна Оряховица | Published January 18, 2017  -  Deadline February 17, 2017

The contract includes the preparation of detailed design, supervision, provision of all necessary permits documents from the relevant authorities, construction works (construction works). Performance ends with authorization for use.

The contract includes the preparation of detailed design, supervision, provision of all necessary permits documents from the relevant authorities, construction works (construction works). Performance ends with authorization for use.

Construction supervision services

Община Нови пазар | Published January 21, 2017  -  Deadline March 8, 2017
6 of LSP is carried out by entities description - Continues in Section II.2), point II.2.4. 

The subject of the contract includes implementation of the following activities:

145 of the SPA by the chief architect of the municipality issuing a building permit.

1.2.Uprazhnyavaneto construction supervision during construction works. Construction supervision shall be exercised in accordance with the Law on Spatial Planning and the applicable regulations. The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works. Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction. Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding.

Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority. Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects. Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction work

Община Поморие | Published December 17, 2016  -  Deadline January 24, 2017

Brief description of the activities within the scope of the contract:

1. The investment project should be in phase "Working" objects from the fourth category constructions ( "Ivan Vazov" in the town. Pomorie) and fifth category constructions (Gymnasium to "Ivan Vazov" in the town. Pomorie).

2. Implementation of works: Execution of construction works carried out in accordance with Part Three "construction" of the SPA and starts after the entry into force of the construction permit and after signing the protocol opening the construction site and determining the construction line and level of construction .

3. Supervision: The object of the contract includes the obligation of the designer to perform his duties as a designer carrying out supervision during construction and commissioning of the building.

A detailed description of the activities contained in the technical specification of the order.

Brief description of the activities within the scope of the contract:

1. The investment project should be in phase "Working" objects from the fourth category constructions ( "Ivan Vazov" in the town. Pomorie) and fifth category constructions (Gymnasium to "Ivan Vazov" in the town. Pomorie).

2. Implementation of works: Execution of construction works carried out in accordance with Part Three "construction" of the SPA and starts after the entry into force of the construction permit and after signing the protocol opening the construction site and determining the construction line and level of construction .

3. Supervision: The object of the contract includes the obligation of the designer to perform his duties as a designer carrying out supervision during construction and commissioning of the building.

A detailed description of the activities contained in the technical specification of the order.

Construction work

Южноцентрално държавно предприятие, ТП „Държавно горско стопанство Златоград“ | Published December 28, 2016  -  Deadline January 27, 2017

Terms construction repairs needed for maintenance, repair of existing forest roads and construction of temporary forest roads providing access to the sites included for use during 2016-2017 on the territory of TP "DGS Zlatograd" specified by type and performance in the technical specification - Annex № 12, an integral part of this documentation.

Construction work

Община Поморие | Published January 14, 2017  -  Deadline February 21, 2017

Brief description of the activities within the scope of the contract:

1. The investment project should be in phase "Working" objects from the fourth category constructions ( "Ivan Vazov" in the town. Pomorie) and fifth category constructions (Gymnasium to "Ivan Vazov" in the town. Pomorie).

2. Implementation of works: Execution of construction works carried out in accordance with Part Three "construction" of the SPA and starts after the entry into force of the construction permit and after signing the protocol opening the construction site and determining the construction line and level of construction .

3.Avtorski supervision: The object of the contract includes the obligation of the designer to perform his duties as a designer carrying out supervision during construction and commissioning of the building.

A detailed description of the activities contained in the technical specification of the order.

Brief description of the activities within the scope of the contract:

1. The investment project should be in phase "Working" objects from the fourth category constructions ( "Ivan Vazov" in the town. Pomorie) and fifth category constructions (Gymnasium to "Ivan Vazov" in the town. Pomorie).

2. Implementation of works: Execution of construction works carried out in accordance with Part Three "construction" of the SPA and starts after the entry into force of the authorization zastroezh after signing the protocol opening the construction site and determining the construction line and level of the building.

3. Supervision: The object of the contract includes the obligation of the designer to perform his duties as a designer carrying out supervision during construction and commissioning of the building.

A detailed description of the activities contained in the technical specification of the order.

Construction work

Община Пещера | Published January 17, 2017  -  Deadline February 24, 2017

Subject of the contract covers the implementation of the "Construction works to increase the energy efficiency of buildings in the city. Cave 4 lots", namely:

1.1 Lot № 1 - "Construction works on" Increasing the energy efficiency of municipal public building: Ritual Hall,. Cave '';

1.2 Lot № 2 - "Construction works on" Increasing the energy efficiency of residential buildings in the city. Cave - LOT 2 '';

1.3 Lot № 3 - "Construction works on" Increasing the energy efficiency of residential buildings in the city. Cave - LOT 3 '';

1.4 Lot № 4 - "Construction works on" Increasing the energy efficiency of residential buildings in the city. Cave - LOT 5 "."

Construction supervision services

Община Нови пазар | Published January 14, 2017  -  Deadline February 15, 2017
11 of the TDA and construction supervision during construction works. 

11 of the TDA.

The investment projects are subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment projects which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

1 of the law.

145 of the SPA by the chief architect of the municipality issuing a building permit.

Construction supervision during construction works - construction supervision shall be exercised in accordance with the Law on Spatial Planning and the applicable regulations. The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works.

Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction.

Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding.

Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority. Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects. Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction supervision services

Община Нови пазар | Published January 21, 2017  -  Deadline March 7, 2017
11 of the TDA. 

The investment projects are subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment projects which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

2.4.

11 of the TDA.

The investment projects are subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment projects which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

1 of the law.

145 of the SPA by the chief architect of the municipality issuing a building permit.

1.2. Construction supervision during construction works

Construction supervision shall be exercised in accordance with the Law on Spatial Planning and the applicable regulations.

The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works.

Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction.

Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding.

Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority.

Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects.

Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction supervision services

Община Нови пазар | Published December 28, 2016  -  Deadline January 27, 2017

The subject of this contract is "Implementation of activities on the preparation of a report assessing the compliance of the investment project and the exercise of independent supervision project: BG16RFOP001-2.001-0048" Improving the energy efficiency of public and government buildings in the town. New market ".

The scope of this contract includes the following activities: The scope of this contract includes the following activities:

6 of the TDA.

The investment projects are subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment projects which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

5 of TDA.

145 of the SPA by the chief architect of the municipality issuing a building permit.

Construction supervision during construction works - construction supervision shall be exercised in accordance with the Law on Spatial Planning and the applicable regulations.

The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works.

Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction.

Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding.

Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority.

Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects.

Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction work

Община Ботевград | Published January 6, 2017  -  Deadline February 13, 2017

This contract includes the execution of engineering (design, construction and supervision) the introduction of measures for energy efficiency of multifamily buildings - bl. "Hristo Botev" and bl. "Zdravets" in the town of Botevgrad. The activities to be carried out on the 2 buildings are: preparation of detailed design according to SPA, Decree № 4 OF 21/05/2001 on the scope and content of investment projects and other normative acts of law enforcement on Construction under part 3 "construction" of the SPA after the issuance of a building permit for the planned works in the technical specifications and the exercise of supervision in accordance with Art. 162 TDA. The main activities detailed design should provide and works, to be carried out on buildings are detailed in technical specifications and documentation for the contract because of a shortage of characters in this field.

Construction work

Община Габрово | Published January 21, 2017  -  Deadline March 9, 2017

Implementation of engineering - design, with supervision and construction - in connection with the repair, modernization, implementation of energy saving measures and building an accessible environment in the building of primary school "Sv. St. Cyril and Methodius "and the cultivation of yards.

The scope of design to this contract provides design and development of design solution for creative tailored to the needs and age of the users furnishing of classrooms and facilities in the school.

Execution of construction works for the introduction of measures in the field of energy efficiency; public works - rehabilitation of yard space.

Making supervision of construction activities.

Engineering - design and execution of works for modernization, implementation of energy saving measures and building an accessible environment in the building of "St.. St. Cyril and Methodius ", incl. development of yards and carrying out supervision within the project "Investments in modern educational infrastructure in Gabrovo Municipality" financed by OPRD.

Construction work

Община Разлог | Published January 21, 2017  -  Deadline March 1, 2017

Performance of the contract includes the following activities:

1. Preparation of an investment project in the detailed design phase, according to the technical specifications documentation for procurement and in accordance with Decree № 4 for the scope and contents of investment projects;

2. Performance of Construction works / CMP / by realizing the construction of the site in accordance with Part Three "construction" of the SPA and technical specification documentation for the procurement;

3. Exercise of supervision during the building operations.

Brief description of the activities within the scope of the contract:

1. Development of an investment project;

2. Implementation of works;

3. Supervision.

A detailed description of the activities covered by the order is contained in the Technical Specification.

Construction work

Община Свиленград | Published January 7, 2017  -  Deadline February 17, 2017

"Implementation of engineering (design, construction, supervision) Object Library, c. Svilengrad" Project BG16RFOP001-2.001-0055-S01 "Energy efficiency in building cultural infrastructure, library, city. Svilengrad under the" Regions for Growth "2014-2020,"

Construction work

Община Ботевград | Published January 6, 2017  -  Deadline February 14, 2017

This contract includes the execution of engineering (design, construction and supervision) for the introduction of energy efficiency measures in buildings of municipal and state infrastructure in the town of Botevgrad. The activities to be carried out in respect of 6 buildings (2 of them are in omega UPI) are: preparation of detailed design according to SPA, Ordinance № 4 of 21.05.2001 on the scope and content of investment projects and other secondary legislation of the law, the execution of works under part 3 "construction" of the SPA after the issuance of a building permit for the planned works in the technical specifications and the exercise of supervision in accordance with Art. 162 TDA. The main activities detailed design should provide and works, to be carried out on buildings are detailed in technical specifications and documentation for the contract because of a shortage of characters in this field.

Construction work

Община Сандански | Published January 11, 2017  -  Deadline February 13, 2017

Implementation of Engineering - design, supervision and execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Sandanski in 7 lots.

Preparation of an investment project in phase detailed design.

Execution of construction works on the implementation of energy efficiency measures:

- Placing the insulation of roofs and walls;

- Placing the waterproofing;

- Replacement of existing windows;

- Replacement or installation of heating, water and sewerage and electrical wiring.

Exercise of supervision during construction works.

Construction work

Община Свиленград | Published January 21, 2017  -  Deadline March 7, 2017

"Construction work for the implementation of energy efficiency measures on the subject:" Kindergarten Clover "in the city. Svilengrad in the project" Energy efficiency in buildings in educational infrastructure "BG16RFOP001-2.001-0054-C01", financed under Priority Axis 2 OP "Regions for growth" 2014-2020. "

Area of ​​the building: 1 815.83 m 2 .

"Construction work for the implementation of energy efficiency measures on the subject:" Kindergarten Clover "in the city. Svilengrad in the project" Energy efficiency in buildings in educational infrastructure "BG16RFOP001-2.001-0054-C01", financed under Priority Axis 2 OP "Regions for growth" 2014-2020. " The project envisages construction works in the implementation of measures for energy efficiency building -TSDG "Clover" with area 1 815.83 m 2 . The project is set and providing accessible environment for people with disabilities, fire safety measures. The main measures foreseen include: Delivery and installation of 928.05 meters paroizolatsiya- 2 ; applying two layers of insulation, the second will have posipka- 1 075.33 m 2 ; making facade scratched plaster -1 584.66 m 2 ; making silicone coating on tsokal- 110.73 m 2 ; replacement of old windows - doors and windows with energy-saving 5-chamber PVC -425.64 m 2 ; construction of a new boiler plant with a boiler with a combined burner construction of a new water system for domestic use. It is envisaged that the supply and installation of highly selective solar collectors. The project also provides for the replacement of existing lighting installation, building fire alarm system, construction of lightning protection installation and other activities and amounts of works detailed in the technical specification, investment project and KS, part of the documentation on the contract.

Area of ​​the building is 1 815.83 m 2 .

Construction work

Община Бургас | Published January 20, 2017  -  Deadline February 28, 2017

The subject of the contract provides for a technical design, execution of construction works (SMR) and exercising supervision / engineering / of the following sites:

9 plan jk "Brothers Miladinov" city. Bourgas.

9 plan jk "Miladinovi brothers".

9 plan jk "Brothers Miladinov" city. Bourgas. "

162 TDA. The main work that the technical design should provide and which will be implemented are:

1. The reconstruction of uchebno- production base PGMEE - Burgas aimed at bringing it into compliance with modern vocational and technical training to students.

2. Construction of new service and auxiliary premises to educational production base, as existing not meet the requirements for use as sizes, heights, functional connections.

3. Bring all premises in accordance with the norms for fire requirements.

4. Clearance by partial demolition of territory for sports.

9 plan jk "Miladinovi brothers".

162 TDA. The main work that the technical design should provide and which will be implemented are:

1. Improvement of the area around the school / green areas to the boulevard. "Stefan Stambolov" and the area from the Boulevard. "Democracy" / including construction of park playground before school workshops and reconstruction of the school yard to the boulevard. "St. Stambolov "- use of wooden gazebo and pergola; benches, beds and materials and equipment for classes teaching practices; ornamental plants; grassing and construction of hedges and shrubs; installation of flooring made of different materials; supply and installation of solar garden lights; construction of partial irrigation system / drip irrigation and hydrant /.

2. Replacement of the existing pavement and equipment of the sports field, located in the courtyard of the school and the formation of two basketball, volleyball 1 and 1 combined football / handball court. Its development activities include drainage and replacement of existing buildings from the courtyard and underground communications throughout the playground - storm sewers, drainage and others.

3. Repair and replacement of openwork / metal / part of existing fences Boulevard. "Stefan Stambolov" Boulevard. "Democracy". The lower massive part of fence is made of stone and is in good condition, it is envisaged to continue.

4. Construction of a drainage system for conducting the infiltration of surface water from the adjacent space and their incorporation into urban sanitation; construction of storm sewers; displacement of existing water metering unit water meter chamber in the statutory distance from the regulation of the plot.