Public tenders for clothing in Koblenz Germany

Find all Clothing tenders in the world.
Finding business opportunities has never been easier.

Results for clothing. Make a new search!

Occupational clothing

Stadtverwaltung Koblenz | Published January 11, 2017
cpvs
18110000

Delivery of office and operational clothing.

Delivery of office and operational clothing of firefighters Koblenz.

Occupational clothing

Stadtverwaltung Koblenz | Published September 27, 2016  -  Deadline November 3, 2016
cpvs
18110000

Delivery of office and operational clothing of firefighters Koblenz.

Occupational clothing, special workwear and accessories

Landesbetrieb Mobilität Rheinland-Pfalz | Published May 5, 2017
Winner
Berendsen textilservice GmbH
cpvs
18100000, 18130000, 98310000

Delivery of working and warning clothing on a leasing basis as well as cleaning of the customer's laundry (laundry).

Equipment of approx. 1 800 service technicians with working and warning clothing.

Supply of labor and visibility clothing on a leasing basis and cleaning

Landesbetrieb Mobilität Rheinland-Pfalz | Published November 18, 2016  -  Deadline December 29, 2016
cpvs
98310000, 18100000, 18130000

Framework agreement for the supply of office and operational clothing for firefighters Koblenz

Stadtverwaltung Koblenz | Published September 22, 2016  -  Deadline November 3, 2016
cpvs
18230000, 18412000, 35811100, 18110000

Parachutes

Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw) | Published October 27, 2017  -  Deadline November 29, 2017
cpvs
39523000

It is planned to purchase a modular tactical parachute system consisting of coordinated tactical parachutes of different sizes as well as different additional equipment. Ensure compatibility with clothing and equipment already in use.

After evaluating the tenders, the three most promising bidders will buy trial samples in separate contracts and a practical part of the offer evaluation will be carried out. For this purpose, evidence of an existing civil or military authorization is required.

Within the scope of the order the model approval by the Federal Aviation Authority is to be obtained. A prerequisite for this is the approval as an aeronautical development company, which is also to be obtained by the contractor. In addition, the suitability of the offered products as well as the necessary documentation for the preparation of the deployment maturity must be demonstrated with a prototype to be delivered.

Series approval and retrieval from the framework contract are made upon presentation of all prerequisites.

Data services

Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw) | Published November 25, 2015  -  Deadline December 14, 2015
cpvs
72300000, 48613000, 72510000, 72511000

The BAAINBw intends to award benefits to software maintenance and software change. Bw-MILSTRAP System (Military Standard Transaction Reporting and Accounting Procedure) is the central logistical and technical information system is coordinated processes in order. It comprises mainly the leadership of the documentary material proof of portfolio holdings (except supplies, food and clothing), the disposition of the material stock in the central logistics in projects part "material planning on the screen" (MDBS) and the leadership of the logistically relevant data of the departments of the Bundeswehr " Staff Index "(DI). A closely networked cooperation also exists with the for the individual branches of the armed forces (TSK) to the material requirements cover unrealized specific connection method. For data management and for guiding the documentary material evidence the portfolios depending TSK, for discussion and for guiding the logistically relevant data Directory are realized batch jobs. The performance includes not only the technical program implementation, but also the previous analysis of errors and the coarse and fine design changes, also advising the Bundeswehr with respect to necessary adjustments due to changes in the underlying legislation or at the interfaces.

Architectural, engineering and planning services

Bundesrepublik Deutschland, vertreten durch das Bundesministerium für Verteidigung, dieses vertreten durch das Amt für Bundesbau -ABB-, dieses vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Koblenz, vertreten durch die Niederlassungsleitung | Published September 15, 2015  -  Deadline October 13, 2015
cpvs
71240000

B .: BFR; True Basic Military Infrastructure Assets and General Umdrucke) observed. This looks especially section the following functional areas. the predefined function schema before: -. Central area with entrance hall, among others - diagnosis / treatment, among other things pure with clinical / chemical laboratory, sterilization / sterilization impure side, Physical Therapy, Radiology, engaging space sept / procedure room Asept, audiometry / vision screening room, disposal space. , ECG / Ergometry / lung function, sonography, - maintenance, - Dental Group, inter alia, with examination and treatment rooms, dental technical laboratory, X-ray room, central room disinfection / sterilization procedure room Oral surgery, recovery room - doctor's examination, treatment and evaluation, - guide / assistance - supply / disposal, - training / exercise / rescue service, - Additional medical function points - Social Facilities / Sanitary facilities, - storage of flammable liquids, storage room medical gases, storeroom special clothing, armory, storage room 1 and 2 supply (bear no functional relationship to other areas), - outdoor installations. The development of the site is done by connecting to the existing infrastructure of the property. When planning, tendering and construction of the medical care center, the provisions of the agreement agreed target table of the Guide for Sustainable Building (BNB) are to be observed and to take into account a life cycle oriented cost optimization. Before the measure was drawn up a feasibility study in July 2014 which will be provided to as the basis for the order execution. 3,540,000 EUR -brutto-. Performance periods for the services of the contractor: - creation of advanced IT-Bau: 02-08 / 2016 - Creation of AFU-Bau: 01-08 / 2017 - Targeted Start of construction: September 2017
  • 1