Public tenders for asphalting in Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Paving and asphalting works

Gmina Sosnowiec | Published May 27, 2016  -  Deadline June 3, 2016
cpvs
45233222, 45233223, 71000000

Construction work Paving and asphalting

Asphalting of municipal roads in seven towns municipalities Sanok.

 | Published June 17, 2014  -  Deadline July 3, 2014
cpvs
45233000

The contract is the realization of the task called. / Asphalting of municipal roads in seven towns Villages Sanok /, to the extent consistent with the bill of quantities. The planned works include the renovation of roads in such areas as blowdown trenches, making the base and the surface of the mineral-bituminous mixtures ..

Asphalting of municipal roads in the Municipality of Zakliczyn - tasks performed partly by the Fund Solecki.

 | Published January 10, 2014  -  Deadline January 27, 2014
cpvs
45233222

8.1) Asphalting of the municipal road in the town of Rostock (G44) at 440 m in length including the Fund Solecki 55 mb - profiling Verge - covering the equalization of bituminous mix - making the wearing of a mixture of bitumen - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.2) Asphalting of the municipal road in the town of Paleśnica (G13) at 500 mb length including the Fund Solecki 90 mb - covering the equalization of bituminous mix - making the wearing of a mixture of bitumen - UP WITH Verge of a single sprinkling aggregate asphalt emulsion - Treatment ditches with namułu 8.3) Asphalting of the municipal road in the town of Guardians (W157) for L 285 mb including the Fund Solecki 75 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.4 ) Asphalting of the municipal road in the town of Ruda Chamber (G46; W112) for L 250 mb including the Fund Solecki 50 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.5) Asphalting of the municipal road in the town of sorrow Will (G57, G58) at 450 mb length including the Fund Solecki 70 mb - covering the equalization of bituminous mix - making the wearing of a mixture of bitumen - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.6 ) Asphalting of the municipal road in the town of Wesołów (W188) for L 325 mb including the Fund Solecki 70 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.7) Asphalting of the municipal road in m Zakliczyn ul. Marshy (G78.2) for L 250 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.8) Asphalting of the municipal road in the town of Charzewice (W229) at 210 m in length including the Fund Solecki 60 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.9) Asphalting of the municipal road in the town of Zawada Lanckoronska (G84) at 375 m in length including under Solecki Fund 60 mb - covering the equalization of bituminous mix - making the wearing of a mixture of bitumen - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.10) Asphalting of the municipal road in the town of Filipowice (W168) for L 420 mb including the Fund Solecki 90 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.11) Asphalting of the municipal road in the town of Faściszowa (W52) in the 360 ​​meter length including the Fund Solecki 80 mb - execution of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.12) Asphalting of the municipal road in the town of Jamna (W75) in the 160 meter length including the Fund Solecki 30 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.13) Asphalting of the municipal road in the town of Gwoździec (G28) at 250 m in length including the Fund Solecki 55 mb - made of crushed aggregate base course - carrying the surface of mix asphalt - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.14) Asphalting of the municipal road in the town of Lusławice to Matłaszka (W227) for L 85 mb including the Fund Solecki 40 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single sprinkling aggregate asphalt emulsion 8.15) Asphalting of the municipal road in the town of Lusławice to Gaca (W228) for L 85 mb wmw Solecki Fund 40 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge aggregate once sprinkling of asphalt emulsion 8.16) Asphalting of the municipal road in the town of Lusławice to Plums (W09) for L 160 mb including the Fund Solecki 48 mb - made of crushed aggregate base course - carrying the surface of asphalt mixtures - UP WITH Verge of a single aggregate sprinkling asphalt emulsion 8.17) Asphalting of the municipal road in the town of Olszowa (W74) for the length of 400 m including the Fund Solecki 85 mb - covering the equalization of bituminous mix - making the wearing of a mixture of bitumen - aggregate UP WITH Verge of a single emulsion sprinkling asphalt 8.18) Asphalting of the municipal road in the town of Zakliczyn ul. The garden (G75) at 340 mb length - making the base of krus

Zakliczyn: Asphalting municipal roads in the commune Zakliczyn - tasks performed partly within the hamlet fund phase III

Gmina Zakliczyn | Published September 16, 2016  -  Deadline September 14, 2016
Winner
Przedsiębiorstwo Robót Drogowo -Mostowych S.A, ul. Jagodowa 55, 33-310 Nowy Sącz, kraj/woj. małopolskie.
cpvs
45233222

The contract works are in the range of asphalting of municipal roads in the Municipality of Zakliczyn m Faliszowice, Lesser Poland Voivodeship Wróblowice and Lusławice scope of work includes Asphalting local road in the village Lusławice way W14 length of 200 mb Asphalting local road in the village Faliszowice, Lesser Poland Voivodeship road in the 326 length of 110 mb Asphalting local road in the village Wróblowice road 29 length of 280 m including the fund Solecki 100 mb detailed order determines the bill of quantities and the detailed technical specifications of performance and acceptance of works annexed to this Terms of Reference hereinafter referred to as the Terms of Reference Annex No. 9 and No. 10.

Zakliczyn: Asphalting municipal roads in the commune Zakliczyn - tasks performed partly within the hamlet fund phase III

Gmina Zakliczyn | Published July 27, 2016  -  Deadline October 18, 2016
cpvs
45233222

The contract works are in the range of asphalting of municipal roads in the Municipality in Zakliczyn m. Faliszowice, Lesser Poland Voivodeship, Wróblowice and Lusławice. The scope of works includes: Asphalting local road in the village Lusławice way W14 - length of 200 mb Asphalting local road in the village Faliszowice, Lesser Poland Voivodeship road in 326 - length of 110 mb Asphalting local road in the village Wróblowice road 29 - length of 280 m in the Fund Solecki 100 mb detailed order determines the bill of quantities and the detailed technical specifications of performance and acceptance of construction works, which are attached to this Terms of Reference, hereinafter SIWZzałącznik No. 9 and No. 10.

Supply of mineral-bituminous hot-asphalting municipal roads and internal Commune New Wiśnicz.

 | Published October 24, 2014  -  Deadline November 3, 2014
cpvs
44113600

The contract is for the supply of mineral-bituminous hot road asphalting of internal municipal and commune New Wisnicz the expected amount of 140 tonnes. The detailed scope of the contract was included in the Terms of Reference.

Nowa Wies Lęborska: Repair of commune roads in the municipality Nowa Wies Leborska - asphalting

Gminny Zakład Usług Komunalnych | Published July 14, 2016  -  Deadline July 14, 2016
Winner
Konsorcjum Firm: Kruszywo Sp. z o.o. Bituminium Sp. z o.o., ul. Długa 4B, 84-223 Linia, kraj/woj. pomorskie.
cpvs
45233142

The contract scope includes: Janowice asphalt surface located on an existing paving stone on the length of 116 m, the road width 4m. (Asphalting the surface 464m2) - wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 3 cm. - Alignment layer - a mixture of mineral-asphalt KR1-2 an average thickness after compaction 3 cm (75 kg / m2). Stocky asphalt surface located on the existing base of crushed stone at length: Episode 1 (plot No. 416) 65m road width 4m (area asphalting 260 m2); Episode 2 (plot 435) 387m, the road width 4m (area of ​​1548 m2 asphalting) - wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. - Equalizing layer-binding - a blend of asphalt with an average thickness KR1-2 the density cm 3 (75 kg / m2). 3. Łebień estate along the road should be laid on one side resistor traffic by site plan and construction section - wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. - Equalizing layer-binding - a blend of asphalt with an average thickness KR1-2 after compaction cm 2 (50 kg / m2). - A layer of crushed aggregate - a blend of mechanically stabilized aggregate 0-31,5 a thickness of 15 cm. Chocielewko asphalt surface located on an existing asphalt surface over a length of 400 m, the road width of 4.0 m (asphalting area of ​​1600 m2. - Wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 3 cm. - Equalizing layer-binding - a blend of mineral-asphalt KR1-2 an average thickness after compaction 3 cm (75 kg / m2). Garczegorze a) asphalt surface located on the foundation of broken aggregate over a length of 100 m, the road width of 3.5 m (area of ​​350 m2 asphalting. - wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 3 cm. - equalizing layer-binding - a mixture of mineral-asphalt KR1-2 an average thickness of 2 cm after compaction (50 kg / m2). - a layer of crushed aggregate - mix mechanically stabilized aggregate 0-31,5 a thickness of 15 cm. b) asphalt surface located on an existing asphalt surface over a length of 300m, the road width adapted to the existing (surface asphalting 1250m2) - wear layer - a mixture of mineral-asphalt KR1-2 having a thickness of 4 cm after compaction. XXX anniversary of the Deconstruction of the existing surface on the surface of 62 m2. - Wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. Leśnice asphalt surface located on an existing asphalt surface over a length of 110 m, the road width of 3.6 m (area of ​​396 m2 asphalting). - Wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 3 cm. - Equalizing layer-binding - a blend of asphalt with an average thickness KR1-2 after compaction cm 2 (50 kg / m2). Pogorszewo asphalt surface located on the foundation of broken aggregate over a length of 165 m, the road width of 4.0 m (area of ​​660 m2 asphalting). - Wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. - Alignment layer - a mixture of mineral-asphalt KR1-2 an average thickness of 2 cm after compaction (50 kg / m2). - A layer of crushed aggregate - a blend of mechanically stabilized aggregate 0-31,5 a thickness of 20 cm. All the wells and the valve cover should be up to the amount of executed pavement. No. 864 Asphalt partially located on the foundation of broken aggregate (189 m2) - wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. - Alignment layer - a mixture of mineral-asphalt KR1-2 an average thickness of 2 cm after compaction (50 kg / m2). - A layer of crushed aggregate - a blend of mechanically stabilized aggregate 0-31,5 a thickness of 15 cm .. and on the existing bituminous pavement (221 m2). - Wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. Surfaces at the congress of the provincial road 214 must be positioned so that no formed stagnant water. Janisławiec asphalt surface located on the surface of the tabloid over a length of 179 m, the road width of 3.5 m (area of ​​635 m2 asphalting). - Wear layer - a mixture of mineral-asphalt KR1-2 thick after compaction 4 cm. - Equalizing layer-binding - a blend of asphalt with an average thickness KR1-2 after compaction cm 2 (50 kg / m2). - Cleansing and supplementing the aggregate broken surfaces with a tabloid in the amount of 10t. - On the section marked on the situational plan (32 m2) further foundation of broken aggregate 0-31,5 15 cm. Locations of all elements of the works are on situational plans for each village. Object of the contract must be in accordance with: the enclosed design documentation

Asphalting of municipal roads.

 | Published January 30, 2014  -  Deadline February 19, 2014
cpvs
45233123, 45233222

1 The contract is for repair and renovation work on five municipal roads. 1) Reconstruction of the municipal road No. 103508L which combines a provincial road No 815 from the county road No. 1553L - Cologne city Niedźwiada the repaired section of road length 1240m, width 5.5 m Follow the new surface of asphalt mixture: the bonding layer 329 t and wear layer with an average thickness of 4 cm, but not less than 3 cm. Execution-sided sidewalk width 150 cm, rebuilding the culvert, earthwork with drainage path, according to the estimate blind and project documentation. 2) Renovation of municipal road No. 103515L from km 0 +000 to km 0 +650 - Spawning city Cologne length of the repaired section of road 650m, width of 5.0 m and a length apron bay 120m, a width of 3.0 m Builders will involve making a new surface of asphalt mixture: the wearing of an average thickness of 4 inches, but not less than 3 cm. 3) Renovation of municipal road No. 103519L from km 0 +000 to km 0 +575 - city Berejów the repaired section of road length 575m, width 5.3 m Builders will involve making a new surface of asphalt mixture: the wearing of an average thickness of 4 inches, but not less than 3 cm. 4) Renovation of municipal road No. 103506L from km 0 +750 to km 1 +600 - city Brzeźnica Principe Cologne length of the repaired section of road 850m, the average width of 4.8 m Builders will involve making a new surface of asphalt mixture: the wearing of an average thickness of 4 inches, but not less than 3 cm. 5) Repair of municipal road without number from km 0 +000 to km 0 +200 - Hill town Lubartowska length of the repaired section of road 200m, width 3.0 m Builders will involve making a new surface of asphalt mixture: the wearing of an average thickness of 4 inches, but not less than 3 cm. The total length of municipal roads covered bituminisation is 3515 m The detailed scope of work specified in the bill of quantities and project documentation.

Asphalt roads in the commune Michaels ..

 | Published August 30, 2013  -  Deadline September 17, 2013
cpvs
45233142

The contract is for: Asphalting of roads in the commune Michaels. 1 Asphalting of the following ways.: - The road to the village Michaels 150m in length; - Road in the town of Zagajów long 450MB; - Asphalting the parking lot at the cemetery in the Michaels; - The road to the village Pawlowice long 170MB; - Road in the town of Pawlowice 60mb length, - Repair of partial asphalt roads in the commune Michaels. Construction works are the subject of this contract were specified in the technical documentation that is the basis for the execution of the works, which are annexed hereto (the construction project, the technical execution and delivery of the works). The work necessary to take into account the accompanying such as: a) the organization and protection of the site, b) the ordering of the land and restore it to its original state. Contractor is obliged to make a site visit the site, read the contract and subject to the conclusion of the bid price all costs necessary to properly perform the contract in accordance with the technology works referred to the Polish Standard and Technical Conditions Acceptance of Works. Detailed scope of work specifies the project - for inspection at the registered office ordering ..

Asphalting Square Street. Industrial / 2014.

 | Published July 8, 2014  -  Deadline July 23, 2014
cpvs
45000000, 45223300

1.Przedmiotem order contract is the hardening of the asphalt pavement on the premises of the Internal eco-region Street. Industrial 14 in Bełchatów, in accordance with: 1) structural engineering design and construction, constituting Appendix 1 hereto; 2) geotechnical expertise to indicate the state of the ground, constituting Appendix 2 hereto; 3) cost estimate blind, constituting Appendix 3 hereto; 4) the guidelines Purchaser. 2.Przedmiot contract also includes (in accordance with the technical design construction and building attached hereto as Annex 1 and the instructions of the Purchaser): 1) removal of the existing concrete slab in a place which will be performed paving with asphalt, and their layout - concrete slabs suitable for reuse - in an area designated by the Employer in the Department of Internal eco-region Street. Industrial 14 in Belchatow (the remaining concrete slabs Contractor at his own cost transportation to the disposal site); 2) removal of the concrete structure in place which will be performed paving with asphalt, and her deportation by the Contractor at his own expense to a local recycling; 3) execution of drainage with concrete troughs; 4) perform adequate profiling paved roads in the south, so that flowing water was not getting to objects along roads. 3. In addition to the construction works referred to in paragraphs 1 and 2, the scope of the contract includes the delivery by the Contractor of the following documents in Polish: 1) As-built documentation of the agreement made, taking into account the inventory of geodetic in quantities of 1 pc. In hard copy and 1 pc . in electronic version on CD in PDF format; 2) Approvals, certificates for materials used in paper; 3) Technical approvals ..

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Arkadiusza Chęcińskiego | Published February 22, 2017  -  Deadline March 29, 2017
cpvs
45233222, 45233223, 71000000

1.1. The contract is to modernize the infrastructure bus and tram in Sosnowiec involving the construction and development of small interchanges and connecting cycle paths. Construction of paths

Object of the contract has been divided into 7 parts:

Part I of the contract includes the construction of a bicycle path in the street. Andres May 1, Mościckiego;

Part II of the contract includes the construction of a bicycle path in the street. 3rd of May;

Part III of the contract includes the construction of a bicycle path in the street. Wawel Narutowicz;

Part IV of the contract includes the construction of a bicycle path in the street. Kresowa - Pilsudski;

Part V of the contract includes the construction of a bicycle path in the street. Oil - Church, Zegadłowicza, Jagiellonian;

Part VI of the contract includes the construction of a bicycle path in the street. Grota-Roweckiego, Orla - Zeromskiego;

Part VII of the contract includes the construction of a bicycle path in Al. Mirecki.

A detailed description of the contract Part I - VII constitutes Appendix 3 hereto.

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Arkadiusza Chęcińskiego | Published February 11, 2017  -  Deadline March 22, 2017
cpvs
45233222, 45233223, 71000000

Construction of paths

Object of the contract has been divided into 7 parts:

Andres May 1, Mościckiego;

3rd of May;

Wawel Narutowicz;

Kresowa - Pilsudski;

Oil - Church, Zegadłowicza, Jagiellonian;

Grota-Roweckiego, Orla - Zeromskiego;

Mirecki.

A detailed description of the contract Part I - VII constitutes Appendix 3 hereto.

A detailed description of the contract Part I is attached as Appendix 3 hereto.

A detailed description of the contract Part II constitutes Appendix 3 hereto.

A detailed description of the contract Part III constitutes Appendix 3 hereto.

A detailed description of the contract Part IV constitutes Appendix 3 hereto.

A detailed description of the contract Part V constitutes Appendix 3 hereto.

A detailed description of the contract Part VI constitutes Appendix 3 hereto.

A detailed description of the contract Part VII constitutes Appendix 3 hereto.

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Arkadiusza Chęcińskiego | Published March 24, 2017  -  Deadline April 7, 2017
cpvs
45233222, 45233223, 71000000

1.1. The contract is to modernize the infrastructure bus and tram in Sosnowiec involving the construction and development of small interchanges and connecting cycle paths. Construction of paths

Object of the contract has been divided into 7 parts:

Part I of the contract includes the construction of a bicycle path in the street. Andres May 1, Mościckiego;

Part II of the contract includes the construction of a bicycle path in the street. 3rd of May;

Part III of the contract includes the construction of a bicycle path in the street. Wawel Narutowicz;

Part IV of the contract includes the construction of a bicycle path in the street. Kresowa - Pilsudski;

Part V of the contract includes the construction of a bicycle path in the street. Oil - Church, Zegadłowicza, Jagiellonian;

Part VI of the contract includes the construction of a bicycle path in the street. Grota-Roweckiego, Orla - Zeromskiego;

Part VII of the contract includes the construction of a bicycle path in Al. Mirecki.

A detailed description of the contract Part I - VII constitutes Appendix 3 hereto.

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Pana Arkadiusza Chęcińskiego | Published April 5, 2017  -  Deadline April 21, 2017
cpvs
45233222, 45233223, 71000000

1.1. The contract is the modernization of bus and tram infrastructure in Sosnowiec involving the construction and development of small interchanges and connecting bike paths. The construction of paths

Object of the contract has been divided into 7 parts:

Part I of the contract includes the construction of a bicycle path in the street. Andres, May 1, Mościckiego;

Part II of the contract includes the construction of a bicycle path in the street. 3rd of May;

Part III of the contract includes the construction of a bicycle path in the street. Wawel Castle, Narutowicz;

Part IV of the contract includes the construction of a bicycle path in the street. Borderland - Pilsudski;

Part V of the contract includes the construction of a bicycle path in the street. Oil - Church, Zegadłowicz, Jagiellonian;

Part VI of the contract includes the construction of a bicycle path in the street. Grot-Rowecki Orla - Zeromski;

Part VII of the contract includes the construction of a bicycle path at al. Mirecki.

A detailed description of the contract Part I - VII constitutes Appendix 3 hereto.

Paving and asphalting works

Miasto Łódź – Zarząd Dróg i Transportu | Published June 24, 2016
Winner
Larkbud Sp. z o.o.
cpvs
45233222, 45111200, 45231300, 45110000, 45262330, 45262500, 45262000

In addition, the Employer stresses that equivalent methods, materials, equipment, systems, technologies, etc. Can not provide replacements in relation to the methods, materials, devices, systems, technology, etc. Described in the project documentation and STWiORB through trademarks, patents, origin.

Paving and asphalting works

Miasto Łódź – Zarząd Dróg i Transportu | Published April 9, 2016  -  Deadline May 18, 2016
cpvs
45233222, 45111200, 45231300, 45110000, 45262330, 45262500, 45262000

In addition, the Employer stresses that equivalent methods, materials, equipment, systems, technologies, etc. Can not provide replacements in relation to the methods, materials, devices, systems, technology, etc. Described in the project documentation and STWiORB through trademarks, patents, origin.

Construction Paving and asphalting

Zarząd Dróg Wojewódzkich w Katowicach | Published September 20, 2014  -  Deadline October 7, 2014
cpvs
45233222, 45220000, 45221121, 45233120, 45233220, 45221120

Roboty budowlane w zakresie układania chodników i asfaltowania

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Pana Arkadiusza Chęcińskiego | Published April 15, 2017  -  Deadline April 28, 2017
cpvs
45233222, 45233223, 71000000

1.1. The contract is the modernization of bus and tram infrastructure in Sosnowiec involving the construction and development of small interchanges and connecting bike paths. The construction of paths

Object of the contract has been divided into 7 parts:

Part I of the contract includes the construction of a bicycle path in the street. Andres, May 1, Mościckiego;

Part II of the contract includes the construction of a bicycle path in the street. 3rd of May;

Part III of the contract includes the construction of a bicycle path in the street. Wawel Castle, Narutowicz;

Part IV of the contract includes the construction of a bicycle path in the street. Borderland - Pilsudski;

Part V of the contract includes the construction of a bicycle path in the street. Oil - Church, Zegadłowicz, Jagiellonian;

Part VI of the contract includes the construction of a bicycle path in the street. Grot-Rowecki Orla - Zeromski;

Part VII of the contract includes the construction of a bicycle path at Al. Mirecki.

Detailed description of the ordering of parts I - VII of Annex 3 hereto.

Paving and asphalting works

GMINA SOSNOWIEC – reprezentowana przez Prezydenta Miasta Sosnowca Pana Arkadiusza Chęcińskiego | Published April 25, 2017  -  Deadline May 10, 2017
cpvs
45233222, 45233223, 71000000

1.1. The subject of the contract is the modernization of bus and tram infrastructure in Sosnowiec, consisting in the construction and extension of small interchanges and interconnected cycle paths. Construction of paths

The subject of the order was divided into 7 parts:

Part I of the contract involves the construction of a bicycle path in ul. Andres, 1 Maja, Moscicki;

Part II of the contract covers the construction of a bicycle path in ul. 3rd of May;

Part III of the contract covers the construction of a bicycle path in ul. Wawel, Narutowicza;

Part IV of the contract covers the construction of a bicycle path at ul. Kresowa - Piłsudski;

Part V of the contract covers the construction of a bicycle path at ul. Naftowa - Koscielna, Zegadłowicza, Jagiellońska;

Part VI of the contract covers the construction of a bicycle path at ul. Grota-Rowecki, Orla - Żeromskiego;

Part VII of the contract involves the construction of a bicycle path in Al. Mirecki.

Detailed description of the subject matter of Parts I - VII is annex No. 3 to SIWZ.

Paving and asphalting works

Miasto Łódź – Zarząd Dróg i Transportu | Published April 28, 2017  -  Deadline June 6, 2017
cpvs
45233222

The subject of the order is the repair of sidewalks on public roads located in the city of Lodz and on the internal roads located in areas managed by the City of Łódź in 2017. Divided into 4 divisions, ie:

Region I - area of ​​Łódź-Bałuty district,

District II - area of ​​Łódź-Upper district,

Region III - area of ​​Łódź - Śródmieście - Polesie,

Region IV - area of ​​Łódź-Widzew district.

Detailed description of the subject matter of the order is contained in the Price Forms for Parts 1-4 (2a-2d), Technical Specifications for Construction and Acceptance of Construction Works - Volume III of the SIWZ and in the Act of Contracts - Volume II of the SIWZ.

The subject of the order is the repair of sidewalks on public roads located in the city of Lodz and on the internal roads located in areas managed by the City of Łódź in 2017. - Area I - area of ​​Łódź-Bałuty district.

The scope of the works includes in particular:

- Dismantling the lawn edging

- Disassembly of curbs / concrete resistors

- Disassembling curbs / stone resistors

- Disassembling the sidewalk (concrete pavement)

- Disassembly of concrete pavement

- Disassembling the bituminous pavement

- Disassembling the surface of the stone block

- Disassembling the triline surface irrespective of the type of grouting and ballast

- Substructure (pavement) concrete

- Substructure of broken aggregate

- Substructure of crushed concrete elements, coming from demolition (investor's material) - with transports up to 20.0 km

- Surface made of chamfered concrete, gray or graphite panels 25 x 25 x 8 cm new vibropressed on cement-sand bed

- Surface made of non-bleached concrete panels, graphite color 30 x 30 x 8 cm new vibropressed on cement-sand bed

- Surface made of concrete slab 50 x 50 x 7 cm new vibropressed on cement-sand bed

- 35 x 35 x 5 cm concrete slabs new vibropressed on cement-sand bed

- Surface of the new concrete block irregular gr. 8 cm on cement-sand bed

- New 35mm x 35cm x 5cm Vibrocasted Cone Blade for the blind, cement-sand

- Surface made of polymer concrete panels 30x30x8

12 cm

- Surface made of chamfered gray, gray or graphite panels 25 x 25 x 8 cm with 100% recovery on sand-cement substrate

- Surface made of concrete slabs 50 x 50 x 7 cm with 100% recovery on sand-cement slurry

- 35 x 35 x 5 cm concrete slabs made of 100% recycled concrete and sand

8 cm with 100% recovery on cement and sand bed

- 35 x 35 x 5 cm concrete slabs for blinds with 100% recovery, cement-sand slurry

- Surface made of stone cubes, granite split, flame 15 x 17 cm

- Surface made of stone, granite, slate or split flame 10 x 10 cm

- Surface of stone block, granite slab 4 x 6 cm

- Surface of cobble stone, granite cut, flame 28 x 14 cm of dark gray color on cement sandy slurry or adhesive mortar - elastic

- Stone pavement

- Surface made of slabs of granite cut, flame 50x50x10, gray color on cement sandy substrate

- Surface made of 40 x 80 x 8 cm cut granite slabs, gray color on cement sandy substrate

30 x 8 cm on sand-cement sandwiches, grout filled with mortar

30 x 8 cm 100% recycled on sand-cement sandwiches, grout filled with mortar

- (...) Due to the limitation of the number of characters in the notice form, the Purchaser informs that the full scope of works is contained in Volume I SIWZ.

A detailed description of the subject matter of the order is contained in the Price Form for Part 1 (2a), Technical Specifications for Construction and Acceptance of Construction Works - Volume III of the SIWZ and in the Act of Contracts - Volume II of the SIWZ.

3a of the Employer Act requires the Contractor or subcontractor to employ at least 3 persons on the basis of a contract of employment that will perform the contract performance tasks specified in the price form for lot 1.

The subject of the order is the repair of sidewalks on public roads located in the city of Lodz and on the internal roads located in areas managed by the City of Łódź in 2017. - Division II - area of ​​the Łódź-Upper district.

The scope of the works includes in particular:

- Dismantling the lawn edging

- Disassembly of curbs / concrete resistors

- Disassembling curbs / stone resistors

- Ro

Categories
  Poland - Show all countries
Bieruń (11)Białystok (7)Gniezno (7)Grudziądz (7)Kraków (7)Opole (7)Warszawa (7)Koło (6)Manowo (6)Piaseczno (6)Puławy (6)Wola rębkowska (6)Łuków (6)Łódź (6)Nieporęt (5)Osielsko (5)Poznań (5)Rzeszów (5)Warsaw (5)Wołomin (5)Łęczna (5)Żukowo (5)Biała podlaska (4)Bytów (4)Czarnków (4)Kąty wrocławskie (4)Ostrowiec świętokrzyski (4)Ostrów wielkopolski (4)Sieradz (4)Warsaw (4)Warszawa-ursus (4)Wolbórz (4)Bartoszyce (3)Będzin (3)Drezdenko (3)Gliwice (3)Jaworzno (3)Jelcz-laskowice (3)Katowice (3)Kraśnik (3)Krzywda (3)Limanowa (3)Marki (3)Mogilany (3)Olsztyn (3)Poddębice (3)Police (3)Rybnik (3)Serniki (3)Strzelce (3)Szamotuły (3)Szreńsk (3)Wojnicz (3)Zakliczyn (3)Ząbkowice śląskie (3)Brzeziny (2)Bukowina tatrzańska (2)Bydgoszcz (2)Dobroń (2)Glinojeck (2)Gorlice (2)Grodzisk mazowiecki (2)Halinów (2)Izabelin (2)Jasło (2)Kalisz (2)Karczew (2)Koszalin (2)Kotla (2)Krobia (2)Krotoszyn (2)Kłodzko (2)Leszno (2)Lubartów (2)Lublin (2)Lubsza (2)Międzyrzecz (2)Mrągowo (2)Nielisz (2)Obrowo (2)Ożarów mazowiecki (2)Pabianice (2)Pieńsk (2)Porąbka (2)Przasnysz (2)Przemyśl (2)Przysucha (2)Pszczyna (2)Radom (2)Rawicz (2)Rudna (2)Rzewnie (2)Rzgów (2)Siedlce (2)Skierniewice (2)Skrzyszów (2)Sosnowiec (2)Stare miasto (2)Starogard gdański (2)