EBRD - Construction of three gas transmission pipelines in Bulgaria

Bulgartransgaz EAD | Published February 7, 2017
cpvs
45231220, 44161100, 71310000

EBRD - Construction of three gas transmission pipelines in Bulgaria

EBRD - Construction of a new 400 kV power line in Bulgaria

Elektroenergien Sistemen Operator EAD | Published January 27, 2017
cpvs
45231400, 71310000

EBRD - Construction of a new 400 kV power line in Bulgaria

Construction of a new 400 kV power line in Bulgaria

 | Published January 20, 2017  -  Deadline January 20, 2018
cpvs

This General Procurement Notice is an update of the General Procurement Notice published on EBRD web site on 13 October 2014, as updated on 15 October 2015 and on 20 January 2016.

Elektoenergien Sistemen Operator EAD (the "Employer") intends using the proceeds of the grant funds provided by the Kozloduy International Decommissioning Support Fund ("KIDSF"), administered by the European Bank for Reconstruction and Development (the "Bank"), and its own financial sources toward the cost of the Project for: "Construction of a new 400 kV power line from TPP Maritsa Iztok 2 (substation Maritsa Iztok) to substation Plovdiv" ("the Project").

The Project includes procurement of following contracts:

  1. Consultancy services for construction supervision (estimated contract value up to  60,000 EUR);
  2. Construction of a new 400 kV power line from substation Plovdiv to substation Maritsa Iztok (estimated contract value up to 21,600,000 EUR).

70 % will be financed by KIDSF and 30 % by ESO EAD. Consultancy services will be 100 % financed by KIDSF.

Procurement is expected to begin in the second quarter of 2017. The contract implementation period for the construction supervisor will be 24 calendar months, and for the construction - 20 calendar months.

Contracts to be financed with the proceeds of KIDSF Grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the KIDSF Grant will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.

Interested parties should contact:

 

Mr. July Lambriev
Elektroenergien Sistemen Operator EAD
Address: 201, Tsar Boris III Blvd.
1618 Sofia, Bulgaria
E-mail:    j.lambriev@eso.bg
Fax:        + 359 2 96 26 129

Construction of three gas transmission pipelines in Bulgaria

 | Published January 31, 2017  -  Deadline January 30, 2018
cpvs

This General Procurement Notice is an update of the General Procurement Notice (No. 8161-GPN-17149) published on EBRD web site on 29 January 2016.

Bulgartransgaz EAD (the "Employer") intends to use Grant proceeds provided by the Kozloduy International Decommissioning Support Fund ("KIDSF"), administrated by the European Bank for Reconstruction and Development (EBRD, "the Bank") under Grant Agreement No 057 and its own funds, to construct gas pipelines with a total length of 122 km to connect the municipalities of Svishtov, Pirdop, Panagiurishte, Bansko and Razlog to the national gas transmission network (the Project).

The Project will require procurement of goods, works and services as follows:

1. Gas transmission pipeline to Svishtov

Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, automated gas regulation station (AGRS) to the town of Svishtov and auxiliary facilities.

2. Gas transmission pipeline to Panagiurishte and Pirdop

Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, AGRS to the town of Panagiurishte, AGRS to the town of Pirdop and auxiliary facilities.

3. Gas transmission pipeline to Bansko and Razlog

Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, AGRS to the town of Razlog, AGRS to the town of Bansko and auxiliary facilities.

4. Consulting services for design and of a Project Management Unit Consultant were already procured within the scope of the Grant Agreement.

The total budget for the Project is 21,8 million EUR, 50% will be funded by KIDSF and 50% by Bulgartransgaz EAD.

Procurement will commence in the last quarter of 2017.

Contracts implementation is expected to take between 12 and 30 calendar months, followed by a Defects Notification Period.

Contracts to be financed with the proceeds of the KIDSF will be subject to the Bank’s Procurement Policies and Rules and will be open to firms from any country.

The proceeds of the Grant shall not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law or official regulation of the Employer's country.

 

Interested parties may contact:

Name:              Svetlana Koycheva
Job position:    Projects Management Dept.
Address:          Bulgartransgaz EAD
Lulin 2 District66 P. Vladigerov Blvd. 336 Sofia, Bulgaria
Phone:             +359 2 9396372
Fax:                 +359 2 9250063
E-mail: Svetlana.Koycheva@bulgartansgaz.bg

 

Construction of a Small Hydro Power Plant on the Iliina River

 | Published March 30, 2016  -  Deadline March 30, 2017
cpvs

The Rila Holy Cloister in Bulgaria (the "Employer") intends to use the proceeds of the grant funds provided by the Kozloduy International Decommissioning Support Fund (the "KIDSF"), administered by the European Bank for Reconstruction and Development ("EBRD" or the "Bank") under Grant Agreement No. 033 towards the cost of the Project for Construction of a Small Hydro Power Plant on the Iliina River for the Secure and Reliable Energy Supply and for the Energy Efficiency Improvements of the Rila Holy Cloister and the Rila area. This will require the procurement of the following goods, works or services:

Design, supply, installation and commissioning of a small hydro power plant on the Iliina River

The estimated budget is EUR 2.5 million.

Procurement is expected to be launched in the third quarter of 2016.

The contract to be financed with the proceeds of KIDSF Grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the Grant shall not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law or official regulation of the purchaser's country.

Interested parties should contact:

Mr. Rosen Mihaylov

Address: Rila Holy Cloister – Rila monastery

Fax: +359 7054 3383

e-mail: ramihajloff@gmail.com

 

Working days: 9:00 to 16:00.

Construction supervision services

Община Нови пазар | Published January 21, 2017  -  Deadline March 8, 2017
cpvs
71520000

6 of LSP is carried out by entities description - Continues in Section II.2), point II.2.4. 

The subject of the contract includes implementation of the following activities:

145 of the SPA by the chief architect of the municipality issuing a building permit.

1.2.Uprazhnyavaneto construction supervision during construction works. Construction supervision shall be exercised in accordance with the Law on Spatial Planning and the applicable regulations. The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works. Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction. Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding.

Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority. Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects. Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction supervision services

Община Нови пазар | Published January 27, 2017  -  Deadline March 22, 2017
cpvs
71520000

6 of LSP is carried out by entities description continues in Section II.2 point II.2.4. 

1 of the law.

145 of the SPA by the chief architect of the municipality issuing a building permit.

1.2. Construction supervision during construction works - Supervision is exercised saglosno requirements of the Law on Spatial Planning and the applicable regulations. The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31 July 2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works.

Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction. Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding. Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority. Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects. Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction work

Софийски университет „Св. Климент Охридски“ | Published January 27, 2017  -  Deadline March 7, 2017
cpvs
45000000, 45200000

This contract includes the execution of engineering (design, construction and supervision) for "Repair and reconstruction of the building of housing" B "on campus" Lozenets "Sofia University" St. Kliment Ohridski '. " The activities to be performed are:

1. Preparation of detailed design according to SPA, Decree № 4 OF 21/05/2001 on the scope and content of investment projects and other normative acts of the TDA;

2. Implementation of construction under Part 3 "construction" of the SPA after the issuance of a building permit for the envisaged technical specifications and construction works

162 TDA.

The main activities detailed design should provide and works, to be carried out on the building are detailed in the technical specification.

This contract includes the execution of engineering (design, construction and supervision) for "Repair and reconstruction of the building of housing" B "on campus" Lozenets "Sofia University" St. Kliment Ohridski '. " The activities to be performed are:

1. Preparation of detailed design according to SPA, Ordinance № 4 of 21.05.2001 on the scope and content of investment projects and other normative acts of the TDA;

2. Implementation of construction under Part 3 "construction" of the SPA after the issuance of a building permit for the envisaged technical specifications and construction works

Construction work

Община Пещера | Published February 25, 2017  -  Deadline April 6, 2017
cpvs
45000000, 45300000, 45400000

Subject of the contract covers the implementation of the "Construction works to increase the energy efficiency of residential buildings with 6 lots."

Construction work

Община Пещера | Published February 7, 2017  -  Deadline March 15, 2017
cpvs
45000000, 71221000, 71248000

Subject of the contract covers the implementation of the "preparation of investment projects in phase working, carrying out supervision and construction works to increase the energy efficiency of public municipal or public state buildings in the city. Cave 2 lots" , namely:

1 Lot № 1 - "preparation of investment projects in phase working, carrying out supervision and construction works for" Increasing the energy efficiency of public municipal building, Municipal Administration city. Cave. "

2 Lot № 2 - "Preparation of investment projects in phase working, carrying out supervision and construction works for" Increasing the energy efficiency of public government building: RSPBZN and police station in the town. Cave. "

For Lot № 1, will perform the following activities, namely:

1 Regarding Development of investment project in phase working under the design assignment, SPA, Decree № 4 of 2001 on the scope and content of investment projects and related secondary legislation:

a) Making the necessary survey works and preparation of Detailed design according to the requirements of the contracting authority and the requirements of currently valid legal documents in volume and content identified in the ToR for design.

b) Carrying out all the coordination work project with utility companies and administrations whose authorization, support or advice is required for the implementation of the subject matter of the contract.

c) the performance of his duties as a designer, during construction and commissioning of the construction in accordance with Bulgarian legislation (Decree № 3 of 31.07.2003 of Works at LSP on drawing up acts and protocols during construction and Decree № 2 from 31.7.2003 of works at LSP for commissioning of works in Bulgaria and minimum warranty periods for completed construction works, facilities and construction sites).

d) Removal for its own account of the shortcomings of the project, in the course of the inspections by the developer and / or consultant conducting an evaluation of the project's compliance with the essential requirements for construction and / or technical control for part "Construction" according to the SPA, including and during the construction period.

e) Take responsibility for the quality of the project during the execution of construction.

Construction work

Община Асеновград | Published February 25, 2017  -  Deadline March 30, 2017
cpvs
45000000

The aim of the contract is the choice of contractor to perform planned investment in technical projects works that will be performed reconstruction, rehabilitation and development of spaces in residential West Asenovgrad through renovation and development of the green system and the separation of areas for recreation, sports, games and social networking.

Construction and rehabilitation of street, sidewalk and alley paving, installing a new marking, installation of traffic signs, construction of irrigation system, construction of playgrounds for ages 0-3 / 3-12 years, consistent with safety under Decree № 1 / 12.01.2009 on the terms and conditions of the device and the safety of playgrounds, construction of sports fields, construction of accessible urban environment for people with disabilities, a decision on locations for outdoor sports zones dog Walker, the establishment of new and improvement of existing green areas, placing the elements of street furniture (benches, gazebos, litter bins). A full description of the activities and specifications are in the attached documentation "Technical specification" and the Bill of Quantities.

Construction materials

Община Кирково | Published February 21, 2017  -  Deadline March 23, 2017
cpvs
44110000, 44100000, 44190000

Supply through the purchase of building materials for the needs of Kirkovo municipality for a period of 3 / three / years of the contract. Deliveries will be made periodically upon request of the client.

Supply through the purchase of building materials for the needs of Kirkovo municipality for a period of 3 / three / years of the contract. Deliveries will be made periodically upon request of the client. Types and quantities of construction materials to be supplied are: -226,425 kg cement, lime - 8190 kg, tiles -39 555 pcs., Tiled shutters - 4848 pcs., Onduline corrugated sheets 200 / 0.95 cm - 15 pcs., paint / different / - 2136 kg, latex - 1553, 00 kg, pipes / different / - 116 624 lm, fittings / different / - 620 pcs., mesh fencing - 441 package barbed wire - 240 kg, binding wire -150 kg, cable / different / - 1200 lm boards - 1.80 m cube., beam - 7.50 m cube., beams - 3 cube m., planks -3 m cube., shingles -3 m cube., plywood-30 m sq., chipboard -135 m square., front boards / decorative -Different sizes / -165 lm, doors pressed / various sizes / - 75 pcs., linoleum -570 sq. m, laminate / different sizes / - 1056 m sq., skirting for laminate - 354 pcs., fasteners sills - 642 pcs., podparketno foil -1 038 m sq., locks / different / - 45 pcs., handles locks - 45 pcs., discharge for locks -33 pcs., rollers / different sizes / -132 pcs., brushes - 228 pcs., electrodes -90 package drive for power. flex -35 pcs., cementitious adhesive - 1300 kg, gypsum construction -2340 kg, brick / different / - 8860 pcs., chimney blocks -60 pcs., glass cut to size - 207 sq. m transparent silicone for glass - 72 pcs., concrete poles / different / -795 pcs., metal primer -15 kg, nail darvo- 342 kg, primer to walls 462 kg, sandpaper strip - 15 lm, foam - 15 pcs., toilets PVC - 87 pcs., galvanized gutters - 114 lm, clamps -108 pcs., deriving or obtained pipes - 24 lm, deriving or obtained curves -15 pc ., cisterns Gutter -6 pcs., shut-off valves - metal / ...

Construction supervision services

Община Нови пазар | Published January 21, 2017  -  Deadline March 7, 2017
cpvs
71520000

11 of the TDA. 

The investment projects are subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment projects which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

2.4.

11 of the TDA.

The investment projects are subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment projects which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

1 of the law.

145 of the SPA by the chief architect of the municipality issuing a building permit.

1.2. Construction supervision during construction works

Construction supervision shall be exercised in accordance with the Law on Spatial Planning and the applicable regulations.

The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works.

Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction.

Breach of technical rules and regulations person exercising construction supervision shall be obliged to inform the Regional Directorate for National Construction Control within 3 days of the finding.

Upon completion of construction works the person exercising construction supervision, prepare a final report to the contracting authority.

Persons exercising construction supervision shall be liable for damage inflicted on the contracting authority and other participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects.

Liability under contract for construction supervision is a time not less than the warranty period of the construction.

Construction-related services

Община Горна Оряховица | Published January 27, 2017  -  Deadline February 27, 2017
cpvs
71500000, 71520000

Lot № 1:

The contract includes an assessment of the conformity of projects with the essential requirements for construction works.

Lot № 2: Supervision of works during construction.

An integral part of the notice and documentation for procurement are Technical specifications - for each lot published on the buyer profile.

Construction supervision during construction.

Construction supervision services

Община Попово | Published February 18, 2017  -  Deadline March 16, 2017
cpvs
71520000

The object of this contract is the choice of an independent contractor holding a professional qualification and practical experience in construction supervision under the SPA, to ensure the lawful execution of the works and permission for using the sites covered by the contract.

Within the service subject to the procedure provides that the following activities:

Activity 1: Performing an assessment of investment projects with the essential requirements pursuant to Art. 169, para. 1 of the SPA, subject to the requirements of Art. 142 of the SPA,

Activity 2: construction supervision during construction of all types of works that are performed by the developer of the site, in accordance with statutory powers and duties of the artist as a person exercising construction supervision of construction.

Construction work

Община Габрово | Published January 21, 2017  -  Deadline March 9, 2017
cpvs
45000000, 71315000, 71221000

Implementation of engineering - design, with supervision and construction - in connection with the repair, modernization, implementation of energy saving measures and building an accessible environment in the building of primary school "Sv. St. Cyril and Methodius "and the cultivation of yards.

The scope of design to this contract provides design and development of design solution for creative tailored to the needs and age of the users furnishing of classrooms and facilities in the school.

Execution of construction works for the introduction of measures in the field of energy efficiency; public works - rehabilitation of yard space.

Making supervision of construction activities.

Engineering - design and execution of works for modernization, implementation of energy saving measures and building an accessible environment in the building of "St.. St. Cyril and Methodius ", incl. development of yards and carrying out supervision within the project "Investments in modern educational infrastructure in Gabrovo Municipality" financed by OPRD.

Construction work

Община Разлог | Published January 21, 2017  -  Deadline March 1, 2017
cpvs
45000000

Performance of the contract includes the following activities:

1. Preparation of an investment project in the detailed design phase, according to the technical specifications documentation for procurement and in accordance with Decree № 4 for the scope and contents of investment projects;

2. Performance of Construction works / CMP / by realizing the construction of the site in accordance with Part Three "construction" of the SPA and technical specification documentation for the procurement;

3. Exercise of supervision during the building operations.

Brief description of the activities within the scope of the contract:

1. Development of an investment project;

2. Implementation of works;

3. Supervision.

A detailed description of the activities covered by the order is contained in the Technical Specification.

Construction work

„ЕВН България Топлофикация“ ЕАД | Published February 21, 2017
cpvs
45000000

Carrying out construction, excavation and restoration work along the routes of heating networks and facilities within the "EVN Bulgaria DHC" JSC in lots:

1. Lot № 1: Perform construction, excavation and restoration work on the main routes and distribution of heating networks and facilities within the "EVN Bulgaria DHC" JSC;

2. Lot № 2: Perform construction, excavation and restoration work on connecting routes, rehabilitation and planned repairs of heating networks and facilities within the "EVN Bulgaria DHC" EAD.

Estimated amounts for some of the activities:

1. Tracing and mechanized / manual excavation without refilling - 98,000 meters 3 .

2. backfilling delivery of: sand, river gravel or crushed stone - 105,000 m 3 .

Construction work

Столична община, район Люлин | Published February 21, 2017  -  Deadline March 27, 2017
cpvs
45000000, 45332000

The subject of the contract is "Choosing a contractor to perform construction works (SMR) on the subject:" Engineering Infrastructure (Water) networks m. Bul. "Slivnitsa" in the area between St. "Louis Pasteur" street. " Minsk "area" Lyulin "- III stage, I-your sub and II-nd sub."

The subject of the contract involves carrying out construction works on the subject: "Engineering Infrastructure (Water) networks m. Bul." Slivnitsa "in the area between St." Louis Pasteur "street." Minsk "area" Lyulin "- III stage, I-your sub and II-nd sub. " The site has issued permission for construction № B-64 / 01.07.2013, issued by Ch. Engineer direction "Architecture and Urban Planning" at the Metropolitan Municipality (CO).

Construction work

Община Айтос | Published February 21, 2017  -  Deadline March 27, 2017
cpvs
45000000, 71311000, 45231300

The subject of the contract is "Implementation of engineering (design and construction) project: 'Treatment Plant waste water of the city. Ajtos" 2 lots: Under OP № 1 activities for this project are:

D-verse 1: Preparation of RP for construction of WWTP and bringing infrastructure to the WWTP in the town. Ajtos;

D-verse 2: Supply the necessary mechanical technological equipment for WWTP. Ajtos;

D-verse 3: Construction of WWTP and bringing infrastructure to the WWTP. Ajtos;

D-verse 4: Installation of the necessary mechanical technological equipment for WWTP. Ajtos

D-verse 5: Testing of process equipment, commissioning of the WWTP. Ajtos, staff training and implementation supervision on site.

OP № 2 activities for this project are:

D-verse 1: Preparation of the IP connection to the existing main collector, build a common inlet manifold to the WWTP and discharge manifold;

D-verse 2: Construction of inlet collectors to WWTP and discharge manifold and implementation of auto. site supervision.

Categories
  Bulgaria - Show all countries
София (25)Крумовград (14)Нови пазар (9)Шумен (7)Асеновград (4)Ивайловград (4)Пловдив (4)Стара загора (4)Берковица (3)Благоевград (3)Габрово (3)Горна оряховица (3)Козлодуй (3)Провадия (3)Разлог (3)Самоков (3)Троян (3)Ботевград (2)Генерал тошево (2)Гълъбово (2)Ловеч (2)Никопол (2)Пещера (2)Плевен (2)Поморие (2)Попово (2)Раднево (2)Септември (2)Силистра (2)Червен бряг (2)Айтос (1)Белоградчик (1)България русе (1)Варна (1)Велики преслав (1)Велико търново (1)Велинград (1)Видин (1)Враца (1)Девня (1)Добрич (1)Дупница (1)Златарица (1)Исперих (1)Каварна (1)Казанлък (1)Котел (1)Кърджали (1)Кюстендил (1)Левски (1)Летница (1)Лозница (1)Малко търново (1)Мездра (1)Монтана (1)Несебър (1)Пазарджик (1)Перник (1)Радомир (1)Разград (1)Село стамболово (1)Сливен (1)Смолян (1)Тетевен (1)Хасково (1)Гр. костинброд (1)Гр. пещера (1)Гр. софия (1)Гр.кърджали (1)М. селище (1)С. фотиново (1)С.лесичово (1)