Public tenders for asphalting in Greece

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

"Asphalting road Lawn-Sarantaporo»

Περιφέρεια Θεσσαλίας Περ. Ενότητα Λάρισας Γεν. Διευθ. Αναπτ. Προγ. Περ. και Υποδ. ΔΤΕ | Published May 28, 2014  -  Deadline July 22, 2014
cpvs
45233122

The project involves the construction projects to improve the geometric characteristics of the existing dirt country road in a total length of 15,900 meters (of which the last part is paved and is part of the old highway and which will be the work of asphalt and complete struts on either fibrillation). Connects the settlement of Livadi Municipality Elassonas and more specifically from KP \ 1 +800 to KP 17 +700 to Sarantaporos highway Kozani-Larissa (59th km), near the village Sarantaporou. Includes:-widening (increased width to 7.00 m and 1.00 m wide shoulders on both sides)-Earthwork, Construction-Construction,-paving (with two layers of subbase and two base layers)-Asphalting (a asphalt base layer thickness of 5 cm and a thickness of asphalt layer traffic 5 cm). Final section: 7,0 m / 9,0 m.

paving and asphalting works

Perifereia Anatolikis Makedonias & Thrakis - Perifereiaki Enotita XanthisGR | Published June 8, 2012
Winner
ΜΕ.ΚΟΝ. ΑΕ Χάλκης 10 654 04 Καβάλα GREECE Telephone: +30 2510622300 Fax: +30 2510622303
cpvs
45233222

Το έργο αφορά την βελτίωση (διαπλάτυνση) της αρ.7 Eπαρχιακής Οδού από την διασταύρωση με αριθ 2 Ε. Ο. και μέχρι τον οικισμό ΄Αβατο. Το συνολικό μήκος βελτίωσης του δρόμου είναι 12.215,00 μ περίπου, με τυπική διατομή 1,00 μ. έρεισμα, 7,50 μ. οδόστρωμα και 1,75 μ. έρεισμα. Θα κατασκευαστούν 5 ισόπεδοι τρισκελείς κόμβοι,προς Θαλασσιά, Κοσμητή, Άγιο Αθανάσιο, Όλβιο και Δέκαρχο. Ειδικότερα οι εργασίες που προβλέπονται είναι: επέκταση των τεχνικών, μετατόπιση του αρδευτικού δικτύου, εξυγίανση και ανακατασκευή του οδοστρώματος όπου απαιτείται, χωματουργικά, οδοστρωσία (μία στρώση υπόβασης πάχους 0,10 μ από θραυστό υλικό της ΠΤΠ Ο-150 και μία στρώση βάσης πάχους 0,10 μ από θραυστό υλικό της ΠΤΠ Ο-155), ασφαλτικά (μία ασφαλτική στρώση βάσης πάχους 0,05μ. της ΠΤΠ Α-260 και μία ασφαλτική στρώση κυκλοφορίας, πάχους 0,05μ. και πλάτους 7,50 μ. της ΠΤΠ Α-265), σήμανση, τοποθέτηση στηθαίων ασφαλείας και ηλεκτροφωτισμός όλων των κόμβων.

Completion port facilities Mesta Chios Prefecture

Υπουργείο ΥΠΟ.ΜΕ.ΔΙ / Γ.Γ.Δ.Ε / Γ.Δ.Σ.Ε./Διεύθυνση Λιμενικών Έργων και Έργων Αεροδρομίων (τ.Δ4) | Published September 14, 2013
Winner
Σιγάλας ΝικόλαοςΕγκρεμού 11Χίος 821 00 +30 2271041284 +30 2271081166
cpvs
45233120

The project objective is to develop additional land areas in Limenas Meston N. Chiou total area of ​​ten acres, which include: construction parking spaces and construction of internal roads projects. Complete network construction stormwater runoff. Scraping and asphalting of the existing link is. The installation of the remaining part of the network lighting. The supply and installation in the port area wheeled pump suction of oil residues and urban waste and manufacturing metal sheds for passengers.

Works for complete or part construction and civil engineering work

Δήμος Σιθωνίας | Published August 4, 2015  -  Deadline October 1, 2015
cpvs
45200000, 45212000, 45214200, 45243510, 45246400, 45310000, 45330000, 45320000, 50500000, 45332300, 45311000, 45315300, 45316000, 45316100, 45316110, 45316211

The assignment to work involves repairing damage, having undergone a basic infrastructure of Sithonia municipality of the severe weather that hit the City during the winter period. Specifically, the work includes: - excavation cleaning and restoration functionality streams - concreting and asphalting municipal roads - rehabilitation of municipal roads, municipal land and in general municipal public spaces - restoring damaged wooden and metal structures (bridges, pergolas, etc.), - Mains recovery of municipal streets and general public municipal areas - reconstruction of green areas, - construction of flood protection works (wells, stormwater networks, stone roof, etc.), - replacement of water supply networks - reconstruction hydrant sources - rehabilitation sewerage - repair and maintenance of building infrastructure.

Road construction works

Δήμος Νέας Προποντίδας | Published November 11, 2017  -  Deadline December 15, 2017
cpvs
45233120

The auctioned project includes the following:

A) the asphalting of existing municipal roads within the settlements, which according to the Road Designs Directives - Functional Road Network Classification (MNOE-CERD) is classified in category ΔV. The basic principle of design is to maintain the existing geometry of the engraving, that is to say, as far as possible to observe existing layouts and commitments from properties in order to reduce construction costs. The engraving follows - on a case-by-case basis - the existing roads within the settlements along their entire length, both horizontally and individually, adapting to the existing relief and improving it where possible in order to improve traffic conditions and reduce the demands of earthworks. The typical cross section applied - in order to meet the above requirements - is similar to the e2 cross-section of the MNE. The study speed is 50Km / h and the speed limit ranges from 20Km / h to 50Km / h depending on the values ​​obtained by the horizontal and cross-sectional curves of the road. As the roads under consideration in the agglomerations are mainly used for the passage of vehicles, it is generally proposed to maintain the trough of the existing roads along their entire length and then start the milling and laying of asphalt layers. Paving materials will be placed locally and locally only where necessary to improve the carrying capacity of the road. The needs of paving and asphalt materials will be covered by legal quarries. All the proposed materials will fully meet the requirements of Greek Technical Specifications (ETEP), (FEK'2221 / 30-7-2012),

B) Improvement and upgrading of the existing rainwater network within the village of Nea Triglia by the construction of new projects (wells, installation of new conduits of sufficient cross sections) in order to achieve the controlled and efficient collection and disposal of stormwaters adjacent to the ...

Road construction works

Δήμος Νέας Προποντίδας | Published November 15, 2017  -  Deadline December 15, 2017
cpvs
45233120

The auctioned project includes the following:

A) The asphalting of existing municipal roads within the settlements, which according to the Road Designs Directives - Functional Road Network Classification (MNOE - LODS) is classified in category ΔV. The basic principle of design is to maintain the existing geometry of the engraving, that is to say, as far as possible to observe existing layouts and commitments from properties in order to reduce construction costs. The engraving follows - on a case-by-case basis - the existing roads within the settlements along their entire length, both horizontally and individually, adapting to the existing relief and improving it where possible in order to improve traffic conditions and reduce the demands of earthworks. The typical cross section applied - in order to meet the above requirements - is similar to the e2 cross-section of the MNE. The study speed is 50Km / h and the speed limit ranges from 20Km / h to 50Km / h depending on the values ​​obtained by the horizontal and cross-sectional curves of the road. As the roads under consideration in the agglomerations are mainly used for the passage of vehicles, it is generally proposed to maintain the trough of the existing roads along their entire length and then start the milling and laying of asphalt layers. Pavement materials will be placed locally and locally only where necessary to improve the carrying capacity of the road. The needs of paving and asphalt materials will be covered by legal quarries. All proposed materials will fully meet the requirements of the Greek Technical Specifications (ΕΤΕΠ), (FEK'2221 / 30-7-2012).

B) The formation of the streets of Thessaloniki and Panagia Koryfini in the settlement of N. Moudania with the side construction of the sidewalks, the installation of lighting ties and the local layout of green spaces.

C) The formation of five communal spaces (squares) in the settlement of ...

  • 1