Call +44 800 9755 164

Public tenders for construction in Austria

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Stadt Wien – Wiener Wohnen | Published November 30, 2016  -  Deadline December 13, 2016
construction work

Track construction works

Wiener Linien GmbH & Co. KG | Published November 25, 2016  -  Deadline December 20, 2016
track construction works

Construction work

Allgemein Öffentliches Krankenhaus „St. Vinzenz“ Zams Betriebs GmbH | Published December 7, 2016  -  Deadline December 21, 2016

Construction in the area earthworks, excavation and excavation support.

Construction work

Gerscha RechtsanwaltsGmbH | Published November 11, 2016  -  Deadline December 12, 2016

Construction of subsidized housing and communal buildings as total contractor.

Construction work

Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published November 11, 2016  -  Deadline December 1, 2016

Construction General renovation of the section node Schwechat to Ast. Airport.

Construction work

Konvent der Barmherzigen Brüder als Rechtsträger des Krankenhauses der Barmherzigen Brüder in Graz | Published December 9, 2016  -  Deadline January 13, 2017

Baumeisterarbeiten Total incl. Demolition work, special foundations, drywall work and precast facades for the new construction and renovation in the Brothers of Charity Hospital in Graz, Marshal Gasse 12.

Construction work

Gemeinde Höchst | Published December 7, 2016  -  Deadline January 16, 2017

Grounds (special construction, builder and gardener) for VS maximum Unterdorf.

Construction work

Marktgemeinde Großarl | Published December 7, 2016  -  Deadline January 12, 2017

Bildungszentrum Großarl - New elementary school, metal construction.

Construction work

Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published December 2, 2016  -  Deadline January 23, 2017

To facilitate the daily traffic assignment from the direction of traffic in both tubes to the oncoming traffic in the west tunnel or minimize the daily expenses for the existing central reservation crossings north and south will be renovated and median transfer systems (MÜLS) retrofitted. The system should also be used for diversions after the construction phase.

Construction work

Patscherkofelbahn Infrastruktur GmbH | Published December 9, 2016  -  Deadline January 23, 2017

Ausschreibungsgegenständlich are Schwarzdecker- and plumbing works for the construction of 10 EUB Patscherkofelbahn. This is a lot (activity) of a works contract (§ 4 BVergG 2006).

Insulation work on the flat roofs of the valley, intermediate and top station. Verblechungsarbeiten a limited extent in relation to the sealing work, eg. B. Attikaverblechungen, wall high trains u. Ä.

Construction supervision services

Autobahnen- und Schnellstraßen-Finanzierungs-AG | Published November 25, 2016  -  Deadline December 7, 2016

UFT Kreuzer Area & UFT beggar Cross, DL / Site supervision - construction.

Road construction works

ASFINAG Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published November 25, 2016  -  Deadline January 17, 2017

The subject construction project essentially comprises the preparation of the construction road for the project properties on the S 7 Fürstenfelder expressway section West, from node A 2 South motorway / S 7 Fürstenfelder expressway to the tunnel Rudersdorf at S 7-km approx 11.70. Additionally still the site access terminal A 2, Großwilfersdorf East and the access Lafnitztal build. In the L 401 is the ÖBB route traversed (line Fehring -Friedberg). To establish a continuity of the construction road of the A 2 until Baulos tunnel Rudersdorf a temporary bridge over the Lafnitz (in the range of S7.21 Bridge over the Lafnitz) is required.

The subject construction project essentially comprises the preparation of the construction road for the project properties on the S 7 Fürstenfelder expressway section West, from node A 2 South motorway / S 7 Fürstenfelder expressway to the tunnel Rudersdorf at S 7-km ca.11,70. Additionally still the site access terminal A 2, Großwilfersdorf East and the access Lafnitztal build. In the L 401 is the ÖBB route traversed (line Fehring - Friedberg). To establish a continuity of the construction road of the A 2 until Baulos tunnel Rudersdorf a temporary bridge over the Lafnitz (in the range of S7.21 Bridge over the Lafnitz) is required.

Construction work

Magistrat der Stadt Wien – Magistratsabteilung 34 | Published December 1, 2016
MA 34 - 958007-2016, Vienna 2, Engert Road 216 ident Vorgartenstraße 223C, construction of a new fire station.

Pipelaying construction work

Netz Niederösterreich GmbH | Published November 17, 2016  -  Deadline December 14, 2016

Framework Agreement on the laying of pipelines (without earth and construction work, with pipes provided by the customer) in Lower Austria (3 lots).

Proposals are subject Rahmenvereibunrungen (3 independent ones) on new installations, refurbishment and testing of pipes made of steel, stainless steel and plastic in the coverage area of ​​the EVN Group. The media include water and gas pipes, located both in operation (refurbishment, disorder, integration) and inoperative located (new building). The troubleshooting and the preparation of house connections are important performance range.

Building construction work

Bundesimmobiliengesellschaft mbH vertreten durch Unternehmensbereich Schulen | Published November 12, 2016  -  Deadline January 18, 2017

6020 Innsbruck, Weinhart Straße 4, HLW school and boarding building, extension and renovation, construction work.

Building construction work

Österreichischer Rundfunk (ORF) | Published November 22, 2016  -  Deadline December 22, 2016

Restoration media location ORF - Property 2 - 200.2 Partial contracting construction.

Railway tunnel construction work

Brenner Basistunnel BBT SE | Published December 9, 2016  -  Deadline April 18, 2017

With the present process, the construction establishing a construction lot H51 "Pfons burner" to be performed on Austrian project area of ​​the Brenner Base Tunnel BBT, advertised.

on - - With the present process, the construction establishing a construction lot H51 "Pfons burner", are Austrian project area of ​​the Brenner Base Tunnel BBT advertised.

Construction supervision services

Landeskrankenanstalten-Betriebsgesellschaft – KABEG | Published December 6, 2016  -  Deadline January 23, 2017

Project management gem. BauKG with planning and construction coordination.

Tramline construction works

Innsbrucker Verkehrsbetriebe und Stubaitalbahn GmbH | Published November 17, 2016  -  Deadline December 12, 2016

Works for tram / local train; Track construction and earth-constructional, concrete, Steinverlege-, Asphaltierungs-, Kabeltiefbau- and drainage works in the section Sonnpark.

Building construction work

Bundesimmobiliengesellschaft m.b.H. | Published November 25, 2016

3184 Türnitz, Auhofstraße 41, CPR, new school and boarding tract and stock restoration - construction.

CPR, new school and boarding tract and renovations such - works.