Public tenders for asphalt-works in Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

"Balatonvilágos urban roads asphalting works"

Balatonvilágos Község Önkrományzata | Published July 10, 2015
Winner
STRABAG Általános Építő Kft.
cpvs
45233220

"Balatonvilágos urban roads asphalting works," the invitation to tender, the documentation and the following detailed in: • Balatonvilágos, Petofi u .: Asphalt reconstruction of housing existing surface clearing 5 cm gravel thickness of new 6cm wearing course reimbursement of 632 meters in length, 3 meters in width • Balatonvilágos Kinizsi Street .: Asphalt reconstruction of housing existing surface clearing 3 cm, new 5cm wearing course reimbursement of 104 meters in length, 3 meters in width • Balatonvilágos, Zalán u .: Asphalt reconstruction of housing existing surface clearing 3 cm, new 4cm wearing course spreading 444 meters in length, 3.5 meters in width • Balatonvilágos, Hétvezér u .: Asphalt reconstruction of housing existing surface clearing 3 cm, new 4cm wearing course reimbursement of 585 meters long, 4 meters wide • Lake Bright, Dew u .: Surface Replacement 20 cm thick, 6 cm showdown milled asphalt, a surface coating layer 2 453 meters in length, 3.2 meters in width • Clear Lake, Hunor u .: 6 cm showdown milled asphalt, a surface coating layer 2 863 meters in length is 3 meters in width

The Organ, Dawn and asphalting works Szippankó streets Kunszentmiklós

Kunszentmiklósi Víziközmű-Társulat | Published February 24, 2016
Winner
Út-Ép-Ker 97 Kft.
cpvs
45233220

Kunszentmiklós Organ, Dawn and Szippankó asphalting streets, border supply of a total of 5641 m2 surface

A contract "Gánt Municipality Petofi street asphalting works to carry out"

Gánt Község Önkormányzata | Published November 16, 2016
Winner
FTK Építő Kft.
cpvs
45233220

A contract "Gánt Municipality Petofi street asphalting works to carry out"

Information on the outcome of the proceedings - Execution Framework Agreement pavement milling works, large-area mechanical asphalting work and asphalting works to perform aftercare

Budapest Közút Zártkörűen Működő Részvénytársaság | Published November 4, 2016
Winner
Colas Út Zrt.
cpvs
45220000

Information on the outcome of the proceedings - Execution Framework Agreement pavement milling works, large-area mechanical asphalting work and asphalting works to perform aftercare

Information about the contract amendment - Paving works milling, machine large surface asphalting work and asphalting works and other special after-treatment of the subject of performing works célgépes

Budapest Közút Zártkörűen Működő Részvénytársaság | Published June 1, 2016
Winner
Hazai Építőgép Társulás Kft.
cpvs
45000000

Subject: Works
"Paving the milling works, large-area mechanical asphalting work and asphalting-mun disseminate the aftercare and carry out other special célgépes Work of"
quantity:
Paving works milling, machine large surface asphalting work and asphalting works and other special post-treatment célgépes completion of works, quantities, unpriced budget annexed to the Technical Specifications. technical parameters of the tasks of the contracting authority to be the order of the tender documentation III. Volume determined.

Contract award notice - Paving works milling, machine large surface asphalting work and asphalting works aftercare and carry out other work subject of special célgépes

Budapest Közút Zártkörűen Működő Részvénytársaság | Published January 20, 2016
Winner
Hazai Építőgép Társulás Kft.
cpvs
45000000

Subject: Works
"Paving works milling, machine large surface asphalting work and asphalting mun-lozenges and perform other special after-treatment of the subject of work célgépes"
CPV code: 45000000-7 Construction work
Quantity:
- 1 x 1,0 m wide routing, full Level-controlled, tracked pavement milling machine rental, server management and staff of different milling depths
- 1 x 2,0 m wide routing, full Level-controlled, tracked pavement milling machine rental, server management and staff of different milling depths
- Asphalt finisher operator and fuel
- 8-ton asphalt roller operator and fuel
- 9-ton asphalt roller operator and fuel
- Seprüs, locsolós car operator and fuel

Results of the procedure: Paving Milling works, large-area mechanical asphalting works, asphalting works and other special post-treatment completion work célgépes

BKK Közút Zártkörűen Működő Részvénytársaság | Published July 3, 2015
Winner
Hazai Építőgép Társulás Kft.
cpvs
45520000, 45221250

Subject: WORKS Paving work milling, machine large surface asphalting works, and works to advising GTC aftercare célgépes carry out other special tasks. Quantity: Contracting the PPA. The amount of public procurement on the basis of § 46 (2) defines as follows. The framework contract sum of net 24,900,000, -EUR. In some cases, you may notice that the orders are not listed célgépes works with a total value does not exceed 20% of the allocation.

The FKF K1686 Management Company. Bp. III. Brother út 10 / a. s. carried out at the premises during asphalting works

Fővárosi Közterület-fenntartó Zártkörűen Működő Nonprofit Részvénytársaság | Published October 21, 2016
Winner
KÖZMŰ-ALAGÚT Magas- és Mélyépítő Zártkörűen Működő Részvénytársaság
cpvs
45000000

The FKF K1686 Management Company. Bp. III. Brother út 10 / a. s. carried out at the premises during asphalting works

Information on the "roads of Great Hosszúpályi Municipality own strong asphalting works on" Law on public procurement procedure

Hosszúpályi Nagyközség Önkormányzata | Published May 6, 2016
Winner
D-PROFIL Kft.
cpvs
45233142

Information on the "roads of Great Hosszúpályi Municipality own strong asphalting works on" Law on public procurement procedure

Information on the "roads of Great Hosszúpályi Municipality boost organic asphalting works" adopted by the outcome of the procurement process

Hosszúpályi Nagyközség Önkormányzata | Published November 13, 2015
Winner
D-PROFIL Kft.
cpvs
45233120

The object of the procurement "roads Hosszúpályi Great Local Government boost organic asphalting works on" the volume of purchases: Contracting intends to implement Hosszúpályi the village of the following streets in respect of road reconstruction - Aradi street - Liszt F. street - Rose Street - Free street - Merry Street - Vörösmarty utca. According to the current state of the streets are freshly restored Z 0/4 crushed stone. The asphalting work should include the manhole covers, valves, etc. szintbeemelését, profiling preparation, crushed stone splay. The noble shoulder surface 3990 m2, a thickness of 8 cm. Government-managed aszfaltozandó roads affected their length, width - Aradi street: Length (m): 410 asphalting width (m): 3 berm width (m): 2x1 szintezendő objects (pieces): 12 - Liszt F. street: length ( m): 280 asphalting width (m): 3 berm width (m): 2x1 szintezendő objects (pieces): 6 - Rose Street: Length (m): 200 asphalting width (m): 3 berm width (m): 2x1 szintezendő Objects (No.) 7 - Free street: Length (m): 320 asphalting width (m): 3 berm width (m): 2x1 szintezendő objects (pieces): 10 - Merry Street: Length (m): 295 asphalting width ( m): 3 berm width (m): 2x1 szintezendő objects (pieces): 4 - Vörösmarty utca: Length (m): 490 asphalting width (m): 3 berm width (m): 2x1 szintezendő objects (pieces): 6 Total : Length (m): 1995 asphalting width (m): 3 berm width (m): 2 szintezendő objects (pieces): 45 A contractor responsible for the construction waste generated during removal as well. The compliance or equivalence must be verified authentic quality certificate or a declaration from an independent, professionally recognized organization, especially from the manufacturer. The contracting authority draws attention to the process of work opening the quantities listed in the invitation only serve to inform the bidders on the scale of the work and should not be considered quantitative detection of the work actually performed.

A contract to carry out urban roads in the Municipality Lőrinci pothole repair and maintenance of asphalting works

Lőrinci Város Önkormányzata | Published May 8, 2017
Winner
Gregbrate-Ép. 99 Kft.
cpvs
45233141

A contract to carry out urban roads in the Municipality Lőrinci pothole repair and maintenance of asphalting works

Information on the outcome of the procedure. MÁV Zrt Infrastructure Regional Directorate in Budapest roads, crossings and platforms can not be planned asphalting works and perform related ancillary activities

MÁV Magyar Államvasutak Zrt. | Published June 24, 2015
Winner
ORIENT 9001 Kft.
cpvs
45233251

Main activity: It is expected that with various thickness (4-20 cm) Installation of 1,100 m3 of asphalt pavement. Additional activities: The asphalting and other work necessary traffic engineering planning, licensing, road closures, road closures parties to ensure the necessary road traffic and other signs outsourcing. Peronszegély repair markings, signs and peronszegély and marking the border elsodrási

A contract to the road connecting Poroszlói Heroes Fair, Zsámba, land distribution and Yellow Beach streets and roads renovation of Youth and Rescue Station area before the asphalting works carried out

Poroszló Község Önkormányzata | Published March 13, 2015
Winner
Strabag Általános Építő Korlátolt Felelősségű Társaság
cpvs
45000000, 45233228

A contract to the Poroszlói Heroes Fair, Zsámba, land reform streets, as well as liaison between the Yellow Coast Youth and road reconstruction of streets, and the area directly in front of Ambulance asphalting work done. Total quantity: Heroes, Fair, Zsámba, land distribution and connecting roads between streets and Youth Yellow Coast road: 1. The streets along the length of the existing verge 0.5-0.5 m width will be trimming the upper plane of the existing pavement, right side drop design. 2. In the resulting excess material padkanyesés within 5 km, the area designated by the local government is deposited. 3. The cover of water, sewage manhole covers are raised by the final pavement level. 4. In areas where the pavement due to the failure of subsidence can be found in the full court made the following layer structure replacement policy: a. Expand cladding layers 30 cm thick in b. Subsoil compaction of c. Making sandy gravel soil layer 10 cm thick in d. Create Minded roadbed crushed stone 20 cm thick in the fifth overall surface layers of fine grit, balancing the corresponding page drop design. 6. prepared according to the above account is correct, improved surface 5 cm thick asphalt pavement is in AC-11 Hound 50/70 labeled material incorporated finisher. 7. After the preparation of the berm aszfaltszőnyegezést responsibility of the Government. Ambulance surface before asphalting: 1. The entire surface before the ambulance station (. Circa 200 m2) 4 + 1 cm thick asphalt pavement is in AC-11 Hound 50/70 labeled material incorporated finisher after the removal of impurities in the enclosure. The total amount and the detailed technical description of the tender documents will be explained in further detail.

MÁV Zrt. Infrastructure Regional Directorate in Budapest, roads, crossings and platforms can not be planned and carried out asphalting works related ancillary activities

MÁV Magyar Államvasutak Zrt. | Published February 6, 2015  -  Deadline February 24, 2015
cpvs
45233251

Enterprise Framework Contract "Infrastructure Regional Directorate in Budapest, roads, crossings and platforms can not be planned and carried out asphalting works related ancillary activities" of the subject

Just around the corner by the Municipality of the "sharp expansion of urban sanitation and cleaning" after the completion of subjects, KEOP-1.2.0 / B / ID No. 10-2010-0027 sewage network construction project related works of asphalting works

Sarkad Város Önkormányzata | Published October 2, 2015
Winner
Hódút Kft.
cpvs
45233120, 45233228

Sarkad Város Önkormányzatának "Sarkad város szennyvízelvezetés és tisztítás bővítése" tárgyú, KEOP-1.2.0/B/10-2010-0027 azonosítószámú projektjéhez kapcsolódó szennyvízhálózat kivitelezési munkáit követő aszfaltozási munkák elvégzése az alábbi főbb mennyiségben: A létesítmény megnevezése, helye, beavatkozás szélessége és hossza: - Bánát utca 5 m szélességben 82 m hosszon - Batthyány utca 3,5 m szélességben 285 m hosszon - Bem utca 3 m szélességben 115 m hosszon - Bojti utca 3,5 m szélességben 215 m hosszon - Csillag utca 3,5 m szélességben 250 m hosszon - Deák utca 4 m szélességben 468 m hosszon - Dessewfy utca 4 m szélességben 382 m hosszon - Hargitai sétány 3,5 m szélességben 52 m hosszon - Hatház utca 6,5 m szélességben 46 m hosszon - Honvéd utca 3,5 m szélességben 126 m hosszon - Hunyadi utca 3,5 m szélességben 100 m hosszon - Kálvin utca 3,5 m szélességben 150 m hosszon - Kálvin tér 3,5 m szélességben 20 m hosszon - Körös utca 6,5 m szélességben 20 m hosszon - Körösháti - Rövid utca 6,5 m szélességben 305 m hosszon - Kürt utca 3,5 m szélességben 60 m hosszon - Március 15 utca 4 m szélességben 85 m hosszon - Nagy Kálmán utca 3,5 m szélességben 560 m hosszon - Szegfű utca 4 m szélességben 85 m hosszon - Retek utca 3,5 m szélességben 75 m hosszon - Rózsa utca 4,2 m szélességben 775 m hosszon - Stefánia utca 4,2 m szélességben 147 m hosszon - Táncsics tér 3,5 m szélességben 82 m hosszon - Vár utca 5 m szélességben 82 m hosszon Tervezett pályaszerkezet: Azon utcákban ahol a magassági kapcsolódások, illetve kopóréteg állapot miatt indokolt a meglévő kopóréteg lemarása: - 5 cm AC-11 50/70 kopó - meglévő, mart burkolat - Bánát utca - Bem utca - Hatház utca - Körösháti és Rövid utca (meglévő kopóréteg marása nélkül) - Stefánia utca - Vár utca Azon utcákban ahol a kopóréteg már oly mértékben tönkrement hogy marása nem lehetséges: - 5 cm AC-11 50/70 kopó - 3-5 cm zúzottkő kiegyenlítő/feszültségoldó réteg beépítés finisherrel - meglévő burkolat - Batthyány utca - Bojti utca - Csillag utca - Deák utca - Dessewfy utca - Hargitai sétány - Honvéd utca - Hunyadi utca - Kálvin utca - Kálvin tér - Körös utca - Kürt utca - Március 15 utca - Nagy Kálmán utca - Szegfű utca - Retek utca - Rózsa utca - Táncsics tér - Vár utca A tervezett aszfaltozásokat minden esetben min. 5 m hosszon kell kifuttatni a csatlakozó meglévő aszfaltburkolatoknál. Ennek érdekében a meglévő csatlakozó burkolatokat vissza kell marni. További részletes feladatleírást az ajánlati dokumentáció és a dokumentáció mellékletét képező tervdokumentáció tartalmaz.

Authors landscape mode Dunaharaszti 2014 export stormwater drainage works

Dunaharaszti Város Önkormányzata | Published October 8, 2014
Winner
Hidrográd Víz és Közműépítő Kft.
cpvs
45247112

Haraszti export Danube drainage works in 2014 stormwater quantity: Basic Quantity Description Quantity Quantity. unit. Dankó K-Street 1-0, S 1-1-1, 1-1 S-labeled channel 1 DN 200 KG PVC sewer laying 183 m 2 DN 200 KG PVC laying concrete channel protection 88 3 m DN 160 KG PVC channel 40 4 m of reinforced concrete construction víznyelőhöz translator - Cleaning shaft construction 10 x 5 x 16 6 Road construction Víznyelőakna underground passage conduit 19 7 m 2 Élőrekötés street Bolyai S, 1-1; 1-1-2 and S-marked channel storm water drainage and road restoration 1 DN 200 KG PVC sewer laying 143 m 2 DN 160 KG PVC sewer construction víznyelőhöz (5 × 5 m) 25 m 3 of reinforced concrete translator - Cleaning shaft construction 4 5 Víznyelőakna construction 10 5 Cleaning Pipe installation 2 6 Road underground passage conduit 6 m 7 Élőrekötés 1 8 Demolition work preparing 18.8 m3 9 Excavation and excavated material removal, mirror training 484 m3 10 Border area to build murvából 34.6 m3 11 Load-bearing kőváz 270 m3 12 Surface leveling layer construction murvából closing 13 to 90 m3 of Asphalt Road edge of the 346 meter building Cavity 14 AC 11 asphalt-quality asphalt, the GATEWAY, sidewalk connections szintbeemelésével 80.64 m3 Utility Manhole asphalting szintbeemelése 15 10 16 Traffic regulations outsourcing 5 Bem Street S 1-1-3 marked one channel rainwater installation DN 200 KG PVC channel 154 m 2 DN 160 KG PVC sewer construction víznyelőhöz 20 m 3 of reinforced concrete translator - Cleaning shaft construction building Víznyelőakna 5 4 10 5 1 Élőrekötés Bela Bartok road S -2-1 labeled channel 1 DN 200 KG PVC sewer laying 225 m 2 DN 160 KG PVC sewer construction víznyelőhöz (6 × 5 m) 30 m 3 of reinforced concrete translator - Cleaning shaft construction building Víznyelőakna 7 x 4 x 12 5 Road underground conduit duct 5 m 6 Élőrekötés 1 Apponyi Albert Street 1 Open covert infiltration trench construction rubble concrete slabs from 82.5 m 2 Reinforced head concrete construction of C12 grade concrete of 165 m 3 of reinforced concrete retaining wall construction of 10 Michael pc Babits street 1 Open covert infiltration trench construction rubble concrete sheeting 218.5 fm two reinforced head concrete construction of C12 grade concrete 437 m 3 of reinforced concrete retaining wall construction of 48 units of Las Torres Street 1 Open covert infiltration trench construction rubble concrete slabs from 154 m 2 Reinforced head concrete construction of C12 grade concrete, 308 m 3 of reinforced concrete retaining wall construction of 32 units Gyóni road one open covert infiltration Construction of concrete rubble trench sheeting 131.5 m 2 head Reinforced concrete grade C12 concrete construction Reinforced concrete retaining wall construction of 263 m 3 20 4 DN 200 reinforced concrete culvert construction protected Green 48 fm u. rainwater in Vineyard Street. u and Hungary. Open from 1 to covert infiltration trench construction rubble concrete sheeting 400 m 2 reinforced concrete construction C12 head grade of 800 m 3 of concrete reinforced concrete retaining wall construction 40 x 4 1 bond forward Földváry u.csapadékvíz drainage Dózsa Gy.u. Industrialist and u. between 1 Open covert infiltration trench construction rubble concrete slabs from 250 m 2 Reinforced head concrete construction of C12 grade concrete of 500 m 3 of reinforced concrete retaining wall construction 20 4 dribbling field with 1 piece 5 pre-bond 1 Conditional volume (Optional): Contracting within 60 days of signing the contract entitled, whether one or more, in addition to the quantity ordered to carry out the following tasks in several polling. Name Quantity Quantity. unit. Deák Ferenc u. water utility after the restoration of the road reconstruction Jendrassik u. and Eötvös u. between storm water drainage and road restoration 1 Open covert infiltration trench construction rubble concrete slabs from 477 m 2 Reinforced head concrete construction of C12 grade concrete, 954 m 3 of reinforced concrete retaining wall construction 60 4 Excavation and excavated material removal, mirror training 350 m3 5 Gravel berm design 70 m3 6 Load-bearing kőváz construction of 140 m3 7 stabilized road base construction closure of 140 m3 8 Asphalt road winds of 700 lm 9 preparatory Asphalt works (milling, sweeping, emulsion, dispersion, geotextile showdown) Construction of 1989 m2 10 Cavity asphalt AC 11 grade asphalt, the GATEWAY, sidewalk connections szintbeemelésével 140 m3 11 Utility Manhole szintbeemelése before asphalting reconstruction George Street 7 pc Dózsa introduction area of ​​the old plant gas exchange capacity of the RSD to No. 510 on the main road translator-cleaning hole: 99.50 m 99.50 m - 120 D shaft construction reinforced concrete cleaner (3) over 5 m depth to the necessary drainage works db 3.00 m2 piece - the development of an inclusive and dredging the riverbed (1) Artwork Estuarine 1.00 - Bilateral lowering groundwater levels (300 m2) 300.00 - Large-diameter shaft translator Construction of 5.5 m to a depth of 1 Csokonai
  • 1