Call +44 800 9755 164

Public tenders for construction in Aartselaar Belgium

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published November 23, 2016  -  Deadline January 20, 2017
Construction of waste water

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published November 30, 2016  -  Deadline December 2, 2016
Construction of waste water

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published December 2, 2016  -  Deadline January 20, 2017
Construction of waste water

Consultative engineering and construction services

Aquafin NV | Published November 15, 2016  -  Deadline December 21, 2016

Project 22325 - brief renovation WWTP Roeselare - (for) design, guidance descriptor award, pipe work including the launch of WWTP till provisional acceptance, site supervision during construction and startup, support delivery file to Aqua Finnish customers, supporting aftercare and guarantee till final acceptance..

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published November 12, 2016  -  Deadline December 22, 2016

Project 22,593 / 1 (1498.6-22.593-W213087-R000964) - Torhout, connection Koddaardstraat - Bollestraat + project on 96 572 22 140

This task includes in particular:

- Breaking up of existing roads, sewers and accessories,

- Construction of sewers in open trench, from Ø 200 to Ø 1200 mm overall length 9426 m and sewer connections,

- Construction of sewers in open trench, sleeve section 1500 x 800, total length 140 m and sewer connections,

- Construction of sewers in open trench, from elliptical tubing 1950 x 1150, total length 31 m and sewer connections,

- Construction of oil by 700 mm, total length 72 m,

- Construction of pressure pipeline in open trench, ou 110 mm, total length 892 m,

- Construction of pressure pipeline in open trench, ou 125 mm, total length 407 m,

- Construction of pressure drainage, ou 63 mm, total length 848 m,

- Construction of five pumping stations, 3 overflows and adapt existing overflow,

- Construction of a new buffer basin and canals,

- Construction under foundations and foundations,

- Linear elements in precast concrete and concrete made on site,

- Pavements in cement concrete pavements, bituminous surfacing and paving.

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published October 26, 2016  -  Deadline December 2, 2016

OLN3003-GEL3019 - Olen & Yellow, constructing sewers, bicycle paths and structural maintenance N13 - Geelseweg / Herentalseweg.

- The construction of a DWA sewage along the N13 - Geelseweg / Herentalseweg, P. Van Lommel Street, Point Street, St Sebastian Street, Canal Street and Lammerdries.

- The construction of a piping in open trench.

- The construction of pumping stations with emergency spillway to the RWA drains.

- The construction of pump units.

- The construction of long canals with kopmuren along the N13

- The costs of demolition and reconstruction of the bike paths along the N13 in cemenbetonverharding.

- The structural maintenance of the regional road N13 with new foundations and asphalt pavement.

- Redesigning entrances between roadway and bike path.

- Preparing the work, breaking up the existing sewers, cleaning of existing drains.

- Breaking up of pavements and preparatory work.

- Harvesting of trees and hedges.

- Planting of trees and green spaces.

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published November 2, 2016  -  Deadline December 9, 2016

Project 22 254/11 - Grimbergen, Strombeek disconnection phase 1 (AQF) and municipal projects (phase A and phase B):

- Scarifiying work roads,

- Earthworks (embankments, excavation, cover and excavation)

- Drainage works in open trench in concrete (reinforced and unreinforced concrete)

- Special foundation engineering (grouting, sheet piles, gravel cores, wooden poles)

- Making press under A12

- Making HA open slot (dia 160, PVC)

- Making works of art in open pit,

- Creating buffer basins in open pit in reinforced concrete,

- Sewer renovation using TUB,

- Check valves and valves,

- Recovery superstructure,

- Laying of paving asphalt,

- Construction of hardening concrete pavers,

- Construction of concrete curbs, edging strips in dark color,

- Construction of cobblestone pavement from breaking up,

- Construction of cobblestone pavement from breaking up with end face to be cut,

- Construction of new cobbled pavement (and sawn end face)

- Construction of bus platforms,

- Construction of elevator,

- Construction of sanitary block,

- Installation of street furniture (benches, bicycle racks, tree rings and anti-parking poles.

Foul-water piping construction work

Aquafin NV — Directie Infrastructuur | Published November 15, 2016  -  Deadline December 22, 2016

Project 21 470/1 (BRN3008) - Beernem, connection Oostveld-Pluime-Zeldonk.

Description of work:

- Sewer di di 200 till 900, depth class to 3 <H <= 4 m Total 7914 lm..

- Prefabricated reinforced concrete tube in 1200 x 600, depth class to 1 <H <= 2 m Total 96 lm..

- Discharge open trench PE100 PN10 SDR11 de110. Total 12 lm.

- Discharge open trench PE100 PN10 SDR11 DE160. A total of 958 lm.

- Pressure sewerage PE100 PN10 SDR11 DE63. Total 2989 lm.

- Pressure sewerage PE100 PN10 SDR11 DE75. A total of 630 lm.

- Installation of 30 pump units for pressure drainage.

- Profiling watercourses. A total of 962 lm.

- 46 structures in reinforced concrete, including 2 stations, 1 booster pumping station, two inflow / outflow constructions and 41 kopmuren.

- House connections.

- Disconnection Working on private plots.

- Reconstruction of roads.

- Green Construction.

Project 21 667/1 (229 351) - Willebroek, construction and startup of a KWZI Klein Willebroek

Aquafin NV - Directie Infrastructuur | Published October 24, 2016  -  Deadline December 2, 2016
Project 21 667/1 (229 351) - Willebroek, construction and startup KWZI Klein Willebroek West situated along Antwerpsesteenweg without number to 2830 Willebroek (Klein Willebroek)

Project 20 685/1 - Herzele, KWZI Sint-Lievens-Esse - Construction work

Aquafin NV - Directie Infrastructuur | Published November 8, 2016  -  Deadline December 16, 2016

Project 20 685/1 - Herzele, KWZI Sint-Lievens-Esse

Engineering works construction KWZI

Delivery, installation, testing and startup of the plant

The contract mainly includes:

The construction of a sewage treatment plant with establishing

a influentpompput

a fine grid

a selector tank

a circulation reactor with bubble aeration

a sedimentation tank

a sludge recirculation chamber

a slibindikbuffer

a service building

an HV cabin

Project 21 910/1 - Duffel WWTP Renovation, construction and electromechanical works part WWTP

Aquafin NV - Directie Asset Management | Published November 8, 2016  -  Deadline December 20, 2016

Project 21 910/1 - STP Duffel, Lot 1 - construction and electromechanical works part WWTP

Building, renovating and starting a sewage treatment plant STP Duffel located

Duffel along the Hondiuslaan.

Cutlery number: 21 910 - Construction work + Electromechanical works part WWTP.

The totality of the works will be awarded in two lots or auctions:

Lot 1: Architectural works and electromechanical works part WWTP

Lot 2: Electromechanical works aeration and mixing

This specification relates to Lot 1: Architectural works and electromechanical works part WWTP

The contract mainly includes:

building a new influentgemaal, grid installation, selector tank, aeration basins, clarifiers, effluent and SWA Consort, effluent Venturi, sludge thickener, space for sludge pumps and workshop facilities for collecting rainwater (wadi) and adjustments to regenbezinktank, defosfatatietank, service building (incl. electricity), water courses, as well as degradation of the sludge drying beds, for fermentation, pavements, grid installation, grit chamber, trickling filters, voorbezinktank, sedimentation tank, effluent and SWA consort, effluent venturi.

There should also be carried out over the entire infrastructure location.

Project 20 747/1 (221 047) - Heuvelland, construction and startup of a local purification to Wijtschate

Aquafin NV - Directie Asset Management | Published October 28, 2016  -  Deadline December 9, 2016

Project 20 747/1 (221 047) - Collines, build and installation of a local purification to Wytschaete located along the Ieperstraat to 8953 to hills.

Cutlery number: 20 747 - Construction work + Electromechanical

The contract mainly includes:

Building a local treatment for 1,200 IU comprising:

* A service building containing the low voltage control

and sanitary facilities

* A prefabricated high-voltage cabin

* A channel grid with fine grid and corresponding screenings press

* A biological treatment consisting of aeration and nabezinkingsbekken with necessary peripherals

* A indikbuffer peripherals

* Infrastructure including roads, fence, gate and lights

OLN3003-GEL3019 - Olen & Yellow, constructing sewers, bicycle paths and structural maintenance N13 - Geelseweg / Herentalseweg, etc.

Aquafin NV - Directie Infrastructuur | Published October 21, 2016  -  Deadline December 2, 2016

OLN3003-GEL3019 - Olen & Yellow, constructing sewers, bicycle paths and structural maintenance N13 - Geelseweg / Herentalseweg

• The construction of a DWA sewage along the N13 - Geelseweg / Herentalseweg, P. Van Lommel Street, Point Street, St Sebastian Street, Canal Street and Lammerdries.

• The construction of a piping in open trench.

Construction of pump stations with emergency spillway to the RWA drains.

Construction of pump units.

• The construction of long canals with kopmuren along the N13

• The costs of demolition and reconstruction of the bike paths along the N13 in cemenbetonverharding.

• The structural maintenance of the regional road N13 with new foundations and asphalt pavement.

• Reconstruction entrances between roadway and bike path.

• Preparation of the work, breaking up the existing sewers, cleaning of existing drains.

• scarifiying of pavements and preparatory work.

• Harvesting of trees and hedges.

• Planting trees and green spaces.

Project 22 561/1 (project Sweco 271 363.) - Damme, Fundraising Ring Oostkerke

Aquafin NV - Directie Infrastructuur | Published November 2, 2016  -  Deadline December 9, 2016

Project 22 561/1 (project Sweco 271 363.) - Damme, Fundraising Ring Oostkerke

- Construction gravity drainage

- Construction of pressure pipeline pumping stations +

- Construction overflow structures

- Repair / renew superstructure

Project 99,243 / 1 (44 / 03,017) - Zemst, paving and drainage works Collector Schom

Aquafin NV - Directie Infrastructuur | Published November 9, 2016  -  Deadline December 16, 2016

Project 99,243 / 1 (44 / 03,017) - Zemst, paving and drainage works Collector Schom

- Preparatory work

- Scarifiying work

- Earthworks

- Construction DWA sewage:

- Construction RWA leadership:

- Reprofiling existing canals (locally beschoeid)

- Construction of buffer basin

- Construction of pumping station, overflow and artwork

- Construction of roads in asphalt and concrete paving

- Construction of bicycle path in asphalt

Project 22 300/1 - Deinze, remediation mouse hole

Aquafin NV - Directie Infrastructuur | Published November 9, 2016  -  Deadline December 16, 2016

Project 22 300/1 - Deinze, remediation mouse hole

The project involves the construction of a separate sewer system in the Beekstraat, Karmstraat, Patersstraat, Heritage Avenue and Astene-Lindenstraat, including renovation superstructure of these roads. The DWA system consists of both gravity pipelines and also of a discharge pipe. The RWA system consists of pipes.

The project is also a pressing under the railways, the construction of a pumping station, the construction of booster pumping stations, construction of overflow structures and building includes a weir structure and several kopmuren.

Project 21 647/1 (P.004106) - Linter / Zoutleeuw - VBR Orsmaal

Aquafin NV - Directie Infrastructuur | Published November 9, 2016  -  Deadline December 16, 2016

Project 21 647/1 (P.004106) - Linter / Zoutleeuw - VBR Orsmaal

The construction of a sewage system.

The installation of sheet piles and secant pile

All the ground work necessary to achieve the prescribed longitudinal and transverse profiles.

The construction of water ditches, side strips and curbs.

The construction of a foundation in broken materials, cement.

The construction of a hardening cement concrete, bituminous products, concrete pavers, cobblestones returnable

The footpaths.

The construction of driveways.

Green construction.

The installation of a discharge pipe.

The construction of a pumping station at the BBB

Building a bergbezinkingsbekken with an overflow

Building an overflow.

The execution of a through pressing

The execution of a directional drilling

Project 22,593 / 1 (1498.6-22.593-W213087-R000964) - Torhout, connection Koddaardstraat-Bollestraat + project on 96 572 22 140

Aquafin NV - Directie Infrastructuur | Published November 9, 2016  -  Deadline December 22, 2016

Project 22,593 / 1 (1498.6-22.593-W213087-R000964) - Torhout, connection Koddaardstraat - Bollestraat + project on 96 572 22 140

This task includes in particular:

• scarifiying of existing roads, sewers and accessories

construction of sewers in open trench, from Ø200 to Ø1200mm total length 9.426m and sewer connections

construction of sewers in open trench, sleeve section 1500 x 800, total length 140m and sewer connections

construction of sewers in open trench, of elliptical tubes 1950x1150, total length 31m and sewer connections

construction of jacking Ø700mm, total length 72m

construction of pressure pipeline in open trench, Øu110mm, total length 892m

construction of pressure pipeline in open trench, Øu125mm, total length 407m

construction of pressure drainage, Øu63mm, total length 848m

Construction of five pumping stations, 3 overflows and modify existing overflow

construction of a new buffer basin and canals

construction of foundations and foundations under

• linear elements in pre-cast concrete, and manufactured concrete on the spot

• pavements in cement concrete pavements, bituminous surfacing and pavements

Project 22.405B / 1 (P.001715) - Beringen, optimizing supply to North WWTP Koersel

Aquafin NV - Directie Infrastructuur | Published November 15, 2016  -  Deadline December 22, 2016

Project 22.405B / 1 (P.001715) - Beringen, optimizing supply to North WWTP Koersel

SUMMARY DESCRIPTION JOB:

- Archaeological research.

- The construction of a sewage system.

- All the ground work necessary to achieve the prescribed length

and cross sections.

- The construction of water ditches, side strips and curbs.

- The construction of a foundation in broken materials, cement.

- The construction of a pavement in bituminous products, concrete pavers.

- The construction of a bike path.

- The construction of footpaths.

- The construction of driveways.

- Green Construction.

- Establishment of a discharge pipe.

- The construction of a pumping station with bergbezinkingsbekken, beschoeid through

soilmixwand with anchors and fitted with tension piles.

- Restoring surfacing above the sewer slots.

- Adjusting and repairing embankments and house entrances.

- Building overflows and sumps.

- Construction of canals

Project 22.405B / 1 (P.001715) - Beringen, optimizing supply to North WWTP

Aquafin NV - Directie Infrastructuur | Published November 15, 2016  -  Deadline December 22, 2016

Project 22.405B / 1 (P.001715) - Beringen, optimizing supply to North WWTP Koersel

SUMMARY DESCRIPTION JOB:

- Archaeological research.

- The construction of a sewage system.

- All the ground work necessary to achieve the prescribed longitudinal and transverse profiles.

- The construction of water ditches, side strips and curbs.

- The construction of a foundation in broken materials, cement.

- The construction of a pavement in bituminous products, concrete pavers.

- The construction of a bike path.

- The construction of footpaths.

- The construction of driveways.

- Green Construction.

- Establishment of a discharge pipe.

- The construction of a pumping station with bergbezinkingsbekken, beschoeid through

soilmixwand with anchors and fitted with tension piles.

- Restoring surfacing above the sewer slots.

- Adjusting and repairing embankments and house entrances.

- Building overflows and sumps.

- Construction of canals