The main objective of the procurement is to enter into a framework agreement with a service provider. The contract mainly includes asphalting at ROAF Miljøpark at Skedsmokorset. The assignment comprises asphalt maintenance services for the current plant and infrastructure, as well as new asphalting works. The works shall i.a. include asphalting of access roads, parking lots, development areas in connection with recycling stations and waste sorting plants. The works include asphalting/laying, rolling/levelling, improvements and repairs of road surfaces and sub-bases, removing uncompact material, cutting, milling as well as job notification services, etc.
The contracting authority would like, via this competition, to enter into a framework agreement for the delivery of asphalt and asphalting works.
The asphalting works will mainly be in relation to municipal infrastructure, such as municipal roads in residential areas, industrial areas, etc. The works are related to i.a. i.a.
— New asphalting works.
— Re-asphalting works.
— Speed bumps.
— Patching.
Asphalting with the accompanying work on municipal roads and open spaces within Lier, Røyken and Hurum municipalities.
The Water and Sewage Department works on the renewal, improvement and repair of the department's pipeline network and installations. Most of this is located under the town's streets, roads and pavements. This work is done year round. After the work on the department's pipeline network and installations has been completed, the excavation sites shall be covered and repaired as soon as possible.
The current framework agreement is valid until 31.9.2017.
As the department has a continual need for this type of services, the Technical Stand-By Department (ATB) shall procure a new framework agreement for asphalting, removing uncompacted matter, cutting, laying kerbstones, laying paving stones/pavement blocks, marking asphalt and commissioning green areas.
(See the attached tender documentation for details.).
The Water and Sewage Department works on the renewal, improvement and repair of the department's pipeline network and installations. Most of this is located under the town's streets, roads and pavements. This work is done year round. After the work on the department's pipeline network and installations has been completed, the excavation sites shall be covered and repaired as soon as possible in accordance with the response time requirements.
The work includes, amongst other things:
— asphalting, laying kerbstones, paving stones and SF-stones, as well as securing asphalting areas,
— securing and blocking/work notifications and signage,
— rigging and operation,
— removal of temporary road covers and sub-base,
— levelling quarry waste,
— cutting edges,
— milling cogging,
— adjusting manhole frames and drain grates,
— commissioning green areas connected to the assignments.
The work also includes the necessary cleaning of manhole grates and water channels etc. after the asphalting, if these have been polluted.
'Asphalting work, Northern Region 2016 — Tender round 2 comprises 9 contracts divided between 5 in Nordland, 3 in Troms and 1 in Finnmark.’
Tenderers should register their interest in Doffin.
The tenderer's contact person will be registered as the PMS-user and will be sent a user name and password.
Asphalting work, Region north 2016 — Tender round 1 includes 7 contracts distributed as follows: 2 in Nordland, 4 in Troms and 1 in Finnmark.
Tenderers should register their interest in Doffin.
The tenderer's contact person will be registered as the PMS-user and will be sent a user name and password.
Avinor shall during spring 2017, execute new asphalt works for the runway 11/29 at Stavanger Airport. The contract includes electrical works — disassembly and assembly of runway lights, etc., required for the execution of the new asphalting work.