Public tenders for air-conditioning in Estonia

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

air-conditioning installations

Tallinna Teeninduskool | Published July 17, 2012  -  Deadline July 11, 2012
cpvs
32330000, 39160000, 42512000, 44212300

air-conditioning installations

Ventilation and Air Conditioning Maintenance

Tartu Ülikool - TUULI ILULA | Published September 6, 2016
cpvs

Ventilation and Air Conditioning Maintenance

The air conditioning purchase, installation and maintenance

Maaeluministeerium - KÄTLIN KALAJÄRV | Published December 20, 2016
cpvs

The air conditioning purchase, installation and maintenance

Ventilation and Air Conditioning Maintenance Service Buying local

Sihtasutus Pärnu Haigla - Este Maidle | Published May 11, 2015
Winner
aktsiaselts Pristis, 10004826, Lõõtsa tn 8a, Tallinn, 11415 Eesti (EE) Tel.: +372 56983059
cpvs
50730000

In this procurement involving the purchase of Pärnu Hospital Clover 1 Treatment street 2 and the timber 1, installed in a building ventilation system (A list of devices HD Annex 1) and the local air-conditioning (air conditioning) (A list of devices HD Annex 2) Maintenance services (hereinafter referred to as the Service) for the period 01.06. 2015-31.05.2017.

Ventilation and air-conditioning maintenance services for local purchases

Sihtasutus Pärnu Haigla - Este Maidle | Published March 17, 2015  -  Deadline April 10, 2015
cpvs
50730000

This procurement involving the purchase of Pärnu Hospital Clover 1, Ravi tn.2 and Forest 1 installed in a building ventilation system (equipment list HD Annex 1) and the local air conditioning (air conditioning), (list of devices HD Annex 2) Maintenance services (hereinafter referred to as Service) for the period 01.06. 2015-31.05.2017.

Mining machines air conditioning maintenance and repair Purchase

Eesti Energia Kaevandused AS - KAIDO LINNARD | Published March 18, 2015  -  Deadline April 15, 2015
cpvs
50500000

Excavations purchased from Eesti Energia AS-i open-cast mining machines, and air conditioning maintenance and repair work necessary spare parts.

Mining machines air conditioning maintenance and repair Purchase

Eesti Energia Kaevandused AS - KAIDO LINNARD | Published April 14, 2015  -  Deadline April 21, 2015
cpvs
50500000

Excavations purchased from Eesti Energia AS-i open-cast mining machines, and air conditioning maintenance and repair work necessary spare parts.

Balti power plant of 11 block ventilation and in air conditioning maintenance

Enefit Energiatootmine AS - Dina Kovriga | Published July 28, 2016  -  Deadline August 29, 2016
cpvs
50532000

Balti power plant of 11 block ventilation and in air conditioning maintenance

Air conditioning cabinet, the cabinet and the air content of the concrete determinant of purchase

Tallinna Tehnikaülikool - EVELI KOBAR | Published May 10, 2017
Winner
Osaühing KEMEK ENGINEERING, 10952635, Paldiski mnt 185-40, Tallinn, 13518 Eesti (EE) Tel.: +372 5090572
cpvs
38540000

Air conditioning cabinet, the cabinet and the air content of the concrete determinant of purchase

Highways Agency in the southern region of the ventilation systems and air-conditioning equipment maintenance

Maanteeamet - Anneli Laurits | Published April 13, 2017  -  Deadline May 2, 2017
cpvs
50730000

Highways Agency in the southern region of the ventilation systems and air-conditioning equipment maintenance in accordance with the contract documents

Ventilation system and the local air conditioning maintenance service purchase

Sihtasutus Pärnu Haigla - Este Maidle | Published June 4, 2013
Winner
aktsiaselts Pristis, 10004826, A.H.Tammsaare tee 47, Tallinn, 11316 Eesti (EE) Tel.: +372 56983059
cpvs
50730000-1

purchased Pärnu Hospital Clover 1 and Forestry 1 installed in a building ventilation system (HD equipment list in Appendix 1), and localized air conditioning systems (air conditioners) (HD Equipment list in Annex 2) maintenance service

Ventilation and air conditioning maintenance services for local buying

Sihtasutus Pärnu Haigla - Este Maidle | Published April 22, 2014
Winner
OSAÜHING AEK, 10426705, Tondi 1-331, Tallinn Eesti (EE) Tel.: +372 5073352
cpvs
50730000

Of this contract is the procurement of Pärnu Hospital Clover 1, Treatment and Forest tn.2 one installed in a building ventilation system (HD equipment list in Appendix 1), and localized air conditioning systems (air conditioners) (HD equipment list in Appendix 2) Maintenance services (hereinafter referred to as the Service) for the period 10 May 2014 until 31 May 2015.

Ventilation and air conditioning maintenance services for local buying

Sihtasutus Pärnu Haigla - Este Maidle | Published March 11, 2014  -  Deadline March 25, 2014
cpvs
50730000

Of this contract is the procurement of Pärnu Hospital Clover 1, Treatment and Forest tn.2 one installed in a building ventilation system (HD equipment list in Appendix 1), and localized air conditioning systems (air conditioners) (HD equipment list in Appendix 2) Maintenance services (hereinafter referred to as the Service) for the period 10 31 May 2014 May 2015.

Ventilation and air conditioning maintenance services for local buying

Sihtasutus Pärnu Haigla - Este Maidle | Published March 18, 2014  -  Deadline March 26, 2014
cpvs
50730000

Of this contract is the procurement of Pärnu Hospital Clover 1, Treatment and Forest tn.2 one installed in a building ventilation system (HD equipment list in Appendix 1), and localized air conditioning systems (air conditioners) (HD equipment list in Appendix 2) Maintenance services (hereinafter referred to as the Service) for the period 10 31 May 2014 May 2015.

Oil Factory premises, buildings and structures with ventilation and in air conditioning maintenance and repair

Enefit Energiatootmine AS - Natalja Beljajeva | Published May 24, 2017  -  Deadline June 9, 2017
cpvs
50730000

Oil Factory premises, buildings and structures with ventilation and in air conditioning maintenance and repair. Validity of a contract: 01.07.2017.a - 31.12.2018.a. Complete equipment maintenance according to the enclosed ventilation and air conditioning systems for a list of factory-manufacturer maintenance cards under. Contract .: A technical description, see Part II of the tender documents. Technical description of the attached Annex la 7th

Eesti power facilities, buildings and facilities, ventilation and in air conditioning maintenance and repair

Enefit Energiatootmine AS - Natalja Beljajeva | Published January 12, 2017
Winner
Osaühing SKAT-KESKUS, 10611957, Kreenholmi 33-31, Narva, 20203 Eesti (EE) Tel.: +372 55548464
cpvs
50730000

Eesti power facilities, buildings and facilities, ventilation and in air conditioning maintenance and repair. The period of validity of a contract: 01/01/2017 - 31.12.2018.a. Contract technical description, see Part II .: the contract documents. Technical description of the attached Annex la 7th

Eesti power facilities, buildings and facilities, ventilation and in air conditioning maintenance and repair

Enefit Energiatootmine AS - Natalja Beljajeva | Published November 25, 2016  -  Deadline December 12, 2016
cpvs
50730000

Eesti power facilities, buildings and facilities, ventilation and in air conditioning maintenance and repair. The period of validity of a contract: 01/01/2017 - 31.12.2018.a. Contract technical description, see Part II .: the contract documents. Technical description of the attached Annex la 7th

Balti power plant equipment, facilities, buildings and structures in air conditioning and ventilation of the technical service

Enefit Energiatootmine AS - Natalja Beljajeva | Published April 6, 2017
cpvs

Balti power plant equipment, facilities, buildings and structures in air conditioning and ventilation of the technical service

Auvere power facilities, buildings and facilities, ventilation and air conditioning maintenance

Eesti Energia Narva Elektrijaamad AS - Natalja Beljajeva | Published January 7, 2016
Winner
Osaühing SKAT-KESKUS, 10611957, Kreenholmi 33-31, Narva, 20203 Eesti (EE) Tel.: +372 5029185
cpvs
50730000

Systems of industrial purpose, ie, the power plant must ensure the reliability of technological equipment. Systems management is carried out by means of a corresponding controller 13 on the control of the building. The volume of work: 252 Total includes servicing the system, of which 121 of the ventilation system and the air valve 80, 35 and 16 air heaters air-conditioning system, in addition to the 60 fire protection valves. In response to the time required for ventilation and air-conditioning system for the elimination of defects, from receipt of the notification time: 2 hours. The list of work equipment, technical maintenance: Includes all operations in the performance of the devices valmistamise-, over use of the manual and the technical service: control boards work and automation equipment configuration checking, testing, control devices (PDS, and temperature sensors), if they raise doubts about the readings. Prevention work rotating mechanisms (control of vibration, a belt-tightening, lubrication of bearings). Prevention of actuators (manual and automatic control of their work mode, switches Setting the lubrication of moving parts). The latch-reguleerarmatuuri prophylaxis (reguleerimisklappide the work of inspection, lubrication of moving parts). Cleaning water filters, air filters, exchange. Check the operation of the circulation pumps. In addition, the volume of works to be performed include: Thermal insulation and insulation of the metal coating and the dismantling of the installation (and, where necessary, in small volumes), excluding equipment warranty repairs are not related to thermal insulation and the replacement of the metal coatings. Materials and spare parts required for servicing the transport, loading and unloading. During a service the refuse, scrap metal and the like. cleaning. Intra-station thermal testing programs, participation in networks. (2 times a year), Air-conditioning heat exchangers, compressed air purification, the Contractor shall use the dust collection equipment. Inspection of fire dampers. May 2010, a., § 42.). Air-conditioning service, substances formed during the Cold gathering, export and disposal. The Contractor must comply with their obligations under the kekkonnaministri Regulation No. 25 of 11.07.2012 "fluorinated greenhouse gases and ozone-depleting substances in products, equipment, systems and tanks, and handling may register the statutes and rules of keeping and reporting procedures and forms". The contractor must carry out in accordance with the licensing requirements of its fluorinated kasvuhoonegaaaside service generated during the refrigerant collection, extraction and utilization. Necessary equipment prior exchange of coordinating with Customer.

Auvere power facilities, buildings and facilities, ventilation and air conditioning maintenance

Eesti Energia Narva Elektrijaamad AS - Natalja Beljajeva | Published November 25, 2015  -  Deadline December 11, 2015
cpvs
50730000

Systems of industrial purpose, ie, the power plant must ensure the reliability of technological equipment. Systems management is carried out by means of a corresponding controller 13 on the control of the building. The volume of work: 252 Total includes servicing the system, of which 121 of the ventilation system and the air valve 80, 35 and 16 air heaters air-conditioning system, in addition to the 60 fire protection valves. In response to the time required for ventilation and air-conditioning system for the elimination of defects, from receipt of the notification time: 2 hours. The list of work equipment, technical maintenance: Includes all operations in the performance of the devices valmistamise-, over use of the manual and the technical service: control boards work and automation equipment configuration checking, testing, control devices (PDS, and temperature sensors), if they raise doubts about the readings. Prevention work rotating mechanisms (control of vibration, a belt-tightening, lubrication of bearings). Prevention of actuators (manual and automatic control of their work mode, switches Setting the lubrication of moving parts). The latch-reguleerarmatuuri prophylaxis (reguleerimisklappide the work of inspection, lubrication of moving parts). Cleaning water filters, air filters, exchange. Check the operation of the circulation pumps. In addition, the volume of works to be performed include: Thermal insulation and insulation of the metal coating and the dismantling of the installation (and, where necessary, in small volumes), excluding equipment warranty repairs are not related to thermal insulation and the replacement of the metal coatings. Materials and spare parts required for servicing the transport, loading and unloading. During a service the refuse, scrap metal and the like. cleaning. Intra-station thermal testing programs, participation in networks. (2 times a year), Air-conditioning heat exchangers, compressed air purification, the Contractor shall use the dust collection equipment. Inspection of fire dampers. May 2010, a., § 42.). Air-conditioning service, substances formed during the Cold gathering, export and disposal. The Contractor must comply with their obligations under the kekkonnaministri Regulation No. 25 of 11.07.2012 "fluorinated greenhouse gases and ozone-depleting substances in products, equipment, systems and tanks, and handling may register the statutes and rules of keeping and reporting procedures and forms". The contractor must carry out in accordance with the licensing requirements of its fluorinated kasvuhoonegaaaside service generated during the refrigerant collection, extraction and utilization. Necessary equipment prior exchange of coordinating with Customer.