The project will be implemented within the administrative boundaries of the prefectures of Achaia and Ilia. The construction works are to:
37 + 500, 14,44km length, which is formed with realignment. Note that performed at venues unfinished earthworks of another contractor. 33 + 037).(C) New and upgradeable lateral and vertical paths.
(D) Other accompanying works, ie rainwater - drainage drainage works, signaling works - Security - fencing, engineering structures (bridges, Upper & Lower Crossings, culverts, walls, etc.), environmental projects, road lighting facilities, telephone services, network irrigation - fire, etc.
(E) Work remaining in manufactured / imikataskefasmena technical (Upper and Lower Crossings and culverts) to artful completion.
(F) Green Works.
(G) Temporary variations roads and traffic arrangements during construction works.
The budget of the auctioned contract work is 54 695 161,29 EUR excluding VAT and the budget of options is 5 286 290,32 EUR without VAT
The project will be implemented within the administrative boundaries of the prefectures of Achaia and Ilia. The construction works are to:
37 + 500, 14,44km length, which is formed with realignment. Note that performed at venues unfinished earthworks of another contractor. 33 + 037).(C) New and upgradeable lateral and vertical paths.
(D) Other accompanying works, ie rainwater - drainage drainage works, signaling works - Security - fencing, engineering structures (bridges, Upper & Lower Crossings, culverts, walls, etc.), environmental projects, road lighting facilities, telephone services, network irrigation - fire, etc.
(E) Work remaining in manufactured / imikataskefasmena technical (Upper & Lower Crossings and culverts) to artful completion.
(F) Green Works.
(G) Temporary variations roads and traffic arrangements during construction works.
The subject of the project to construct included a performance of any kind of earthworks (with relevant borrow and apothesiothalamon projects), engineering structures (bridges, Upper and Lower crossings, culverts, walls, curbs, paving, etc.), stability works slope and improvement projects conduct against concessions (decontamination, any required ballast, etc.), paving, asphalt, marking (vertical and horizontal), security, fence for road works, sewerage-drainage, electrical installations (street lighting, irrigation, telephone services infrastructure, etc.), installation of green, green irrigation, green maintenance, displacement - restoring PUO networks, etc.
The Project Owner may exercise an option for an additional amount of up to 6.555.000,00 EUR (VAT included). This right can be exercised at any time within three years after the conclusion of the Convention and will address the performance of work for:
27 + 045 (technical K809) budget to EUR 2.935 000 (with VAT).2) Widening 2,7km long road around the new Node Araxos until NNR Patras - Pyrgos budget by EUR 860 000 (VAT included).
3) Reconstruction of the road in parts of the existing road from Lapa to Arax, budget to 2 EUR 760 000 (VAT included).
The project is located in the municipality O.T.240 Philadelphia - Chalcedon and involves the construction of the 3rd High School and the 3rd New Philadelphia High School, with a total building area of 6 591,24 m² in surface land 12 186,15 m².
3rd New Philadelphia High School
The building area is 3 317,76 m².
It includes classrooms, a multipurpose room, library, labs, landscaping, etc.
3rd New Philadelphia High School
The building area is 3 273,48 m²
It includes classrooms, a multipurpose room, library, labs, landscaping, etc.
THE CONTRACT yperirotomografias system is a cardiac use modern technology, cardiology type of use, year of manufacture 2016, coming from China is not the most modern type cardiac use production model, the construction firm Midray.
Valuation of real estate after their components, which necessarily be expropriated for the construction of the following project to be implemented with the Concession Agreement: "Study - Construction, Financing - Maintenance Operation and Exploitation of the New International Airport of Heraklion and Design - Construction and Financing Road of connections ".
The object of the competition includes the supply, transportation and complete installation on site on municipal land at "Kefalovrysso" Mesologi municipality, testing, training in the use / operation of equipment and delivery of excellent and trouble free operation status of equipment included in Advanced Tech. Description:
A. Expansion and modernization hydrant equipment.
V.Systima cleaning and disinfection of drinking water by placing closed charcoal filters and disinfection assemblies.
G.Systima control and remote control of abstraction of drinking water of the city Etoliko and new municipal departments.
The above sections include infrastructure, procurement and installation of equipment necessary for the complete construction of facilities and networks. Included also all the necessary work (excavation, waterproofing, foundation, / M work, coatings, etc.).
The object of the competition includes the supply, transportation and complete installation on site on municipal land at "Kefalovrysso" Mesologi municipality, testing, training in the use / operation of equipment and delivery of excellent and trouble free operation status of equipment included in Advanced Tech. Description:
A. Expansion and modernization hydrant equipment.
B. Drinking water purification and disinfection system by placing activated carbon filters and closed disinfection assemblies.
C. Abstractions and remote control system Etoliko potable city water and new municipal departments.
The above sections include infrastructure, procurement and installation of equipment necessary for the complete construction of facilities and networks. Included also all the necessary work (excavation, waterproofing, foundation, / M work, coatings, etc.).
1) Expansion and modernization hydrant equipment
- Supply and installation of a new pump station mepromitheia materials and connection work with the existing network.
- Supply and installation of generating sets.
- Supply and installation of new electrical power distribution boards with supply of materials and removal operations of the existing tables, the supply of materials and connection work with the existing network but also with all the consumptions (existing or new) ie. Cable ducts, cables electric accessories , construction work etc. adjustment.
- Supply and installation of electric gate source output isolation. It also includes the wall structure of reinforced concrete of 80 m. Within the existing technical (the old road Mesologi - Agrinio) the required sealing operations of components and any work required.
- Projects of protection and ambient sealing hydrant ...
The project will be executed in N. Attica in Greece.
To the construction projects are: construction of six (6) Pedestrian bridge in broad outlines of Attica. The footbridges of positions are:
A. Posidonos Avenue and Avenue Kalamaki, Alimos,
B. Kifissias Avenue and Panormou, Athens,
C. Mesogeion and IKA Agia Paraskevi Agia Paraskevi,
D. -Guest Provata Athens Avenue, Haidari,
E. Ave Poseidon and Aphrodite, Palaio Faliro,
ST. Avenue Athens Palataki, Chaidari.
The budget for the contract work is auctioned 9 959 677,42 EUR excl.
The project will be executed in N. Attica in Greece.
The construction works are to:
The project is the construction of six (6) Pedestrian bridge in broad outlines of Attica. The footbridges of positions are positions:
A. Posidonos Avenue and Avenue Kalamaki, Alimos,
B. Kifissias Avenue and Panormou, Athens,
C. Mesogeion and IKA Agia Paraskevi Agia Paraskevi,
D. -Guest Provata Athens Avenue, Haidari,
E. Ave Poseidon and Aphrodite, Palaio Faliro,
ST. Avenue Athens Palataki, Chaidari.
The bridges consist of the body, the two abutments (no piers) and pedestrian accesses.
The carrier is in all cases steel with arched form. The piers and trunks with their foundations made of reinforced concrete. The bodies of four pedestrian bridges A, B, C, D are similar to one another and have an opening 43,50 m. (Type 1 Body). The bodies of the other two footbridges E, F are also similar to each other and have an opening 57,00 m. (Type Body 2). In each pedestal corresponds to a stairway and an elevator except Foot bridges A and E which are foreseen two lifts on each side.
Body Type 1 consists of a single arch and a tractor with a deck plate manufactured by m ...
new pumping world will be built near the Egnatia Odos world settlement area consisting of a small building and underground water tank which will be installed four (4) submersible pumps.
Will be drilling and exploitation of two new wells (C3 and C4).
new water transmission network will be built by the city of Komotini (bridge area Trelocheimmarou NR Komotini - Alexandroupoli) to the new pump world that will transport potable water from Komotini to the pumping station. The network will consist of polyethylene pipe PE F225 10atm
new water transmission system will be built from the existing C1 and drilling new wells C3 and C4 that will transport water from wells to pump new world. The network will consist of polyethylene PE F225 10 atm conductor (C3 from the borehole to the pump room) and PE F125 10 atm (from drilling C4 to C3 and the drilling of the borehole C1 to the drain F225).
Currently a pipeline 10atm F160 powering the tower of the world in world C2 drilling. This pipeline will be cut before the passage of the Via Egnatia and will unite with suitable vanostasio with new polyethylene pipe PE F160 10 atm to feed the new pumping station
Will be constructed water transmission system in the new world pumping to the existing PE conductor F225 10 atm that carries water to the settlements Ag. Theodori.
1. Construction of overhead draining column ( «Riser»),
2. construction of underground draining pipe ( «Service Lines»),
3. construction of gas distribution network in polyethylene «4 bar»,
4. construction of gas distribution network in steel «19 bar»,
5. maintenance and monitoring networks and drainage systems.
The project will be implemented within the administrative boundaries of the prefectures of Achaia and Ilia. The construction works are to:
(A) Motorway Patras - Pyrgos section from km 23 + 060 to km 37 + 500, 14,44km length, which is formed with realignment. Note that performed at venues unfinished earthworks of another contractor.
(B) Interchange Vardas (km 33 + 037).
(C) New and upgradeable lateral and vertical paths.
(D) Other accompanying works, ie rainwater - drainage drainage works, signaling works - Security - fencing, engineering structures (bridges, Upper and Lower Crossings, culverts, walls, etc.), environmental projects, road lighting facilities, telephone services, network irrigation - fire, etc.
(E) Work remaining in manufactured / imikataskefasmena technical (Upper and Lower Crossings and culverts) to artful completion.
(F) Green Works.
(G) Temporary variations roads and traffic arrangements during construction works.
Supply of materials for the works by direct labor for the needs of the municipality budget 1 119 941 EUR incl.
Basic design of the project is the construction of Toll Station of Thessaloniki on Egnatia Street, as reflected in the CMD 6686 / 11.14.2014. The technical scope of the project includes the necessary widening road works, construction of retaining walls and shifting side roads, where required, for the configuration and construction of the toll station hopper, the construction of suitable roads, construction administration building and bungalows collectors, islets the supply and installation of E / M equipment, the construction of the steel roof and signage - insurance in the toll station area and any other work that it becomes the toll station ready for operation. The project included excavation work, technical, paving, asphalt, lighting, signage - road safety, construction, water supply, sewerage and E / M installations and equipment.
Basic design of the project is the construction of Toll Station of Thessaloniki on Egnatia Street, as reflected in the CMD 6686 / 11.14.2014. The technical scope of the project includes the necessary widening road works, construction of retaining walls and shifting side roads, where required, for the configuration and construction of the toll station hopper, the construction of suitable roads, construction administration building and bungalows collectors, islets the supply and installation of E / M equipment, the construction of the steel roof and signage - insurance in the toll station area and any other work that it becomes the toll station ready for operation. The project included excavation work, technical, paving, asphalt, lighting, signage - road safety, construction, water supply, sewerage and E / M installations and equipment.
This service contract in accordance with PD60 / 2007 as replaced by the N.4412 / 2016 stating the following: Create a random network, perform sampling for quality control of irrigation water in the study area, analyzes of samples and interpretation of results analyzes. In addition to the scope of the project included the formulation, by experts, proposals for the management of any water degradation problems related to agriculture and capture the results in a dynamic geographic information system.
The class road construction project involves the construction imianoichton (and in some places closed) and shelters against rock falls protection walls on the existing road Rovies-Ilia-L. Edipsos. Details of the construction are indicated in the technical description and approved technical project planning.
This study concerns both updating the approved Programming Plan (Master Plan) of Kalamata Port and other developing preliminary design and final design of marine works and final design and implementation study / M installations, drafting study HSP - HSF and the preparation of Tender Documents .