Call +44 800 9755 164

Public tenders for construction in Mechelen Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

OCMW Mechelen | Published October 25, 2016  -  Deadline December 15, 2016
Construction work

Construction work

OCMW Mechelen | Published December 8, 2016  -  Deadline December 15, 2016
Construction work

Construction work

OCMW Mechelen | Published October 22, 2016  -  Deadline December 15, 2016

To carry out the Assignment is initially the design, build and maintain a nursing home with central kitchen and multipurpose room (including area instance) for the Social House Mechelen. In addition, we asked for the Project area to draw up a master plan in which the Contractor his global vision gives about the potential of the site. As part of the ambition of the city of Mechelen to present itself as a "smart city" will also ask the contractor to realize its own project "concern for the future" in the foreseeable multi-functional space and this for four (4) years to exploit.

Regarding the DBM section, the Contractor shall be responsible in particular for the design (including obtaining the necessary permit (s)), building the infra structure (including the preparatory work on the building site, the parking and the area construction) and maintenance during twenty-five (25) years. Also, all studies, including safety coordination and EPB reporting, are included in the contract.

The Contracting Government has a Project Definition to further staffing of the Mission established that the basic objectives it with the DBM (o) - wants to achieve mission, set put. (Appendix 5).

Demolition and new construction chalet soccer football Zennester Hombeek

AGB Sport Actief Mechelen | Published November 14, 2016  -  Deadline December 21, 2016
Demolition and new construction chalet soccer football Zennester Hombeek

Schepenhuis - Restoration and conversion to welcome desk and offices of Tourism and UiT - LOT 1

Stad Mechelen | Published October 27, 2016  -  Deadline December 12, 2016
The contractor Lot 1 is responsible for a smooth coordination. 

Summary of the work of Lot 1:

* Restoration

- Maintenance roofs, gutters, chimneys, push barges, ...

- Local inspection and overall maintenance facades

- Reconstruction of the oak plank floors

- Pleisterwerken

* Redesign interior

- Interior carpentry of offices, meeting rooms, storage space, kitchen, ...

- New stages structures

- Improve accessibility

-------- Redevelopment Sanitary

-------- Intermediate levels to be eliminated on the ground floor and will be placed a ramp between the two remaining levels.

- Energy-efficient interventions

-------- Insulating attics

-------- Installation of window frames and glazing bearing

-------- Adjusting the heating system

- Adapting the techniques

-------- Power and data cables to be extended

-------- Lighting is supplemented and renewed

-------- Ventilation system insertion for offices

-------- Access Control System

Refresh -------- CCTV

- Vloerwerken

- Paintings

* Construction of a new entrance to the volume Vleeshouwersstraat to improve

accessibility.

Call for application to participate - Design, Build, Maintance (and operating) - assignment (living) care project Roosendaelveld

OCMW Mechelen | Published October 18, 2016  -  Deadline December 15, 2016

To carry out the Assignment is initially the design, build and maintain a nursing home with central kitchen and multipurpose room (including area instance) for the Social House Mechelen. In addition, we asked for the Project area to draw up a master plan in which the Contractor his global vision gives about the potential of the site. As part of the ambition of the city of Mechelen to present itself as 'smart city' will also ask the contractor to realize its own project "concern for the future" in the foreseeable multi-functional space and this for four (4) years to exploit.

Regarding the DBM section, the Contractor shall be responsible in particular for the design (including obtaining the necessary permit (s)), building the infra structure (including the preparatory work on the building site, the parking and the area construction) and maintenance during twenty-five (25) years. Also, all studies, including safety coordination and EPB reporting, are included in the contract.

The Contracting Government has a Project Definition to further staffing of the Mission established that the basic objectives it with the DBM (o) - wants to achieve mission, set put. (ANNEX 5).

  • 1