works contract by open tender. n839 - marche-en-famenne - Bypass - Phase 6

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published September 9, 2016  -  Deadline October 19, 2016
cpvs
45221111, 45233220, 45233221, 45112600, 45112700

The works include in particular:

1) Development of the framework reinforced concrete bridge:

- Special study on the basis of plans provided;

- Construction of an outdoor work area at the final site;

- Creation of on-site concrete frame bridge C35 / 45;

- Realization of screeds and drains;

- Partial demolition of the Rue du Vivier, on 70 m, and necessary earthworks;

- Incremental launching of the book in its final position (weight indication: 2400 tonnes);

- Moving a creek under the bridge;

- Repair of the street du Vivier, including embankments stabilized riprap;

2) The development, in own site, roads between the frame and the bridge roundabout Street Industrial Park:

- Finalization of cut / fill: 30 cm last are not in fact provided in phase 5, whether in cut or fill.

- Drainage in the dump areas.

- Drains + road crossings in pricking the manholes placed in phase 5 in shoulder.

- Subgrade type 4 to 40 cm.

- Conventional water nets, 50 cm wide, cast in place.

- Foundation Type IA 20 cm

- 2 layers of 6 cm in AC14base3-2

- SMA-10-2 4 cm

- Thermoplastic Markings

- Embankments and roadside plantations,

- Grassed verges + slope

3) The disposal of waste;

4) The signaling of the site where it is needed;

5) maintenance work during the warranty period.

The work is subject to an overall period in which a particular timeframe for pushing the frame bridge is situated.

Marche - EAP WEX - improving accessibility of WEX:

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published September 6, 2016
cpvs
45233140

The works include in particular:

 The establishment of any signaling required for completion of this work.

 The signaling of the site.

 In general for all jobs: all signaling the site is a business expense to be spread over all the positions of the bill of quantities.

 The implementation of all recommended measures for the implementation of safety, health of the entire site.

 The signaling necessary for work to be carried along or RN 839 are to be made in coordination with the SPW.

Corporate expense.

 Establishment of shields and books necessary for the stabilization of equipment to build or existing.

 Removal and dismantling of the existing equipment (traffic signs, lights, etc ...)

 Demolition of the water streams, borders, bands contrebutage, etc ... existing law of new development.

 Dismantling and demolition of existing structures.

 selective demolition of existing concrete ditches shoulder of the RN 839

 sawing and milling existing coatings to the right of new infrastructure and facilities.

 The earthworks in cuttings and embankments for the implementation of new infrastructure and existing road on connections.

 The earthworks in cuttings and embankments for the realization of new infrastructures and their development.

 The loading, transport and disposal of surplus excavated material to approved landfill.

 The excavated material could also be used in embankments on the work site following indications of plans and construction management.

 The establishment of foundations and sub-foundations of the new infrastructure.

 Testing the plate amid safe and riprap.

 Achieving hydrocarbon coatings and their contrebutage using water and tape contrebutage concrete nets.

 The known tests ...

Libin - EAP Galaxia - Phase 2B infrastructure: access to EAP Cherry

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published September 6, 2016
cpvs
45233140

The works include in particular:

 The signaling of the site.

 The timber hydrocarbon coatings and demolition of various existing coatings.

 The dismantling and demolition of the fence.

 The demolition of existing structures on the work site.

 The clearing, tree felling and grubbing of wooded areas.

 The earthworks in cuttings and embankments for the realization of roads and different trenches.

 The establishment of sub-foundations, foundations of new infrastructure and testing amid safe and riprap.

 The realization of linear elements cast in place.

 Achieving hydrocarbon coatings including the implementation of a quality plan for the hydrocarbon coatings.

 The establishment of the public lighting network, trenches, cables, lighting, etc.

 The implementation of land bunching, seeding and planting.

 Moving an existing sail.

 The achievement gap, waterworks and sewage head.

 Achieving ducts and penetrations in waiting to the right of the different infrastructures.

 Conducting an island at the entrance of EAP Cherry

 The horizontal and vertical signage.

 The maintenance works and works during the construction period and during the warranty.

 The implementation of all recommended measures for the implementation of safety, health of the entire site.

 The establishment of shields and books necessary for the stabilization of existing structures and build.

 In general for all jobs: all signaling the site is a business expense to be spread over all the positions of the bill of quantities.

MARCHE-EN-FAMENNE: Park of economic activities of WEX: improving accessibility Phase 2

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published August 23, 2016  -  Deadline September 19, 2016
cpvs
45233140

Works include:

- The establishment of any signaling required for completion of this work (in local roads and regional roads).

- Signalling the site.

- The implementation of all recommended measures for the implementation of safety, health of the entire site.

- The signaling necessary for work to be carried along or N839 in coordination with the SPW.

- Removal and dismantling of the existing equipment (signs, etc ...)

- Demolition of the water streams, curbs, pavement sidewalk, etc ... existing law of new development.

- Sawing and milling existing coatings to the right of new infrastructure and facilities. (N839 and Loop Famenne)

- Earthworks in cuttings and embankments for the implementation of new infrastructure and existing road on connections.

- Earthworks in cuttings and embankments for the realization of new infrastructures and their development.

- The loading, transport and disposal of surplus excavated material to a drop zone following indications of the Works Management.

- The loading, transport and disposal of surplus excavated material to approved landfill (excess material).

- Excavated material could also be partly embankments on the work site following indications of plans and construction management.

- The establishment of foundations and sub-foundations of the new infrastructure.

- Testing at the plate on background trunk and riprap.

- The making of coatings and their hydrocarbon contrebutage using water and tape contrebutage concrete nets.

- Tests on hydrocarbon coating following prescription TAC Qualiroutes

- The realization of shoulders and their connections with existing infrastructures.

- The achievement gap and the gap jig update

- Continuous travel ...

ARLON public-market services relating to the appointment of a project author for the realization of an urban renewal study for the downtown Arlon

Ville d'Arlon | Published October 5, 2015  -  Deadline October 28, 2015
cpvs
71000000

Following the entry into force of the new regulation on the award of grants by the Walloon Region for the execution of urban renewal operations (Decree of February 28, 2013), the scope of this ancient operation will be automatically repealed August 31, 2019. Considering that the old urban renewal project comes to an end and that the launch of a new operation would continue the redevelopment policy and revitalization of the City initiated under the old operation, as well as 'through various projects under study or construction, the city of Arlon wants to lead a new urban renewal project. Should be offered in downtown the opportunity to develop in a renovated urban setting, restructured and reorganized. This mission and focuses on achieving the overall mission of developing and monitoring urban renewal issue until its approval (positive opinion) by ARCT and the Walloon Government. The proposed study area is annexed to the specifications on the understanding that it might have to move the margin including the priorities and issues that will be identified during the study, and without the Project author can claim additional fees. The mission will be conducted under Article 173 of CWATUP, the Order of the Walloon Government of February 28, 2013 on the granting by the Walloon Region grants for the execution of urban renewal projects and the Ministerial Order of 24 June 2013 concerning the content of the urban renewal case. Besides the production of the documents required by the CWATUP and implementing decrees (see point 4 below) or the code that will replace it, the project author will perform the following tasks in the fee package proposed: -Participation in meetings relating to the preparation of the urban renewal folder on a schedule or a frequency to be determined in agreement with the Municipal College and the Municipal Commission of Urban Renewal (hereinafter CCRU) and approval of this folder (and communal College Board, ARCT ,.); -Writing meeting minutes. This study should be aimed to identify clear and specific actions oriented on the theme of tourism and trade so as to upgrade the historic and commercial center of the city.

ARLON ITCF EL Chemin de Weyler, 2-6700 ARLON. Replacing the air handling unit of the sports hall

Direction régionale du Luxembourg | Published August 23, 2016  -  Deadline September 29, 2016
cpvs
45330000

Any improvements to the facility and equipment by the contractor during the warranty period, shall be deemed acquired customer, without the latter having to indemnify the contractor under this head.

- All other works, supplies, services, etc ... not provided for in the preceding articles and recognized however needed by the customer for the full establishment and proper functioning of the installation, nothing omitted or excepted;

- The perforations, notches and retrofit;

- Storage equipment;

- Protecting frames, pipes against plastering mortar projections and against the introduction of foreign bodies;

- The cleaning of equipment;

- Acoustic and suppressors;

- The receipt by an approved body;

- The maintenance and security;

- Plans and documentation.

Works contract by public tender. N801 - Léglise: Assenois - Les Fosses. 3rd phase - BK 5.6 to 7.6.

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published July 29, 2015  -  Deadline September 10, 2015
cpvs
45233220, 45233229, 45233221

The work shall include: 1) Work in charge of the Luxembourg Road Directorate: - Laying a drip in Highway 1 section Chevaudos, concrete pipes, 300 mm diameter, with the lean concrete coating up the trunk background. - Possible purges The trunk function tests to the plate. - The trickle-type borders IIIE cast in place. - The installation of drains 30 cm wide, connected to the manholes by PVC200 pipes. - Placing a sublayer AC14base3-2 200 kg / m2 and a AC14surf1-2 4 cm. - Extruded markings. - The repair of shoulders, sidewalks and bordering entries to the right of SPW site. 2) Work dependents of the Commune of Leglise: construction of a sidewalk to the right of the site SPW Chevaudos to: - general cuttings; - Sub-base in road-type 4, 30 cm thick; - ID1 concrete curb poured in situ; - Type IIIE riprap foundation, 20 cm thick; - Covering type hydrocarbon AC10surf4-1, 5 cm thick on average. 3) waste disposal; 4) signaling site; 5) maintenance work during the warranty period.

Commune of Libin - Park of economic activities Galaxia - Infrastructure Phase 2B: access to EAP Cherry

Association intercommunale pour le développement économique durable de la province de Luxembourg | Published May 29, 2015  -  Deadline June 22, 2015
cpvs
45233140

The works include in particular: - The signaling of the site. - The timber hydrocarbon coatings and demolition of various existing coatings. - The dismantling and demolition of the fence. - The demolition of existing structures on the work site. - The clearing, tree felling and grubbing of wooded areas. - Earthworks in cuttings and embankments for the realization of different roads and trenches. - The establishment of sub-foundations, foundations of new infrastructure and testing background trunk and riprap. - The realization of linear elements cast in situ. - The realization of hydrocarbon coatings including the implementation of a quality plan for the hydrocarbon coatings. - The establishment of the public lighting network, trenches, cables, lamps, etc. - The implementation of in bunching of land, sowing and planting. - Moving a wall connection. - The achievement gap, waterworks head and draining. - The realization of ducts and penetrations awaiting the right of different infrastructures. - The realization of an island at the entrance of EAP Cherry - Horizontal and vertical signaling. - Maintenance work and works during the construction period and during the warranty. - The implementation of all recommended actions for the implementation of security, health of the entire site. - The establishment of armor and works necessary for the stabilization of existing structures and build.

Florenville - EAP - Additional Highways

Association intercommunale pour le développement économique durable de la province de Luxembourg | Published January 13, 2015  -  Deadline February 10, 2015
cpvs
45233140

The work, in particular: - The development of all signage necessary to accomplish this work. - Signalling the site. - Maintenance work and works during the construction period, during the warranty. - In general for all work: the set of signaling the site is a business expense to be spread over all positions bill of quantities. - Etc. The implementation of all measures recommended for the implementation of safety, health of the entire site. - The timber hydrocarbon coatings - Selective demolition hydrocarbon coatings - Selective demolition of some foundations related and non-related materials - Selective demolition streams of water - Selective demolition borders - The dismantling drains in reuse - Selective demolition of existing pipes (fitting drains) - The earthworks necessary for the implementation of the road extension - compaction compartment floor, laying geogrid and geotextile - The realization of sub-foundations and foundations right road - Discount profile under existing foundations - possible ground Replacement - The realization of a hydrocarbon coating (2 layers) - The realization of borders and the extension of water nets of road - the supply and installation of drains smell and cut their connections to the pipeline - Excavations necessary seeking impétrants and pipelines - The extension of public lighting - Extension of drainage pipes (. ..

Renovation of the pool Sports Center Bastogne

Association Intercommunale IDELUX Projets publics | Published October 21, 2014
cpvs
45212212, 45212230, 45310000

Les travaux comportent entre autre les éléments suivants : Infrastructures : - Le démontage soigné du gros-oeuvre, des éléments de toiture et des parachèvements intérieurs de la piscine au droit de la zone d'intervention ; - Les terrassements en déblais et en remblais pour la réalisation de la nouvelle construction et chemins piétons d'accès ; - Les précautions d'usage pour la réalisation des fondations contre bâtiment existant ; - La réalisation des tranchées et pose des canalisations d'évacuation des eaux de pluie et eaux usées et raccordements dans CV existantes le cas échéant ; - Les terrassements en tranchées pour pose des conduites d'eau, des conduites de gaz, des câbles électriques, téléphoniques, informatiques, etc ; - L'établissement d'un réseau de drainage et raccordement vers le réseau égout communal ; - L'entretien des travaux durant la période de garantie ; - La signalisation du chantier. Gros oeuvre fermé : - Les terrassements en déblais et en remblais nécessaires à la réalisation de l'extension de la piscine ; - Les terrassements en déblais et en remblais pour la réalisation des différentes fondations de l'extension de la piscine ; - L'établissement de l'extension de la piscine ; - L'établissement des empierrements de sous-fondation et de fondation de la dalle de sol ; - La réalisation de la dalle de sol en béton ; - L'établissement des ouvrages en béton armé (semelles, plots, poutres, voiles ,prédalles) ; - La fourniture et la mise en place d'une charpente en bois sur l'extension ; - La fourniture et la mise en place d'une couverture en étanchéité ; - L'évacuation des eaux de toiture de l'extension ; - Les Menuiseries en Aluminium extérieur et vitrage des différents éléments de façade ; - La réalisation des façades isolantes et encadrements. Finitions intérieures : - Les chapes sous revêtement ; - Le cimentage de maçonnerie ; - Les seuils de portes et fenêtres, tablettes intérieures ; - Les carrelages et les plinthes ; - Les cloisons ; - Le plâtrage ; - La rénovation complète des deux bassins ; - Les faïences ; - Les peintures des différents murs et plafonds. - Les équipements techniques et spécifiques à la zone de détente. Equipements techniques : - Installations de traitement d'eau (filtration, réseau de pulsion et de reprise d'eau, pompes, régulation, .) ; - Installations de chauffage et de sanitaire (chauffage différencié des eaux de bassin, régulation, eau froide et mitigée, appareils sanitaires, adaptation de la régulation existante, .) ; - Installations de ventilation de la zone vestiaires et des bacs tampons (groupe de pulsion avec récupérateur à plaques, gaines de ventilations, extraction des locaux de stockage, régulation, .) ; - Installation d'un système de détection anti-noyade ; - Installations d'électricité (câblage, tableaux, éclairage et éclairage de secours, protections, détection incendie, asservissement de portes, .) ; - Installations d'éclairage et d'éclairage de secours.

works contract by open tender. N871 ROUVROY - Dampicourt: Crossing

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published September 9, 2016  -  Deadline October 18, 2016
cpvs
45233142

The works include in particular:

1) Work in charge of Luxembourg Road Directorate are:

- Modernization of the road: new AC20base3-2 AC14surf1-2 and coatings, tape contrebutage or water-edge cast nets in place through the village and the roadside side sidewalk;

- Research foundation purges

- Some parking areas with complete safe;

- In areas to define, between the BK 1 and 4.8: the relining and foundation research.

2) Work in charge of the Town of Rouvroy:

- Construction of sidewalks and bike paths, concrete pavers, with full chest

- Realization of a lighted parking lot to the right of the Town Hall

- Realization of plantations (trees, shrubs, hedges)

- Patching access for local residents.

- Waste disposal;

- Signaling the site;

- Maintenance work during the warranty period.

Invitation to submit offers - SAAE Mirwart: retrofitting buildings - Negotiated procedure with direct advertising

Province de Luxembourg | Published March 29, 2016  -  Deadline April 21, 2016
cpvs
45000000

Mirwart The site should accommodate from September 2016, children who were placed at the Domaine de Beauplateau.

The work involves the retrofitting of buildings Site Mirwart. On the high implantation, there are buildings named: CHL (Hosting and Recreation Centre), ICPS (Institute of Managers and Social Promotion). On the low-set, there is the Old Mill, the Conciergerie and the Pré des Forges.

This work will focus only on the amenities of the buildings, to meet the specific housing criteria SAAE children, and CAU PPPCAS. short and long term accommodation.

Work will focus on the construction of new rooms, rehabilitation of health, compliance and adaptation of special technical facilities.

The facilities must always be completed by August 21, 2016.

REDEVELOPMENT OF THE FALSE WATER VIRTON - DRIP Marchal A COURT VIRTON

Association Intercommunale pour la protection et Valorisation de l'Environnement (AIVE) | Published October 16, 2014  -  Deadline November 24, 2014
cpvs
45246100

Part of the work is on the roads in the network IIIa. This part of site is ranked 3rd category (maximum allowed less than 50 km / h) according to AM of 07.05.1999. In addition, the site strongly gene flow. Works include dependents of the IAEC: installing a drip PP250 on the right bank of the Water False rejection with a look in front of the firehouse Street Mill Virton _ installing a drip PP315 on the left bank of the Water False rejection with a look in front of the firehouse Street Mill Virton, and charged to the SPW-DGO3 _ the demolition of existing structures and equipment and restoring walls and embankment invert of the False Water _ ancillary works in carpentry and metalwork (reconstitution railings and gateways). The construction will take place in one phase and has only partly.

Procurement technical and management advisory services for the installation of a biogas unit using the slash downstream cattle AMB Veviba

Association intercommunale pour le développement économique durable de la province de Luxembourg (IDELUX) | Published December 2, 2014  -  Deadline January 13, 2015
cpvs
71300000

This contract is a service contract within the meaning of Class 12 of Schedule 2 of the Act of 15 June 2006: architectural, engineering services and integrated engineering services. This company located in the industrial zone of Bastogne 1, rue slaughterhouses, No. 6 would have a surface that can accommodate future processor of animals for slaughter by-products. There are no nearby residential area. The site will be fully landscaped, including, as the following, in part from various infrastructure put in place to comply with the order of the Walloon Government establishing the sectoral conditions on biogas plants (see regulations applicable to this contract): - development of access roads and roads; - Closing marking the separation between the biogas plant + auxiliaries and slaughterhouse premises; - Lighting site; - Collection of rain water; - Connection to the escape routes of wastewater after treatment, in accordance with the regulations in force; - Connection to the grid; - Connection to the telephone network; - Special tools (not available in standard commercially) required for maintenance of equipment. - Operating facilities: compressed air outlet ,. - Open up a platform for remote management of the installation and the realization of basic lab tests. The first installment is firm while the following are conditional: Requirements Definition and sketches); First conditional phase: Preliminary Validation) 2nd conditional phase: Drafting of tender documents for the works contract for the design / construction); 3rd conditional phase: the award report); Assistance during the construction phase);

Cesspool or septic tank emptying services

RW-SPW-DGO1-DRL — direction des routes du Luxembourg | Published June 17, 2016
Winner
Theis Marcel SPRL
cpvs
90460000, 90640000

The services covered by this company include:

1. The cleaning of drains or sumps;

2. The cleaning of manholes;

3. The cleaning of gutters;

4. The cleaning of water nets on the road sector;

5. Cleaning the pavement;

6. The clearance from the edge of the coating (trimming);

7. The construction signs;

8. Waste disposal and development centers approved (CET or CTA).

Commune of Bouillon - Rehabilitation of High Routes streets of Laite and Parish Driveway

Association Intercommunale pour la protection et la Valorisation de l'Environnement | Published January 21, 2016  -  Deadline March 1, 2016
cpvs
44130000, 45200000

Installation of drainage pipes and manholes

Laying of water distribution pipes

Slaughter and grubbing of trees

Excavation for construction of a new trunk road

Laying of foundation and subgrade

Laying cast and precast linear elements

Hydrocarbon paving

Realization of hydrocarbon sidewalks

Lead time: 120 jo

Cesspool or septic tank emptying services

RW-SpW-DGO1-DRL — direction des routes du Luxembourg | Published October 24, 2015  -  Deadline November 30, 2015
cpvs
90460000, 90640000

The services covered by this company include: 1) the cleaning of drains or sumps; 2) the cleaning manholes; 3) the cleaning of gutters; 4) cleaning the streams of water on the road sector; 5) the cleaning of the road surface; 6) clearance from the edge of the coating (trimming); 7) the construction signs; 8) waste disposal and implementation accredited centers (CET or CTA).

Service contract by open tender. DGO1.32 - Bail maintenance of cleanliness - brushing and cleaning

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published October 21, 2015  -  Deadline November 30, 2015
cpvs
90460000, 90640000

The services covered by this company include: 1) the cleaning of drains or sumps; 2) the cleaning manholes; 3) the cleaning of gutters; 4) cleaning the streams of water on the road sector; 5) the cleaning of the road surface; 6) clearance from the edge of the coating (trimming); 7) the construction signs; 8) waste disposal and implementation accredited centers (CET or CTA).

service contract by open tender. d132.17 - maintenance lease plantations. walk-en-famenne 2015 - SPW.

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published October 13, 2015  -  Deadline November 12, 2015
cpvs
77300000, 77340000

The services shall include: 1. mowing of median and slope; 2. Rest Air mowing; 3. Tree planting pit and guardian; 4. weeding; 5. felling of trees and grubbing; 6. clearing; 7. size of hedges and shrubs; 8. pruning and tree pruning; 9. Benefits governed; 10. waste disposal; 11. construction signs; 12. tree maintenance during the warranty period.

service contract by open tender. d132.16 - maintenance lease plantations. bastogne 2015 - spw.

RW-SpW-DGO1-DRL-Direction des Routes du Luxembourg | Published October 13, 2015  -  Deadline November 10, 2015
cpvs
77300000, 77340000

The services shall include: 1. mowing of median and slope; 2. felling of trees and grubbing; 3. clearing and size white shrubs; 4. vertical size of shrubs and size for signaling release; 5. pruning and tree pruning; 6. Tree planting pit and guardian; 7. benefits governed; 8. waste disposal; 9. construction signs; 10. tree maintenance during the warranty period.