Public tenders for construction in Arlon Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Printing and related services

Association intercommunale pour la protection et la valorisation de l'environnement | Published March 21, 2017  -  Deadline May 8, 2017
cpvs
79800000

The service contract covered by this special specifications main purpose:

The design and construction of 45 versions of the collection schedules for affiliated municipalities to collect from the IAEC for the year 2018.

Construction work

Association Intercommunale IDELUX Projets publics | Published February 23, 2017  -  Deadline April 20, 2017
cpvs
45000000, 45400000, 45300000

indoor redevelopment of the site of Houtopia in Houffalize.

Lot 1: Provide and place the flooring, to paint the walls and ceilings, build and install furniture, sets, the foundations, partitions, ensure the printing and placement of graphics, supply and install lighting.

Lot 2: develop, produce and place the "exhibits" (hands-on special described in the specification), perform all relevant engineering tasks, develop and integrate the audiovisual content, provide and place audiovisual material, perform all engineering tasks corresponding, write and translate textual content.

Appointment of a project designer for the construction of an underground car park under the Parc Léopold

Ville d'Arlon | Published September 1, 2016
cpvs
71000000

The mission of the project author is the construction under the Leopold Park, a 200 space car park on two levels with 2 lavatories of pedestrian access including a lift.

The mission of the project is complete author, with the exception of specific facilities in the following area assigned to a project applicant already designated by the city of Arlon.

The project author mission also includes:

the stability engineer Mission

the mission to engineer special techniques;

Safety-health coordination (design and implementation);

overall monitoring of the site.

works contract by open tender. N871 ROUVROY - Dampicourt: Crossing

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published September 9, 2016  -  Deadline October 18, 2016
cpvs
45233142

The works include in particular:

1) Work in charge of Luxembourg Road Directorate are:

- Modernization of the road: new AC20base3-2 AC14surf1-2 and coatings, tape contrebutage or water-edge cast nets in place through the village and the roadside side sidewalk;

- Research foundation purges

- Some parking areas with complete safe;

- In areas to define, between the BK 1 and 4.8: the relining and foundation research.

2) Work in charge of the Town of Rouvroy:

- Construction of sidewalks and bike paths, concrete pavers, with full chest

- Realization of a lighted parking lot to the right of the Town Hall

- Realization of plantations (trees, shrubs, hedges)

- Patching access for local residents.

- Waste disposal;

- Signaling the site;

- Maintenance work during the warranty period.

works contract by open tender. n839 - marche-en-famenne - Bypass - Phase 6

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published September 9, 2016  -  Deadline October 19, 2016
cpvs
45221111, 45233220, 45233221, 45112600, 45112700

The works include in particular:

1) Development of the framework reinforced concrete bridge:

- Special study on the basis of plans provided;

- Construction of an outdoor work area at the final site;

- Creation of on-site concrete frame bridge C35 / 45;

- Realization of screeds and drains;

- Partial demolition of the Rue du Vivier, on 70 m, and necessary earthworks;

- Incremental launching of the book in its final position (weight indication: 2400 tonnes);

- Moving a creek under the bridge;

- Repair of the street du Vivier, including embankments stabilized riprap;

2) The development, in own site, roads between the frame and the bridge roundabout Street Industrial Park:

- Finalization of cut / fill: 30 cm last are not in fact provided in phase 5, whether in cut or fill.

- Drainage in the dump areas.

- Drains + road crossings in pricking the manholes placed in phase 5 in shoulder.

- Subgrade type 4 to 40 cm.

- Conventional water nets, 50 cm wide, cast in place.

- Foundation Type IA 20 cm

- 2 layers of 6 cm in AC14base3-2

- SMA-10-2 4 cm

- Thermoplastic Markings

- Embankments and roadside plantations,

- Grassed verges + slope

3) The disposal of waste;

4) The signaling of the site where it is needed;

5) maintenance work during the warranty period.

The work is subject to an overall period in which a particular timeframe for pushing the frame bridge is situated.

Architectural, construction, engineering and inspection services

Ville d'Arlon | Published September 6, 2016
Winner
A.M. BGS — A.3 — BICE
cpvs

The mission of Project author is the construction under the Leopold Park, a 200 space car park on two levels with 2 lavatories of pedestrian access including a lift.

The mission of the project is complete author, with the exception of specific facilities in the following area assigned to a project applicant already designated by the city of Arlon.

The project author mission also includes:

the stability engineer missions;

the mission to engineer special techniques;

Safety-health coordination (design and implementation);

overall monitoring of the site.

Marche - EAP WEX - improving accessibility of WEX:

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published September 6, 2016
cpvs
45233140

The works include in particular:

 The establishment of any signaling required for completion of this work.

 The signaling of the site.

 In general for all jobs: all signaling the site is a business expense to be spread over all the positions of the bill of quantities.

 The implementation of all recommended measures for the implementation of safety, health of the entire site.

 The signaling necessary for work to be carried along or RN 839 are to be made in coordination with the SPW.

Corporate expense.

 Establishment of shields and books necessary for the stabilization of equipment to build or existing.

 Removal and dismantling of the existing equipment (traffic signs, lights, etc ...)

 Demolition of the water streams, borders, bands contrebutage, etc ... existing law of new development.

 Dismantling and demolition of existing structures.

 selective demolition of existing concrete ditches shoulder of the RN 839

 sawing and milling existing coatings to the right of new infrastructure and facilities.

 The earthworks in cuttings and embankments for the implementation of new infrastructure and existing road on connections.

 The earthworks in cuttings and embankments for the realization of new infrastructures and their development.

 The loading, transport and disposal of surplus excavated material to approved landfill.

 The excavated material could also be used in embankments on the work site following indications of plans and construction management.

 The establishment of foundations and sub-foundations of the new infrastructure.

 Testing the plate amid safe and riprap.

 Achieving hydrocarbon coatings and their contrebutage using water and tape contrebutage concrete nets.

 The known tests ...

Libin - EAP Galaxia - Phase 2B infrastructure: access to EAP Cherry

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published September 6, 2016
cpvs
45233140

The works include in particular:

 The signaling of the site.

 The timber hydrocarbon coatings and demolition of various existing coatings.

 The dismantling and demolition of the fence.

 The demolition of existing structures on the work site.

 The clearing, tree felling and grubbing of wooded areas.

 The earthworks in cuttings and embankments for the realization of roads and different trenches.

 The establishment of sub-foundations, foundations of new infrastructure and testing amid safe and riprap.

 The realization of linear elements cast in place.

 Achieving hydrocarbon coatings including the implementation of a quality plan for the hydrocarbon coatings.

 The establishment of the public lighting network, trenches, cables, lighting, etc.

 The implementation of land bunching, seeding and planting.

 Moving an existing sail.

 The achievement gap, waterworks and sewage head.

 Achieving ducts and penetrations in waiting to the right of the different infrastructures.

 Conducting an island at the entrance of EAP Cherry

 The horizontal and vertical signage.

 The maintenance works and works during the construction period and during the warranty.

 The implementation of all recommended measures for the implementation of safety, health of the entire site.

 The establishment of shields and books necessary for the stabilization of existing structures and build.

 In general for all jobs: all signaling the site is a business expense to be spread over all the positions of the bill of quantities.

Construction work

Régie des bâtiments — Wallonie Région Sud | Published September 2, 2016  -  Deadline September 13, 2016
cpvs

Travaux de construction

HOUFFALIZE BASTOGNE-AR Ugly Meadows Road Libramont, 18-6660 HOUFFALIZE. Replacement of lighting fixtures

Direction régionale du Luxembourg | Published August 23, 2016  -  Deadline September 28, 2016
cpvs
45310000

The replacement of lighting fixtures.

In more detail, the works include:

Lot 1: Replacement of lighting to enhance the energy performance of buildings 043-10 and 043-06 to the CA HOUFFALIZE.

The company includes:

-The Realization of the lighting study to meet the conditions subsidiassions for investments improving the energy performance of a building;

-The Holding of construction documents;

-The Participation in site meetings and drafting of construction meeting minutes;

-The Provision of equipment necessary for the proper execution of the works;

-The Labor required, as well as all relevant constraints in the perfect realization of the work according to these requirements;

-The Installation, connection, commissioning hardware service;

-The Tightening of openings, touching up paint and resserements resistant Rf fire;

-The Cleaning of the site being local and the complete cleaning of the premises at the end of construction;

-The Participation in the provisional acceptance tests;

-The Realization and supply of end of construction documents and as-built plan;

-The Benefits of interviews and repair during the warranty period.

MARCHE-EN-FAMENNE: Park of economic activities of WEX: improving accessibility Phase 2

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published August 23, 2016  -  Deadline September 19, 2016
cpvs
45233140

Works include:

- The establishment of any signaling required for completion of this work (in local roads and regional roads).

- Signalling the site.

- The implementation of all recommended measures for the implementation of safety, health of the entire site.

- The signaling necessary for work to be carried along or N839 in coordination with the SPW.

- Removal and dismantling of the existing equipment (signs, etc ...)

- Demolition of the water streams, curbs, pavement sidewalk, etc ... existing law of new development.

- Sawing and milling existing coatings to the right of new infrastructure and facilities. (N839 and Loop Famenne)

- Earthworks in cuttings and embankments for the implementation of new infrastructure and existing road on connections.

- Earthworks in cuttings and embankments for the realization of new infrastructures and their development.

- The loading, transport and disposal of surplus excavated material to a drop zone following indications of the Works Management.

- The loading, transport and disposal of surplus excavated material to approved landfill (excess material).

- Excavated material could also be partly embankments on the work site following indications of plans and construction management.

- The establishment of foundations and sub-foundations of the new infrastructure.

- Testing at the plate on background trunk and riprap.

- The making of coatings and their hydrocarbon contrebutage using water and tape contrebutage concrete nets.

- Tests on hydrocarbon coating following prescription TAC Qualiroutes

- The realization of shoulders and their connections with existing infrastructures.

- The achievement gap and the gap jig update

- Continuous travel ...

ARLON ITCF EL Chemin de Weyler, 2-6700 ARLON. Replacing the air handling unit of the sports hall

Direction régionale du Luxembourg | Published August 23, 2016  -  Deadline September 29, 2016
cpvs
45330000

Any improvements to the facility and equipment by the contractor during the warranty period, shall be deemed acquired customer, without the latter having to indemnify the contractor under this head.

- All other works, supplies, services, etc ... not provided for in the preceding articles and recognized however needed by the customer for the full establishment and proper functioning of the installation, nothing omitted or excepted;

- The perforations, notches and retrofit;

- Storage equipment;

- Protecting frames, pipes against plastering mortar projections and against the introduction of foreign bodies;

- The cleaning of equipment;

- Acoustic and suppressors;

- The receipt by an approved body;

- The maintenance and security;

- Plans and documentation.

LIBIN - Transinne: construction of a mixed-use building Galileo ILS Centre

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published September 26, 2016
cpvs
45210000, 45233140

Construction of a mixed building

Architectural, construction, engineering and inspection services

Ville d'Arlon | Published October 28, 2016  -  Deadline December 12, 2016
cpvs
71000000

The assembly formed by the old courthouse and former North Hotel (over 5000 m 2 ) Is an important development hub can be used to revitalize the city center.

The will of the town of Arlon is to convert this set into a multifunctional events center.

Given the scale and cost of the project phasing is justified to allow to spread the implementation of the arrangements in time, depending on their budgets can be allocated.

Under these conditions, the duration of the market will exceed 4 years.

It should conduct a public service contract to designate a project applicant responsible for implementing all of the conversion project.

The project author mission is planned in three phases and includes:

1. The establishment of a pre-sketch of the overall project;

2. A mission "classic" author project for the implementation of facilities (via purchase orders issued);

3. A consultancy mission (via purchase order issuance).

Area landscaping of the communal school of Galgenberg

Ville d'Arlon | Published November 3, 2016  -  Deadline December 16, 2016
cpvs
45000000

The work includes:

- The development of access to nursery classes

- The demolition of the existing kindergarten yard and the construction of a new court

- Profiling of the field between the court and the street Neufchâteau and development in one of a playground with drop zones of damping material

- Water harvesting the court and the area of ​​maternal games with connection to sewer system

- The demolition of the existing primary court and the construction of a new court outside flat roof terrace area

- Harvesting water from the primary court with connection to sewer system

- The finalization of fences around the site.

Arlon - Park Hydrion - construction of a clubhouse and a hockey field

Ville d'Arlon | Published October 17, 2016
cpvs
45212000

The works include in particular:

Chapter A: Club House

- Earth.

- Foundation.

- Big work.

- Technical installations.

- Completion.

Chapter B: A land and the surroundings

- Earth - Land plot - Outskirts

- Partial Moving the collector SPGE.

Bastogne - Extension of economic activity park Bastogne 1 - Road Infrastructure

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published August 16, 2016  -  Deadline September 30, 2016
cpvs
45233140

Works including:

- Preparatory work (clearing, removal of fences, etc.)

- Earth in cuttings - embankments (including land bunching) for realization of roads, pedestrian, basin (s) of stormwater management, platforms and shoulders following the guidelines contained in the plans.

- Construction of roads and pedestrian:

• Excavation in cuttings and embankments resumed following profiles plans

• Drainage

• Geotextile, subgrade, foundation, linear elements (borders) and coating (hydrocarbon or concrete).

• Networks for draining stormwater and wastewater (manholes, pipes, etc.)

- Construction of inlet structures (oil separator) and outlet reinforced concrete (including equipment) of the storm basin.

- Public lighting to perform (supply from the existing network) including trenches, cable, candelabra and connections:

• Along the new roads

• Along the N85.

- Low supply voltage plots, telephone and cable ducts for fiber optics.

- Water supply and fire protection (terminals) to perform and to be connected to the existing network.

- Gas supply of plots and to be connected to the existing network.

- The implementation of bunching land on platforms, shoulders (including slope) and the seeding and planting.

- Landscaping.

- Signalling the site.

Rem. :

The storm basin and all ancillary works (reinforced concrete structures, manholes, etc.) must be built before starting infrastructure work on the EAP BASTOGNE 1 following indications of plans and CCS.

Therefore (including construction phase), all the runoff from the EAP will necessarily spent by the pool before being discharged to the stream.

Arlon - programming FPS (PPS) Science Policy - Construction of an extension and renovation old building

Regie des Bâtiments - Wallonie Région Sud | Published July 6, 2016  -  Deadline September 13, 2016
cpvs
45000000

Arlon - programming FPS (PPS) Science Policy - Construction of an extension and renovation old building

Construction work

Régie des bâtiments — Wallonie Région Sud | Published July 9, 2016  -  Deadline September 13, 2016
cpvs
45000000

Arlon — SPF de programmation (SPP) Politique scientifique — Construction d'une extension et rénovation ancien bâtiment.

Architectural, construction, engineering and inspection services

Ville d'Arlon | Published April 23, 2016  -  Deadline June 3, 2016
cpvs
71000000

The mission of Project author is the construction under the Leopold Park, a 200 space car park on two levels with 2 lavatories of pedestrian access including a lift.

The mission of the project is complete author, with the exception of specific facilities in the following area assigned to a project applicant already designated by the city of Arlon.

The project author mission also includes:

the stability engineer Mission

the mission to engineer special techniques;

Safety-health coordination (design and implementation);

overall monitoring of the site.