Call +44 800 9755 164

Public tenders for construction in Arlon Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

ARLON AR Construction of a sports hall

Ministère de la Communauté française | Published February 4, 2015  -  Deadline March 17, 2015
cpvs
45214000

ARLON AR Rue de Sesselich, Arlon 83-6700 Construction of a sports hall - Part 2 This is the construction of a sports hall on the Athénée Royal site with direct access to the main car park. Part 2 consists -The construction of an open hall consists of a metal frame -The roofing and cladding in sheet steel panels coated with -L'habillage windows of the upper part of the posts with a cladding wood.)

Building construction work

Association intercommunale pour le développement économique durable de la province de Luxembourg | Published September 30, 2016
Winner
Association momentanée Duchene — Wust
cpvs
45210000, 45233140

Construction of a mixed building.

VIELSALM IESPSCF - Construction and installation of a high-voltage transformer

Ministère de la Communauté française | Published February 19, 2015  -  Deadline March 31, 2015
cpvs
45300000

VIELSALM IESPSCF - Rue du Château, 19-6690 VIESALM construction and installation of high voltage cabin following the construction of a boarding school and various connection work with old electrical installation of the IESPSCF.

LIBIN - Transinne: construction of a mixed-use building Galileo ILS Centre

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published September 26, 2016
cpvs
45210000, 45233140

Construction of a mixed building

Construction work

Régie des bâtiments — Wallonie Région Sud | Published September 2, 2016  -  Deadline September 13, 2016
cpvs

Travaux de construction

ARLON AR Construction of a sports hall - part 2

Direction Générale des Infrastructures - Service général des Infrastructures scolaires de la Fédération Wallonie-Bruxelles - Direction régionale du Luxembourg | Published May 6, 2015  -  Deadline June 18, 2015
cpvs
45214000

ARLON AR Construction of a sports hall - part 2 The second part consists of an open -Construction lobby composed of a metal frame -The cover and the cladding panels of sheet steel painted with berries - The skin of the upper part of the posts with wood siding.)

HOTTON EFACF construction and installation of a cab HT

Ministère de la Communauté française | Published December 3, 2014  -  Deadline January 14, 2015
cpvs
45317000

HOTTON EFACF - Avenue de la Gare, 42-6990 HOTTON construction and installation of high voltage cabin.

Construction of rental housing + 7 creation of the surroundings and facilities WOLKRANGE MESSANCY

Habitations Sud-Luxembourg | Published September 11, 2015  -  Deadline October 26, 2015
cpvs
45211000

Construction of rental housing + 7 creation of the surroundings and facilities WOLKRANGE Commune MESSANCY

Arlon - programming FPS (PPS) Science Policy - Construction of an extension and renovation old building

Regie des Bâtiments - Wallonie Région Sud | Published July 6, 2016  -  Deadline September 13, 2016
cpvs
45000000

Arlon - programming FPS (PPS) Science Policy - Construction of an extension and renovation old building

Construction of a wastewater treatment plant 2200 EH in Attert

Association Intercommunale pour la protection et la Valorisation de l'Environnement | Published January 21, 2016  -  Deadline April 12, 2016
cpvs
45252100

Construction of a biological treatment plant by activated sludge in Attert 2200 EH. Preparatory work - Connection to distribution networks (water, electricity, telephone) - Earthworks - Roads to access and internal roads - Area landscaping (planting, turfing, fencing) - Implementation of wastewater treatment works (lift, bar screen, sand trap, flow limiter, selector, aeration basin, secondary clarifier, silo for storing sludge, flow measurement) - Creation of a technical building -Connection to collectors under pressure and gravity - Various works: electrical, automation , supervision, ...

VIELSALM IESPSCF Construction of a boarding school and a kitchen-restaurant: electrical installation

Ministère de la Communauté française | Published January 9, 2015  -  Deadline February 10, 2015
cpvs
45311000

VIELSALM IESPSCF Construction of a boarding school and a restaurant kitchen: electrical installation. The work includes the completion of the electrical system, fire detection system, datas and a burglar alarm system (wiring only).

Architectural, construction, engineering and inspection services

Ville d'Arlon | Published May 25, 2016  -  Deadline July 8, 2016
cpvs
71000000

Services d'architecture, services de construction, services d'ingénierie et services d'inspection

Construction work

Régie des bâtiments — Wallonie Région Sud | Published July 9, 2016  -  Deadline September 13, 2016
cpvs
45000000

Arlon — SPF de programmation (SPP) Politique scientifique — Construction d'une extension et rénovation ancien bâtiment.

Architectural, construction, engineering and inspection services

Ville d'Arlon | Published September 6, 2016
Winner
A.M. BGS — A.3 — BICE
cpvs

The mission of Project author is the construction under the Leopold Park, a 200 space car park on two levels with 2 lavatories of pedestrian access including a lift.

The mission of the project is complete author, with the exception of specific facilities in the following area assigned to a project applicant already designated by the city of Arlon.

The project author mission also includes:

the stability engineer missions;

the mission to engineer special techniques;

Safety-health coordination (design and implementation);

overall monitoring of the site.

Architectural, construction, engineering and inspection services

Ville d'Arlon | Published April 23, 2016  -  Deadline June 3, 2016
cpvs
71000000

The mission of Project author is the construction under the Leopold Park, a 200 space car park on two levels with 2 lavatories of pedestrian access including a lift.

The mission of the project is complete author, with the exception of specific facilities in the following area assigned to a project applicant already designated by the city of Arlon.

The project author mission also includes:

the stability engineer Mission

the mission to engineer special techniques;

Safety-health coordination (design and implementation);

overall monitoring of the site.

LIBIN - Transinne: construction of a mixed-use building - Galileo ILS Centre

Association intercommunale pour le développement économique durable de la Province de Luxembourg | Published May 19, 2016  -  Deadline July 14, 2016
cpvs
45210000, 45233140

In addition, pursuant to Article 86 of the Royal Decree of 15 July 2011, if a possible delay of construction due to the contractor ENTAILED, vis-à-vis the contracting authority, financial loss related to a claim the European Commission (justified by the high strategic potential of the site and the significant financial impact of the Galileo program), the contracting authority directly have repercussions these damages to the contracting company.

Appointment of a project designer for the construction of an underground car park under the Parc Léopold

Ville d'Arlon | Published September 1, 2016
cpvs
71000000

The mission of the project author is the construction under the Leopold Park, a 200 space car park on two levels with 2 lavatories of pedestrian access including a lift.

The mission of the project is complete author, with the exception of specific facilities in the following area assigned to a project applicant already designated by the city of Arlon.

The project author mission also includes:

the stability engineer Mission

the mission to engineer special techniques;

Safety-health coordination (design and implementation);

overall monitoring of the site.

VIELSALM IESPSCF Construction of a boarding school and a kitchen-restaurant - Sanitary lot

Ministère de la Communauté française | Published March 24, 2015  -  Deadline May 12, 2015
cpvs
45330000

VIELSALM IESPSCF Rue du Château, 19-6690 VIELSALM Construction of a boarding school and a kitchen-restaurant - lot sanitairesL'installation consists of: -a mains cold water, rain water, hot water and recirculating water Polybutylene -a network of domestic sewage to performing acoustic properties of polyethylene enriched barium sulphate -a high-density polyethylene ventilation network -vannes setting -vannes to check -clapets stop -compteurs -Pump on -Filters -séparateur grease recirculation circuit -a recovery facility rainwater -a network fire galvanized -dévidoirs -manomètre sanitary -Apparatus such as: * * sinks washbasin sinks * * * hoppers showers * WC nstruction of a boarding school and a kitchen-restaurant - Sanitary lot

CAMPAIGNS CRUSHING / SCREENING WASTE INERT CONSTRUCTION SITES AND OPERATING HABAY TENNEVILLE

AIVE - Secteur Valorisation et Propreté | Published February 9, 2015  -  Deadline March 27, 2015
cpvs
90513000

DESCRIPTION OF THE MISSION 1. Background The operations department of IAEC receives inert construction waste on it must be crushed and screened on its platforms Habay and Tenneville before putting it on the market. To do this, it is for an outside company specialized and equipped for this type of service. 2. Description of the tasks This contract relates to nip benefit armed or unarmed oversized concrete, scalping, crushing, screening and sorting (separation of undesirable) of inert construction waste deposited on Recylux slabs Habay sites and Tenneville. These benefits should lead to the production of aggregates conforming to the requirements of special specifications and in compliance with regulatory requirements imposed on Recylux activities (maximum inventory size, ...). The processing relates to an alleged total annual tonnage of 52,000 tonnes for the two sites. The treatment of this size is usually over two campaigns per year per site. This estimate is given for information only. These predictive values ​​are not binding on the contracting authority. The contractor shall in any claim for damages and / or interest or other similar compensation if the contracting authority does not reach or exceed these values. The Contractor's unit prices are valid regardless of the quantity that will actually transported.

CONSTRUCTION OF CANOPY LOGISTICS SLAB

AIVE | Published August 24, 2015
cpvs
45213200

Works including: - sawing of the existing pavement. - Demolition localized coating and stony foundation. - Foundations. - Metal frame. - Sheet metal roofing and siding. - Parts finish. - Gutter and downspouts. - Power supply and lighting - signaling the site.