Call +44 800 9755 164

Public tenders for construction in Sint-truiden Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

CVBA Nieuw Sint-Truiden | Published October 30, 2015
Winner
THV Dethier-Keulenh
cpvs
45000000

Sint-Truiden - Ursulinenstraat - construction of 37 housing units.

Sint-Truiden, Olympialaan & Ziekerenweg, construction of 22 rental and owner-occupied housing + 6 construction infrastructure

cvba Nieuw Sint-Truiden | Published February 9, 2015  -  Deadline March 25, 2015
cpvs
45000000

Sint-Truiden, Olympialaan & Ziekerenweg, construction of 22 rental and owner-occupied housing + 6 construction infrastructure

Construction multipurpose community center in Zepperen

Stad Sint-Truiden | Published September 7, 2016  -  Deadline October 18, 2016
cpvs
45000000

Construction multipurpose community center in Zepperen

St. Truiden- Ursulinenstraat - construction of 37 residential units

cvba Nieuw Sint-Truiden | Published October 27, 2015
cpvs
45000000

St. Truiden- Ursulinenstraat - construction of 37 residential units

Construction work

Autonoom Gemeentebedrijf voor de Ontwikkeling van Sint-Truiden (AGOST) | Published July 4, 2015  -  Deadline August 20, 2015
cpvs
45000000

The contract relates to the redevelopment of the Gazometersite, located at the Gazometerstraat 1-7, 3800 Sint-Truiden, which is owned by AGOST. The contract relates to the construction of various structures, namely the creation / realization of: 2154 sqm, 7085 sqm, 3700 sqm, 9207 sqm, 2819 sqm, 70 sqm, 1146 sqm. 26 181 sqm. The matter has been granted planning permission on 03/27/2014 by the Regional Planning Officer (ref .: GSA: 8.00 / 71053 / 19980195.8). The contractor shall in principle as a supervisor / contractor, as will be detailed in the specifications, in charge of the building until provisional acceptance of the mentioned structures. The contractor will thereby be obliged to set up these structures in accordance with the design, technical (performance) specifications, the plans drawn up by the AGOST / Kabost and its architects, engineering firm (s) and / or engineers. In particular, respective contracts to be closed. The creation of the welfare campus: Regarding the achievement of the first two floors of the welfare Campus (office-like environment) the AGOST will assign a (free) building rights to the promoter / contractor and a promotional contract for services work close (the supervisor / contractor will pre-finance the work until the completion of construction) and then AGOST welfare campus decreases at a fixed price. The realization and market risk lies with the promoter / contractor (see paragraph .5.). The establishment of school: The buildings will have achieved by the supervisor against an absolute standard price and this for the construction of a building according to the specifications and plans. The promoter will pre-finance the work until the completion of the construction after the structures surcharge will be transferred to the AGOST that acquires the right to build. The creation of the youth campus: AGOST will assign an adoption of work on the promoter / contractor for the creation of the youth campus. The creation of underground parking: AGOST will assign an adoption of work on the promoter / contractor for the realization of the underground garage. The achievement of the apartments: The realization and market risk lies with the promoter / contractor.

Construction work

Autonoom Gemeentebedrijf voor de Ontwikkeling van Sint-Truiden (AGOST) | Published July 17, 2015  -  Deadline August 20, 2015
cpvs
45000000

Bouwwerkzaamheden

Construction work

Autonoom Gemeentebedrijf voor de Ontwikkeling van Sint-Truiden (AGOST) | Published June 13, 2015
cpvs
45000000

Bouwwerkzaamheden

Entering into loans to finance expansion and replacement construction WZC Home Elisabeth Sint-Truiden

RUSTHUIZEN Z.A. ZUID-LIMBURG | Published November 4, 2014  -  Deadline January 5, 2015
cpvs
66100000

Commitment of funds to finance an expansion- in WZC Home Elisabeth Sint-Truiden and replacement construction

Construction work for swimming pool

Stad Sint-Truiden | Published January 17, 2017  -  Deadline March 1, 2017
cpvs
45212212, 71000000

Call for candidates in the context of a negotiated procedure with publication, with a view to a public-private partnership between the city of Sint-Truiden, a private party to the realization of a new municipal swimming pool and sports site in Cicindriapark.

The contract involves the design (Design), build (Build), finance (Finance), maintenance (Maintenance) and operation (Operate) of a municipal swimming pool and sports site and whose program consists of mandatory and optional programs. This project will be further refined and aligned in gunningsleidraad.

The mandatory minimum program consists of the realization:

1) a 25-meter pool and an instruction / multipurpose:

1) sports pool (25 x 27 meter pontoon);

2) target groups and teaching pool;

3) infant and toddler pool;

4) limited wellness;

5) cafeteria, locker rooms, technical and storage rooms, ...

6) diving area;

2) construction or renovation of multi-purpose hall and separate rooms for sports-related activities and competitions;

3) multi-purpose outdoor sports field with artificial turf;

4) parking for 220 sports related visitors.

The project (municipal swimming pool and sports site) must be borne by the parcel portions of the land cadastral known Sint-Truiden, 3rd Division, Section E, perceelnr. E61G2, E61H2 and E61K2, which are designated as a park area and area for community facilities in the provisionally adopted RUP St. Peter. The plot unit designated to provisionally established RUP St. Peter and residential project area is not included accordingly.

Invitation to submit a tender - Framework construction of new sidewalks and repairing existing sidewalks (2017-2020) - Simplified negotiated procedure with publication

Stad Sint-Truiden | Published November 3, 2016  -  Deadline December 7, 2016
cpvs
45233161

Framework agreement, construction of new sidewalks and repairing existing sidewalks (2017-2020)

Construction work

Nieuw Sint-Truiden CVBA | Published January 16, 2015  -  Deadline March 3, 2015
cpvs
45000000

St. Truiden- Ursulinenstraat - build 37 housing units.

Build a residential care center with integrated nursery lot Green Construction

OCMW SINT-TRUIDEN | Published May 4, 2015  -  Deadline June 12, 2015
cpvs
77300000

Running the green spaces in the new living center with integrated nursery, Diestersteenweg, 61 in 3800 Sint-Truiden.

Construction work

AZ Nikolaas VZW | Published July 4, 2015  -  Deadline August 28, 2015
cpvs
45000000

New construction Campus Beveren - lot 22: demolition and construction environment.

New construction Campus Beveren - Lot 22: Demolition and construction area

AZ Nikolaas vzw | Published June 30, 2015  -  Deadline August 28, 2015
cpvs
45000000

New construction Campus Beveren - Lot 22: Demolition and construction area

Erosion Sint-Truiden: Langstraat Velm

Stad Sint-Truiden | Published June 24, 2015  -  Deadline August 12, 2015
cpvs
45240000

To carry out the contract includes the construction of erosion-fighting measures - reprofiling canal - drainage soils to location in Sint-Truiden - breaking up of road in concrete - repair of roads in concrete (2 x wegverlaging) - constructing overflow wall in concrete blocks - construction curbs - piling construction - construction grass vegetation

Erosion Sint-Truiden - Ovelingenstraat Gelinden

Stad Sint-Truiden | Published March 18, 2016  -  Deadline April 28, 2016
cpvs
45220000, 45232450

To carry out the contract includes the construction of anti-erosion measures:

- Reprofiling canal

- Scarifiying path in concrete

- Repair of roads in concrete

- Construction of curves in concrete and PVC

- Concrete construction kopmuurtjes

- Water erosion coil

- Raising land erosion around lake

- Construction sheet piling

- Construction grass vegetation

Invitation to submit a tender - Framework restore existing trails and construction of new trails - Simplified negotiated procedure with publication

Stad Sint-Truiden | Published March 1, 2016  -  Deadline March 29, 2016
cpvs
45233142

So to make the contractor considers comments on the limit that is allowed him to perform the work, he should make it over to the chief official, within two days of receiving the service command.

The special attention of the contractor should note that the work must be carried out in different places and at different times such as this will be determined according to the necessity by the contracting authority.

If during the term of the contract the network of cycle paths undergoes some modifications, the contractor may be responsible, under the terms of the adoption, with work on the new paths.

The contractor is not entitled to any compensation or price adjustment due to changes in the extent or size of the fiestpaden what he has to maintain.

The deadline for implementation is determined separately for each contract.

Laying cycle tracks N3e Luikersteenweg

Stad Sint-Truiden | Published November 3, 2015  -  Deadline December 11, 2015
cpvs
45233123, 45233142

The adoption comprises mainly: - Preparatory work and topographical work; - Breaking up of existing roads and drains; - Drainage system in a separate system; - Wegherstellingswerken; - Construction of new roads; - Green Construction; - Maintenance of the work during the warranty period.

Redevelopment Market

Stad Sint-Truiden | Published May 27, 2015  -  Deadline July 8, 2015
cpvs
45000000

The contract mainly include: - Signalling of work - Break-up of pavements, linear elements, pipes, ... - Groundwork in excavation and fit the baanbed in excavation by mixing with lime in situ - Adaptation of excavated soil mix for reuse by with cement and / or lime - Wegherstellingswerken - Construction of pavements in cobblestones - Construction of pavements in cut stone tiles - Execute linear elements in natural stone - Installation of RWA and DWA sewage - Connecting homes to the new sewer system (RWA and DWA) - Connection of storm drains to the sewerage - Construction of wells and pull pull lines - linings and sidings (signaling) - Green construction and maintenance during the warranty period - the maintenance work during the warranty period.

Renovation of a school building - 't Willerke

bv bvba architect Rik Maurissen | Published June 6, 2016  -  Deadline July 13, 2016
cpvs
45214200

Renovation of a school building: replacement of a loft with a full floor and construction of a covered playground