Call +44 800 9755 164

Public tenders for clothing in Hannover Germany

Find all Clothing tenders in the world.
Finding business opportunities has never been easier.

Results for clothing. Make a new search!

Occupational clothing

Logisitik Zentrum Niedersachsen | Published December 7, 2016  -  Deadline January 13, 2017
cpvs
18110000

Each division has several bureaus and their bases (see Appendix 1 "services overview").

For more details on the nature and extent of the advertised delivery performance are the terms of reference - Technical Section (Part B) refer to.

1 VgV).

Each division has several bureaus and their bases (see Appendix 1 "services overview").

For more details on the nature and extent of the advertised delivery performance are the terms of reference - Technical Section (Part B) refer to.

1 VgV).

The clothing in the current lease in circulation is not the responsibility of the new authority.

The jurisdiction of the logistics center Niedersachsen ends with the fall of the hammer.

Occupational clothing, special workwear and accessories

Logistik Zentrum Niedersachsen – Landesbetrieb -, Außenstelle Hannover | Published January 21, 2015  -  Deadline February 27, 2015
cpvs
18100000

The contract includes a framework agreement for the supply of protective clothing for the Lower Saxony State authority to forgive for road construction and traffic. The protective clothing includes the appropriate outerwear as well as safety shoes. The authority includes the central business areas as well as 13 regional divisions, spread over all of Lower Saxony. For each division has several road, or highway maintenance, a total of 76 sites (see Appendix 1 Overview AM -. SM). For more details on the nature and scope of the contract are the terms of reference - Technical Section (Part B) refer to.

Washing and dry-cleaning services

Medizinische Hochschule Hannover | Published June 3, 2015  -  Deadline June 29, 2015
cpvs
98310000

Following the closure of its own laundry, the dry cleaning (z. B. ward, area, children's and OP-laundering, special clothing made of cotton and mixed fabrics) to be taken over by an external service provider. This includes the provision of appropriate rental clothing, the takeover of existing laundry and cleaning and treatment of sterile surgical gowns. The plan is the use of 2 laundry dispensing systems. Furthermore, the external service provider to provide mobile mesh trolley in sufficient numbers are available which with the transport vehicles MHH-own ("Electric Locomotives") can be connected.

Ventilation installation work

Gesellschaft für Bauen und Wohnen mbH (GBH) | Published April 25, 2015
Winner
Air-Konzept GmbH & Co. KG
cpvs
45331210

Ventilation installations: domestic ventilation unit with heat recovery = 37 pcs .; Spiral Ducts / Accessories DN 80 ... 200 = 1 100 m; Air duct L1, L2 = 60 m2 .; Fire damper DN 100 ... 250 = 35 pcs .; Fire damper 250/150 ... 300/150 = 4 pcs .; Treppenhausspüllüftungsanlage = 1 pc., Intake, exhaust valves = 200 pcs .; Fire protection line / clothing / accessory. = 150 m².

Ventilation installation work

Gesellschaft für Bauen und Wohnen mbH (GBH) | Published April 25, 2015
Winner
Air-Konzept GmbH & Co. KG
cpvs
45331210

Ventilation installations: domestic ventilation unit with heat recovery = 33 pc; Spiral Ducts / Accessories DN 80 ... 200 = 950 m; Air duct L1, L2 = 20 m2 .; Fire damper DN 100 ... 250 = 4 pcs; Intake, exhaust valves = 165 pcs; Fire protection line / clothing / accessory. = 70 m2

Trockenbauarbeiten, wooden doors, sanitary partitions

Region Hannover Team Zentrale Submissionen -30.02- | Published March 30, 2017  -  Deadline April 19, 2017
cpvs

Change of use of the print shop in the region home to a cafeteria, as well as expansion of a new building Trockenbauarbeiten, wooden doors, sanitary partitions Scope: The measure is the change of use of prev-house print shop in the basement floor of the region home to a cafeteria, as well as increasing the planned dining room with a new building. , - acoustic ceilings in the dining room about 285 m² - Suspended ceilings in the adjoining rooms about 53 sqm - fire protection clothing F-90 the stock cover about 617 sq meters - GK-walls D = 125, double planked 400 m2 - protective membrane supports about 90 m2 - interior doors suitable for damp areas about 21 pieces

Installation of doors and windows and related components

Diakoniekrankenhaus Henriettenstiftung gemeinnützige GmbH | Published September 12, 2015  -  Deadline October 13, 2015
cpvs
45421100, 45212190, 44221220

103 St window elements made of aluminum profiles, 5 St door elements made of aluminum profiles, 6 St VERBUND- window elements with integrated. Aluminium solar shading, 4 St strip windows aluminum mullion transom construction with use of window elements, 74 St exterior window sills made of aluminum, 160 meters outside window sill made of aluminum for window hinges EC, 33 St SUPPORT CLOTHING aluminum moldings, insulation, 138 St FASSADENRAFFSTOREN, 1 PSCH sunscreen control, inclusive planning, 1 PSCH parameterization, commissioning and training, 9 St multi-purpose doors - outer doors made of steel soundproof / fire protection, 1 PSCH Technical processing, structural analysis / verification of stability PR facade EC, 1 PSCH Technical processing, structural analysis / verification of stability window facades.

Ventilation installation work

Gesellschaft für Bauen und Wohnen mbH (GBH) | Published April 25, 2015
Winner
Air-Konzept GmbH & Co. KG
cpvs
45331210

Ventilation installations: domestic ventilation unit with heat recovery = 32 pcs .; Supply and return air unit with heat recovery Kita 1500 m3 / h = 1 pc .; Supply air kitchen 1 200 m3 / h = 1 pc .; Exhaust air unit kitchen 1 200 m3 / h = 1 pc .; Cabinet, software / accessories almost 110 Datenpkt. = 1 pc .; Fridge, Freezer m. sep. condensing unit = 2 pcs .; Spiral Ducts / Accessories DN 80 ... 200 = 1,200 m; Spiral Ducts / Accessories DN 250 ... 400 = 65 m; Air duct L1, L2, L5 = 75 m2 .; Fire damper DN 100 ... 250 = 24 pcs .; Fire damper 350/200, 400/250, 500/300 = 8 pcs .; Intake, exhaust valves = 205 pcs .; Fire protection line / clothing / accessory. = 60 m².

Metalworking

Diakovere Krankenhaus gemeinnützige GmbH | Published June 17, 2016
Winner
Heinrich Brasche Stahl- und Metallbau GmbH
cpvs
45262670, 45223210

Preparatory work:

1 St. Psch Technical editing static;

Stahlbauarbeiten:

1 582.08 kg steel structure at Attica, dim. approximately 65/465/90 mm, S 235 JR;

1 381.861 kg steel structure, roof structure of the connection duct, S 235 JR;

42 m 2 Corrugated metal roof construction;

43 m 2 Canopy of Lying sick of way, construction steel S 235 JR;

Metallbauarbeiten:

83.4 m railing structure as impact protection, with handrail and Bettenabweiser, S 235 JR steel, connecting bridge;

147.41 m 2 Bannister, two flights of stairs, indoors, S 235 JR steel, stainless steel handrail;

200.87 m stainless steel handrails, wall-mounted, staircases;

8 St. penetration protection at stair landings, grating 30/30/35, staircases;

2 St. steel stairs with Gitte grate steps and landing, 4 for ventilation center UG and OG Technikzentralge;

30 m 2 Gitte grate platform with railings, roof 4.OG, galvanized steel;

3 St. ladders, S 235 JR galvanized;

1 929.84 kg clothing of steel girder construction, steel sheet 5mm, S 235 JR;

500 kg allowance for clothing of steel girder construction, steel sheet 5 mm, S 235 JR, small parts;

10 m Rammschutz guardrail profile.

DIAKOVERE Hospital gGmbH - Expansion and reconstruction of the integration of the Lister Hospital - steel and metal construction.

Diakovere Krankenhaus gemeinnützige GmbH | Published March 8, 2016  -  Deadline April 6, 2016
cpvs
45262670, 45223210

Preparatory work

1 St. Psch Technical editing static

STEEL WORKS

1582.08 kg steel structure at Attica, dim. 65/465 / 90mm, S 235 JR

1381.861 kg steel structure, roof structure of the connection duct, S 235 JR

42 m 2 Corrugated metal roof construction

43 m 2 Canopy of Lying sick of way, construction steel S 235 JR

METAL WORKS

83.4 m railing structure as impact protection, with handrail and Bettenabweiser, S 235 JR steel, connecting bridge

147.41 m 2 Bannister, two flights of stairs, indoors, S 235 JR steel, stainless steel handrail

200.87 m stainless steel handrails, wall-mounted, stairwells

8 St. penetration protection at stair landings, grating 30/30/35, stairwells

2 St. steel stairs with Gitte grate steps and landing, 4 for ventilation center UG and OG Technikzentralge

30 m 2 Gitte grate platform with railings, roof 4.OG, galvanized steel,

3 St. ladders, S 235 JR galvanized

1929.84 kg clothing of steel girder construction, steel sheet 5mm, S 235 JR

500 kg allowance for clothing of steel girder construction, steel sheet 5 mm, S 235 JR, small parts

10 m Rammschutz guardrail profile.

Diakoniekrankenhaus Henriettenstiftung - Expansion and reconstruction of the integration of the Lister Hospital - facade - windows, doors and sun protection.

Diakoniekrankenhaus Henriettenstiftung gemeinnützige GmbH | Published March 1, 2016
Winner
AWO Oberlausitz gemeinnützige Integrationsgesellschaft mbH Bausysteme
cpvs
45421100, 45212190, 44221220

103 St. window elements made of aluminum profiles,

5 St. door elements made of aluminum profiles,

6 St. composite window elements with integrated. Aluminium solar shading,

4 St. strip windows aluminum mullion transom construction with use of window elements,

74 St. exterior window sills made of aluminum,

160 m External window sill made of aluminum for window tapes EC,

33 St. props clothing aluminum moldings, insulation,

138 St. Fassadenraffstoren,

1 Psch sunscreen control, including planning,

1 Psch parameterization, commissioning and training,

9 St. multipurpose doors - exterior doors made of steel soundproof / fire protection,

1 Psch Technical editing, structural analysis / verification of stability PR facade EC,

1 Psch Technical editing, structural analysis / verification of stability window facades.

Scaffolding work

Diakoniekrankenhaus Henriettenstiftung gemeinnützige GmbH | Published October 21, 2015
Winner
Bau- und Spezialgerüstbau Franke & Wagner GmbH
cpvs
45262100

. 3, 196 m2 scaffolding facade f u roofing work on flat roofs, LK 4, W 09, Einrüsthöhe to 19 m. 507 m2 scaffolding facade f u roofing works at Flachdä Chern, LK 4, W 09, Einrüsthöhe to 11 m without anchoring tion to the building, bridge building..; 507 m2 side protection railings inside the building; 421 m2 safety scaffold f roof work on flat roofs, LK 4, W 09, Einrüsthöhe to about 5.50 m without building-anchoring. 1 St. façade scaffold tower, shoring with 5 stages before a bring openings, width / depth 4 m / 3 m, capacity of 5 t; 400 St. scaffold anchors, permanently installed, Galvanized steel, up to 160 mm spacing, (EIFS with clinker); 2 St. stairwells, vorgebaut, height about 19 m; 1373 m2 scaffolding clothing with safety net; 1 St. Material Lift, 20 kN, 1 loading point / framework level.

Scaffolding work

Diakoniekrankenhaus Henriettenstiftung gemeinnützige GmbH | Published July 21, 2015  -  Deadline August 17, 2015
cpvs
45262100

. 3, 196 m2 scaffolding facade f u roof work on flat roofs, LK 4, W 09, Einrüsthöhe to 19 m. . 507 m2 scaffolding facade f u roofing work on flat roofs, LK 4, W 09, Einrüsthöhe to 11 m without anchoring to the building, bridge construction. 507 m2 side protection railings inside the building; 421 m2 safety scaffold f roof work on flat roofs, LK 4, W 09, Einrüsthöhe to about 5.50 m without building-anchoring. 1 St. façade scaffold tower, shoring with 5 stages before insertion holes, width / depth 4 m / 3 m, capacity of 5 t; 400 St. scaffold anchors, permanently installed, steel, galvanized, 160 mm spacing, (EIFS with clinker); 2 St. stairwells, vorgebaut, height about 19 m; 1373 m2 scaffolding clothing with safety net; 1 St. Material Lift, 20 kN, 1 loading point / framework level.

VKH remodeling and extension - 3rd phase - 1st Part.

Vinzenzkrankenhaus Hannover gGmbH | Published February 24, 2016  -  Deadline March 31, 2016
cpvs
45324000, 44112310, 45421141, 45421146, 44221200, 45421131, 44221220, 45215100, 45262700, 45215140

It must be carried out:

about 1 970 m 2 Metalleinfach- u double stud walls.

ca. 360 m 2 Facings and Schahctwände;

ca. 590 m 2 Steel bulkheads;

200m 3- and 4-sided clothing St Props and St-carrier;

ca. 520 m 2 Ceiling grid 62.5 x 62.5 cm;

ca. 320 m 2 GK-ceiling;

50m 2 F-30 GK-ceiling;

about 1 490 m frieze to 130 cm width;

ca. 180 m 2 Metal Langfeld ceiling;

ca. 220 m 2 F-30A Metallrasteredecke;

about 58 pieces and frames and doors.

approx 16 pieces T-30 doors;

approx 14 pieces Radiation protection doors;

about 2 piece sliding elements;

170 m wooden handrail.

  • 1