Public tenders for construction in Balen Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Cycle path construction work

Gemeente Balen | Published July 6, 2016
Winner
NV Deckx Algemene Ondernemingen
cpvs
45233162, 45232440, 45233120

Preparatory work:

- Site preparation of the site (uprooting of plantations and dismantling of structures) under the works by utility companies, the construction of cycle paths, sewers, ditches and roadsides,

- The breaking up of approximately 5500 sqm in asphalt roadway,

- The breaking up of approximately 1000 sqm sidewalks,

- Cutting into the 10 km asphalt,

- The breaking up of approximately 10 km adjacent paths in concrete and asphalt.

Sewerage and drainage works:

- The construction of two pumping stations,

- Carrying out 7 by pressings,

- The construction of approximately 330 m pressure pipe,

- The creation of approximately 3500 m gravity sewer d 250 mm in stoneware,

- The construction of approximately 360 m gravity sewer d 400mm in stoneware,

- The construction of approximately 120 m gravity sewer d 400 mm in concrete,

- The construction of approximately 560 m gravity sewer d 600 mm (reinforced) concrete,

- The creation of approximately 2450 m culverts d 400mm reinforced concrete kopmuren incl.

- The construction of approximately 7.5 km of new canals braced.

Road works:

- Build 4 small bicycle bridges,

- The construction of approximately 10 km of cycle paths for one-way traffic in cement concrete,

- The construction of approximately 10 km curbs water ditches,

- The creation of approximately 5500 sqm in asphalt roadway,

- The creation of approximately 2000 sqm pavements in pavers,

- The creation of approximately 5500 sqm in paving driveways,

- Constructing berms and planting trees.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

College van burgemeester en schepenen | Published October 24, 2015  -  Deadline December 16, 2015
cpvs
45230000

Preparatory work - the clearing of the ground (digging up plants and dismantling buildings) under the work by utility companies, the construction of cycle paths, sewers, ditches and roadsides. - The break-up of approximately 5500 m2 in asphalt roadway - the breaking up of approximately 1000 m2 of sidewalks - Cutting into approximately 10 km asphalt - Breaking approximately 10 km adjacent cycle paths in concrete and asphalt sewerage and drainage works - The construction of two pumping stations - Conducting seven jacking - The construction of approximately 330 m pressure pipeline - the construction of approximately 3500 m gravity sewer d 250 mm in stoneware - The construction of approximately 360 m gravity sewer d 400 mm stoneware - The construction of approximately 120 m gravity sewer d 400 mm in concrete - The construction of approximately 560 m gravity sewer d 600 mm (reinforced) concrete - Establishment of approximately 2450 m culverts d 400 mm in reinforced concrete incl. kopmuren - The construction of approximately 7.5 km of new canals braced Road Works - Construction of four small bicycle bridges - The construction of approximately 10 km of cycle paths for one-way traffic in cement concrete - The construction of approximately 10 km curbs water ditches - The construction of approximately 5500 m2 in roadway asphalt - Establishment of approximately 2000 m2 of footpaths pavers - The construction of approximately 5500 m2 in paving driveways - The construction of berms and planting trees.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

College van burgemeester en schepenen | Published December 12, 2015  -  Deadline December 16, 2015
cpvs
45230000

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; pavements

BE0100.011159.0130

College van burgemeester en schepenen | Published December 8, 2015  -  Deadline December 16, 2015
cpvs
45230000

Preparatory work - the clearing of the ground (digging up plants and dismantling buildings) under the work by utility companies, the construction of cycle paths, sewers, ditches and roadsides. - The break-up of approx 5500sqm in roadway asphalt - Breaking up approximately 1000sqm sidewalks - Cutting into 10km tarmac - The breakup of 10km bike paths adjacent concrete and asphalt sewerage and drainage works - Construction of two pumping stations - Conducting seven jacking - The construction of approximately 330m discharge pipe - Establishment of approximately 3500m d250mm gravity sewers in vitrified clay - The construction of approximately 360m d400mm gravity sewers in vitrified clay - The construction of approximately 120m gravity drainage d400mm in concrete - The construction of approximately 560m gravity drainage d600mm in (reinforced) concrete - Establishment of approximately 2450m divers d400mm reinforced concrete including kopmuren - The construction of approximately 7.5 km of new canals braced Road Works - Construction of four small bicycle bridges - The construction of approximately 10km one-way cycle tracks in cement concrete - the construction of 10km water curbs ditches - Establishment of approx 5500sqm in roadway asphalt - Establishment of approximately 2000m² footpaths pavers - Establishment of approx 5500sqm in paving driveways - The construction of berms and planting trees

BE0100.011159.0130. Bale, 13 Module installation Trails Chaussée Leopoldsburg 21.095B - Bale, Connection Sewerage Steenweg op Leopoldsburg Phase 2: Schoor village, Schoor, paved road in Leopoldsburg

Gemeente Balen | Published July 1, 2016
cpvs
45233162, 45232440, 45233120

preparatory work

- Site preparation of the site (uprooting of plantations and dismantling of structures) under the works by utility companies, the construction of cycle paths, sewers, ditches and roadsides.

- The break-up of about 5500 m2 asphalt roadway in

- The break-up of approximately 1000 m2 footpaths

- Cutting into approximately 10 km asphalt

- The break-up of about 10 km bike paths adjacent concrete and asphalt

Sewerage and drainage works

- The construction of two pumping stations

- Conducting 7 jacking

- Establishment of approximately 330 m discharge line

- Establishment of approximately 3500 m gravity sewer d 250 mm and stoneware

- Establishment of approximately 360 m gravity sewer d 400mm in stoneware

- Establishment of approximately 120 m gravity sewer d 400 mm in concrete

- Establishment of approximately 560 m gravity sewer d 600 mm (reinforced) concrete

- Establishment of approximately 2450 m culverts d 400mm reinforced concrete kopmuren incl.

- Establishment of approximately 7.5 km of new canals braced

Road works

- Construction of four small bicycle bridges

- The construction of 10 km bike paths for one-way traffic in cement concrete

- The construction of 10 km curbs water ditches

- Establishment of approximately 5500 m2 in asphalt roadway

- Establishment of approximately 2000 m2 of pavements in pavers

- Establishment of approximately 5500 m2 in paving driveways

- The construction of berms and planting trees.

  • 1