Call +44 800 9755 164

Public tenders for construction in Kortrijk Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

VZW De Korenbloem | Published November 26, 2016  -  Deadline January 27, 2017

Expansion of the existing infrastructure of VZW The Cornflower, located on the Pieter de Coninck Avenue Kortrijk, with two projects.

The contract comprises of only one plot to execute "General Contractor". This lot includes the following works: Demolition, foundations, wind- and waterproof structural work, renovation and restoration work, all interior finishes, solid furniture, technical equipment (HVAC, Sanitary, Electrical, and dates, elevators), drainage works, infrastructure and environment construction, regulatory signs .

These works aim to achieve the following two projects:

A subproject

- Renovation of the existing Villa Porch to a local service and knowledge center for young people with dementia,

- New 4 group homes, 5 care flats and a care center for young people with dementia,

- Construction of the immediate external environment.

subproject B

- Demolition of the existing buildings on the Stasegemsestraat 108, 110 and 112,

- Renovation of the existing villa house for the expansion of the day care center for psycho elderly,

- New 4 group homes for the elderly in need of somatic care, day care center, a center with six short-stay rooms and 4 sheltered flats,

- An underground car park with a leveringen- and storage space,

- The outer construction of the access to the site, the above-ground parking and circulation areas, the landscaping.

The file also contains file Umbrella Works. This file includes infrastructure with the aim to use existing park pond as a water buffer basin for the whole site and the connection of Sub-project A on a new electricity and gascabine. This cabin is out of this assignment.

Infrastructure business Plume - Phase 1 in Zwevegem

Intercommunale Leiedal | Published October 28, 2016  -  Deadline December 6, 2016

• Implementation of topographic operations

• Breaking of pavements and their foundations.

• Break-up of sewers.

• Earthworks.

Construction of sewers and construction of manholes, kopmuren and sleeves.

• Building of buffer basins.

Construction of overflow / emergency spillway.

Construction of drainage rings

Construction of foundations.

Construction of street gutters and curbs.

• Installation of storm drains and their connections.

Construction of roadway pavements with weggoten and wadis.

• Realize connections of sewer companies.

Construction of bicycle path pavements.

• Yard signs and signals.

• Signage and markings.

• The maintenance during the warranty period.

Infrastructure and work environment Town Subdivision "Good to Bouve Kerke" - 2nd phase

Stadsontwikkelingsbedrijf Kortrijk | Published November 10, 2016  -  Deadline December 19, 2016

The construction of the garage streets and sidewalks in the subdivision Good to Boeve Church and the

construction of footpaths in St-Denijseweg and Ambassador Baertlaan.

The works mainly comprise what follows:

a. Organisation of topographic operations

b. Breaking up pavements and their foundations

c. earthworks

d. Construction of drainage rings

e. Building foundations

f. Construction of street gutters

g. Places of storm drains and their connections.

h. Construction of streets and sidewalks in small-scale materials

i. yard signs and signals

j. Planting

k. Grasbezaaiingen

k. Maintenance during the warranty period.

This list is not exhaustive.

Implementation period: 40 days

Cornflower

VZW De Korenbloem | Published November 22, 2016  -  Deadline January 27, 2017

Expansion of the existing infrastructure of VZW The Cornflower, located on the Pieter de Coninck Avenue Kortrijk, with two projects.

To carry out the contract comprises 1 lot only "General Contractor". This lot includes the following works: Demolition, foundations, wind- and waterproof structural work, renovation and restoration work, all interior finishes, solid furniture, technical equipment (HVAC, Sanitary, Electrical, and dates, elevators), drainage works, infrastructure and environment construction, regulatory signs .

These works aim to achieve the following two projects:

A subproject

• Renovation of the existing Villa Porch to a local service and knowledge center for young people with dementia

• New group homes with four, five care flats and a care center for young people with dementia

Construction of the immediate external environment

subproject B

• Demolition of the existing buildings on the Stasegemsestraat 108, 110 and 112

• Renovation of the existing villa house for the expansion of the day care center

psycho elderly

• New 4 group homes for the elderly in need of somatic care,

day care center, a center with six short-stay rooms and 4 sheltered flats

• An underground car park with a leveringen- and storage space.

• The outer construction of the access to the site, the above-ground parking and circulation areas, the

landscaping.

The file also contains file Umbrella Works. This file includes infrastructure with the aim to use existing park pond as a water buffer basin for the whole site and the connection of Sub-project A on a new electricity and gascabine. This cabin is out of this assignment.

1001.6 Brand: Free downtown school dept Kleuterbos - Renovation exterior joinery and eaves.

Snoeck en partners nv | Published October 28, 2016  -  Deadline December 15, 2016
Outbreak existing windows and wooden roof constructions. Placing new aluminum joinery. implementing new eaves finished with shelves in mineral wool and place new aluminum eaves.
  • 1