Call +44 800 9755 164

Public tenders for construction in Vienna Austria

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Magistrat der Stadt Wien – Magistratsabteilung 28 | Published February 18, 2017
cpvs
45000000

construction work

Construction work

Austrian Power Grid AG | Published February 28, 2017  -  Deadline March 14, 2017
cpvs
45000000

Construction of a new transformer foundation, Geländeanschüttungen and soil improvement.

Construction work

WIGEBA Wiener Gemeindewohnungs Baugesellschaft m.b.H. | Published February 9, 2017  -  Deadline March 9, 2017
cpvs
45000000, 45200000, 71000000, 50700000, 50800000

General contractor for construction of a housing complex consisting of 120 residential units in the Fontana street. More details are provided in the Terms and tender documents.

On the property EZ 3556 of the land register 01105 Oberlaa city consisting of the plot 2010/5 (Plot 2) with the property address Fontana Straße 1, 1100 Wien, a residential complex to be built with a total of 120 residential units. The aim of the subject procurement procedure is to construct a new building to the specifications of AG. The construction should be done by a Generalunternhmer. This based on the approved permit application and detailed planning. Other required planning services will have to provide in their own company the contractor. These include in particular services from today's perspective the implementation and assembly planning, if necessary, in particular in the areas of building services, building physics, fire protection and surveying services, services of supervision, official ballots and all other necessary control, planning and consulting services. At present is still under consideration, and if so to what extent the contractor is awarded for the period following the construction of the building or after the warranty period with the maintenance and repair of technical equipment. These services are to be optionally instructed optional. From today's perspective the start of construction for the construction of the building will take place at the new location in the summer 2017th The start of the contract is therefore provided from today's perspective 06/01/2017; a displacement of the contract start forward or backward is possible. More details are provided in the Terms and tender documents.

Coordination of construction of MA 33

Magistrat der Stadt Wien - Magistratsabteilung 33 | Published January 22, 2017
cpvs
71300000, 40003850, 40009710, 00276730

Coordination of construction of MA 33

Construction work

Magistrat der Stadt Wien – Magistratsabteilung 34 | Published February 18, 2017  -  Deadline March 9, 2017
cpvs
45000000

Metallbauarbeiten and constructive steel construction.

Engineering works and construction works

Wiener Linien GmbH & Co. KG | Published February 28, 2017  -  Deadline April 7, 2017
cpvs
45220000, 45111100

Demolition and construction work.

Construction supervision services

Volkstheater Ges.m.b.H. | Published January 18, 2017  -  Deadline March 6, 2017
cpvs
71520000

Object of the procurement process are benefits for local construction pertaining to the rejuvenation of the Volkstheater, Neustiftgasse 1, 1070 Wien.

Object of the procurement process are benefits for local construction incl. Technical ÖBA and site coordination of the renovation of the Volkstheater, Neustiftgasse 1, 1070 Wien.

Building construction work

Bundesimmobiliengesellschaft m.b.H. | Published February 4, 2017
cpvs
45210000

2602 Blumau-Neurißhof, firing range of EKO Cobra, new construction and renovation - construction.

Shooting Blumau-Neurißhof, building construction work.

Building construction work

ÖBB-Infrastruktur AG | Published January 28, 2017  -  Deadline March 9, 2017
cpvs
45210000, 45331000, 45233120

Converted Bahnhof Tulln, construction, part-GU; Modification of the existing station building and construction of a traffic station; Baumeisterarbeiten, Professionistenleistungen, home automation, Straßebau for station forecourts.

Converted Bahnhof Tulln, construction, part-GU.

Construction work

Magistrat der Stadt Wien – Magistratsabteilung 34 | Published February 24, 2017  -  Deadline March 24, 2017
cpvs
45000000, 66000000, 98000000, 90000000, 50000000

With the present project of the Campus Nord station to be built in 1020 Vienna to campus + concept of Vienna. The training device comprises a 16-group nursery garden, a 22--class all-day elementary school, a 20--class all-day new middle school, 2 classes Middle school, 2 Special Needs Education Facilities and 2 Special Education Intensive educational spaces including therapy area, Dreifachturnhalle and 2 gyms. For assignment reaches a PPP contract, the content of which is the further planning (implementation and detailed planning), the construction, financing and available entertainment and supplementary services for a period of at least 25 years from completion work.

Construction work

Magistrat der Stadt Wien – Magistratsabteilung 34 | Published February 3, 2017  -  Deadline March 7, 2017
cpvs
45000000, 71322000

School extensions / annex "HORSE 2018 ', contractor performance - planning and construction of educational buildings in prefabricated construction on concrete foundations in connection of existing buildings.

Motorway construction works

ASFINAG Autobahnen- und Schnellstraßen-Finanzierungs-AG | Published February 9, 2017  -  Deadline March 6, 2017
cpvs
45233110, 45221247

A02 motorway, Haberberg and Kollmann Tunnel - AB 269-273 km - construction and E & M - STSG Compliance manufacture / refurbishment.

Partial power construction.

Partial power EM.

Motorway construction works

ASFINAG Bau Management GmbH | Published February 22, 2017
cpvs
45233110

A7 Mühlkreis motorway, section Voest Bridge (AST Hafenstraße node Urfahr) remediation Voest bridge.

Works for the construction, new construction and renovation.

Bypass bridges, ramp linings, retaining structures, ramp terminals, flying junction, widening and refurbishment Port Road bridge incl. AST Hafenstraße and existing Voest bridge.

Building construction work

Bundesimmobiliengesellschaft m.b.H. | Published February 10, 2017  -  Deadline March 6, 2017
cpvs
45210000

Expansion and renovation / 3 phases, approximately 12 202 m 2 NGF - Baumeisterarbeiten.

Renovation and expansion College of Education and Training Institute for elementary education - construction work.

Motorway construction works

ASFINAG Autobahnen- und Schnellstraßen-Finanzierungs-AG | Published February 14, 2017  -  Deadline March 10, 2017
cpvs
45233110, 45221247

A02 motorway Gräberntunnel - AB 243-246 km - Construction & E & M - manufacture / refurbishment STSG conformity.

Partial offer partial service BAU.

Partial offer partial power EM.

Motorway construction works

ASFINAG Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published February 21, 2017  -  Deadline March 13, 2017
cpvs
45233110, 45221247

A02 motorway tunnel Donnersberg - AB 265-268 km - Construction & E & M - STSG conformity manufacture / refurbishment.

Partial offer partial service BAU.

Partial offer partial power EM.

Test System - Business Directory for track maintenance department railway construction - B63; Vienna

WIENER LINIEN GmbH & Co KG | Published March 5, 2015  -  Deadline March 19, 2018
cpvs
17909630, 45234116

track construction works

Architectural, construction, engineering and inspection services

WIGEBA Wiener Gemeindewohnungs Baugesellschaft m.b.H. | Published February 22, 2017  -  Deadline March 20, 2017
cpvs
71000000

Provision of design services for the construction of a residential building 1020 Vienna, Handelskai 214th

Construction of the new Campus Atzgersdorf, 1230 Wien

Magistrat der Stadt Wien - Magistratsabteilung 19 | Published February 26, 2017
cpvs
67656690, 71220000

Subject of the negotiation process is the allocation of general planning services for the construction of a holistic, integrative educational institution (Campus) in Vienna 23, construction of the new Campus Atzgersdorf

Industrial units construction work

Wien Energie GmbH | Published February 2, 2017  -  Deadline March 16, 2017
cpvs
45213251

Within the project Simmeringer Haide sludge incineration an agreement on the adjustment of the fuel feeding the fluidized bed should be 1 and 3 closed.

This performance mainly comprises:

- Connecting the air wells secondary and primary air (WSO 1 and 2);

- Connection of the air intakes secondary and primary air (WSO 3);

- Piping of the air extraction between WSO1-air fountain and WSO3 and 4 incl YEARS exhaust fans;..

- Mixing of thick sludge, dry material, Altkoks and waste oils;

- Crushing and object to the WSO1 and WSO3;

- Adaptation and new construction of platforms in the field of furnaces;

- Adaptation of the pipe bridges and new construction of pipe bridges for

- Air, mud and Koksleitungen;

- Adaptation of coke and used oil lines;

- Equipment for the boiler preservatives.