Construction work for water projects

NV De Scheepvaart | Published December 2, 2016  -  Deadline December 5, 2016
water Construction

Construction work

NMBS-Stations B-ST.5O | Published November 24, 2016  -  Deadline January 26, 2017

General.

Current adoption includes the work to implement the finishing and technical equipment of the new access road or "tangent" in Mechelen, which runs partly underground.

The tangent runs from the Brusselsesteenweg (near the flyover to Mechelen-South) until the N15 (near the Customs Square).

Current adoption includes the works of construction of a Bike-o-strade located next to the tangent between the Brusselsesteenweg and the N15.

These works include among others the construction of bicycle and pedestrian tunnels under the existing and newly constructed roads and two bicycle bridges (at the N1 and N26 at halt) on the tangent.

Current adoption involves the construction of a very large landscaped park that runs alongside the tangent from the N1 till the N15.

The adoption consists mainly of preparatory works, drainage works, roads, building structures, finishing works and technical equipment roads and tunnels, road signs, parks and green areas, ....

Construction work for water projects

NV De Scheepvaart | Published November 2, 2016  -  Deadline December 5, 2016

The works include the construction of a new bank defense trailing (= on the landward side of) the existing bank protection on the left bank of the Albert canal in Schoten, thv the companies Gosselin and Depré, the demolition of the old bank protection and the removal of the soil mortar between the old and new bank protection. The bank protection must be adjusted as part of the modernization and deepening of the Albert Canal. Also, a re-laid pavement behind the bank protection.

The works are carried out in four phases. For connecting the realized final foreshores of the old existing bank protection at some stage is always provided with a temporary construction (temporary sheet piling).

Construction of 21 apartments and 7 houses to Kinrooi

Cv Ons Dak | Published October 21, 2016  -  Deadline December 5, 2016
Construction of 21 apartments and 7 houses to Kinrooi, Ophoven "Merrenhofstraat" - Phase 2

Implementation of salt loading site to Paal Beringen - Construction employment spreaders

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Limburg | Published October 27, 2016  -  Deadline December 5, 2016

Implementation of salt loading site to Paal Beringen

Construction employment spreaders

Railway bridge My Site Beringen Phase 1 - Structural restoration

Team van Meer! architecten & co cvba | Published November 10, 2016  -  Deadline December 19, 2016
The work includes the architectural restoration of the former Railway Bridge Mine Site Beringen on Koolmijnlaan.

redevelopment Haute

Antea Belgium | Published November 7, 2016  -  Deadline December 16, 2016

redevelopment Haute

- Signalling of work

- Break-up of pavements, linear elements, tubes, ...

- Adaptation of excavated soil for re-use by mixing with cement and / or lime

- Construction of roadway pavements in asphalt

- Construction of carriageway surfacing in print concrete

- Construction of bike paths in concrete pavement

- Construction of pavements in concrete paving

- Implement concrete linear elements

- Supply and installation of street furniture

- Markings and sidings (signaling)

- Green Construction and maintenance during the warranty period

- The maintenance of the works during the guarantee period.

R / 003 794 Tongeren - Overrepen bottlenecks: sewerage in the Lerestraat and Buts Street

Infrax cvba, die optreedt in naam en voor rekening van Infrax Limburg, Infrax West, Inter-aqua, Inter-energa, Inter-media, Iveg, PBE en Riobra | Published November 2, 2016  -  Deadline December 13, 2016

R / 003 794 Tongeren, Overrepen bottlenecks: sewerage in the Lerestraat and Buts Street.

The contract includes primarily:

> Preparatory work;

> Scarifiying of roads, drainage, linear elements, ...;

> Construction of DWA pipes and manholes;

> Construction of RWA pipes and manholes;

> Installation of home and wretch connections;

> Construction of an open buffer basin;

> Construction of a dam and kopmuren contruction;

> In open loop laying the Bijloop Lerebeek;

> Construction of bituminous pavement, concrete pavement, concrete paving;

> Construction of linear elements.

R / 000465: Hasselt - Albertkanaalstraat

Infrax cvba, die optreedt in naam en voor rekening van Infrax Limburg, Infrax West, Inter-aqua, Inter-energa, Inter-media, Iveg, PBE en Riobra | Published October 26, 2016  -  Deadline December 5, 2016

R / 000465: Hasselt - Albertkanaalstraat.

The contract includes primarily:

- Breaking up of existing pavement;

- Breaking up of existing sewers;

- Construction DWA and RWA sewage;

- Construction RWA buffer;

- Connecting domestic discharges in new sewers;

- Connecting Slokkers on RWA sewers;

- Construction of new pavements in KWS and concrete;

- Construction of bicycle paths in concrete;

- Realization situ linear elements;

- Build situ structures.

No cutlery WBK-BB1102: Albert - City Antwerpen (Merksem) Refresh left up IJzerlaan Bridge.

NV De Scheepvaart, afdeling Waterbouwkunde | Published October 27, 2016  -  Deadline December 2, 2016
The works include the construction of a new bank defense trailing (= on the landward side of) the existing bank protection on the left bank of the Albert Canal in Antwerp (Merksem), to approx. 260 m up the IJzerlaan Bridge, the demolition of the old bank protection and removal of land species between the old and the new bank protection. The bank protection must be adjusted as part of the modernization and deepening of the Albert Canal. This floor works are not part of this contract. The towpath surface shall be reconstructed behind the bank protection.

WBK-BB1086: Albert - Place Shots: Refresh left thv Gosselin and Depré

NV De Scheepvaart | Published October 28, 2016  -  Deadline December 5, 2016

The works include the construction of a new bank defense trailing (= on the landward side of) the existing bank protection on the left bank of the Albert canal in Schoten, thv the companies Gosselin and Depré, the demolition of the old bank protection and the removal of the soil mortar between the old and new bank protection. The bank protection must be adjusted as part of the modernization and deepening of the Albert Canal. Also, a re-laid pavement behind the bank protection.

The works will be carried out in four phases. For connecting the realized final foreshores of the old existing bank protection at some stage is always provided with a temporary coonstructie (temporary sheet piling).

  • 1