Call +44 800 9755 164

Public tenders for clothing in Bonn Germany

Find all Clothing tenders in the world.
Finding business opportunities has never been easier.

Results for clothing. Make a new search!

Siteworks

Bundesamt für Bauwesen und Raumordnung, in Vertretung der BimA | Published February 17, 2017  -  Deadline March 21, 2017
cpvs
45113000

Extension of the UNFCCC in Bonn "site equipment and logistics in accordance with DIN 18 300, 18 317, 18 320, 18 382nd

60 m above ground level.

The preparation is carried out under difficult conditions within a flood vulnerable construction site with appropriate flood protection measures.

The following services are provided:

Baulogistik

- Update logistics planning during the construction period;

- Access and control persons for construction site;

- Guarding the construction site;

Logistics online portal;

- Disposal logistics.

Site equipment:

- Upgrading of existing access roads;

- Production of bearing surfaces;

- Baucontaineranlagen for contractors in operating model;

- Baucontaineranlage for contracting;

Portable toilets in a skyscraper;

- Fences, Bautüren, protective clothing, during construction ramps and platforms;

Bauheizung;

- Winter service;

- Bausch Ran system and key management;

- Fire protection: fire extinguishers, emergency exit signs and warning system during construction;

Earthwork;

Earthworks.

Baubegleitender flood protection:

- Preparatory measures such acquisition, maintenance and provision of existing flood protection elements, provision of sandbags, provision of pumps;

- Emergency procedures as needed: Construction site evacuation, patrols flood protection;

- Measures after the flood as needed: cleaning, resettlement site.

Quantity or scope

- Container plant in AN operator model:

8 office containers, 21 accommodation containers, 14 container magazine

- Container System AG:

22 Office Trailers for offices and meeting rooms of various sizes, including 2

WC / kitchenette

- Sanitary and medical containers;

- Hoarding: 300 m;

- Weather protection 900 m 2 ;

- Upgrading access roads 1 000 meters 2 Asphalt base;

- Storage areas 150 m 2 ,

  • 1