Call +44 800 9755 164

Public tenders for cleaning in Starachowice Poland

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!
CleaningPolandstarachowice

Cleaning and sanitation services in urban or rural areas, and related services

Powiatowy Zakład Opieki Zdrowotnej z siedzibą w Starachowicach | Published December 11, 2015  -  Deadline December 29, 2015
cpvs
90600000, 90911200, 90921000, 77300000

Cleaning and sanitation services in urban or rural areas, and related services

Textile-cleaning services

Powiatowy Zakład Opieki Zdrowotnej w Starachowicach | Published February 4, 2015
Winner
TOM MARG ZPCH Spółka z o.o.
cpvs
98312000, 98311100, 98315000, 50830000

The contract is for a service, within the meaning of the Public Procurement Act, the Employer laundry services, rental of linen with transport and keeping a clean linen storage and lending night to collect dirty laundry for the County Health Care Center in Starachowice specifically provided in this Terms of Reference implemented subject to the conditions contained in this Terms of Reference in particular, as described in the project / model contract constitutes Appendices 4, 5. Rent underwear hospital having a permanent marking system that allows automatic identification and object recognition (eg. RFID UHF) in the amount of: No. Assortment quantity 1 Standard Pillow 1 401; 2 Quilt cover medical or blanket Standard 1 401; 3 Standard Sheet 1 401; 4 Sleepers 800; 5 Pillows 840; 6 Medical Blankets 840.

Cleaning and sanitation services in urban or rural areas, and related services

Powiatowy Zakład Opieki Zdrowotnej z siedzibą w Starachowicach | Published December 2, 2015  -  Deadline December 21, 2015
cpvs
90600000, 90911200, 90921000, 77300000

Usługi sprzątania oraz usługi sanitarne na obszarach miejskich lub wiejskich oraz usługi powiązane

Cleaning and sanitation services in urban or rural areas, and related services

Powiatowy Zakład Opieki Zdrowotnej z siedzibą w Starachowicach | Published February 4, 2016
Winner
Impel Cleaning Sp. z o.o.
cpvs
90600000, 90911200, 90921000, 77300000

The service in comprehensive hygiene, disinfection of hospital waste collection, maintenance of cleanliness and order outdoor areas, internal transport services and performing auxiliary activities on behalf of the Employer personnel. Additionally, the Contractor is obliged to take over 36 employees.

Cleaning and sanitation services in urban or rural areas, and related services

Powiatowy Zakład Opieki Zdrowotnej z siedzibą w Starachowicach | Published November 10, 2015  -  Deadline December 15, 2015
cpvs
90600000, 90911200, 90921000, 77300000

The service in comprehensive hygiene, disinfection, hospital waste collection, maintenance of cleanliness and order outdoor areas, internal transport services and performing activities ancillary staff on behalf of the Purchaser. Additionally, the Contractor is obliged to take over 38 employees.

Starachowice: Repair and maintenance of monumental installation in steel mill from the turn of the century. 1. Repair supporting structures (K1 and K2) in pipeline technology; 2. A pipeline R3 together with the supporting structure, foundations and adjacent devices.

Muzeum Przyrody i Techniki Ekomuzeum im. Jana Pazdura w Starachowicach | Published September 14, 2016  -  Deadline September 9, 2016
Winner
PHUP BANAKIEWICZ Maciej Banakiewicz, ul. Pod Borem 7, 26-004 Bieliny, kraj/woj. świętokrzyskie.
cpvs
45453000, 71327000, 45110000, 45111300, 45200000, 45212352, 45213250, 45223100, 45223110, 45223210, 45442200

The contract involves the repair and maintenance of pipelines which are part of the core business of the historic blast furnace in Starachowice (address: Museum of Nature and Technology in Starachowice, ul. Blast furnace 1, 27-200 Starachowice, precinct 02, dz.nr if necessary. 1146/2), entered the register of monuments under No. A.823 / 1-17. The work will be performed under the supervision of the Świętokrzyskie Regional Conservation (hereinafter ŚWKZ) and will be received after their approval by ŚWKZ. The contractor will be obliged to consult the permanent representative of the work ŚWKZ. The contractor will be required to independently develop the technology support the construction of pipelines for the duration of works. The contract includes in particular: cleaning of corrosion, replacement of damaged parts unfit for repair owing to the natural destruction, cleansing, strengthening, repair and necessary trade unfit for the repair of structures with foundations, protection against further corrosion, priming and painting color RAL 7015th important for the Employer is to reproduce the elements to be exchanged in particular riveted connections construction ...

Starachowice: REPAIR AND MAINTENANCE OF HISTORICAL INSTALLATION ironworks from the turn of the century. 1.REMONT supporting structures (K1 and K2) THE TECHNOLOGICAL pipelines; 2. PIPELINE WITH R3 supporting structures, foundations and adjacent DEVICES.

Muzeum Przyrody i Techniki Ekomuzeum im. Jana Pazdura w Starachowicach | Published July 22, 2016  -  Deadline August 17, 2016
cpvs
45453000, 71327000, 45110000, 45111300, 45200000, 45212352, 45213250, 45212313, 45223100, 45223110, 45223210, 45442100, 45442200

The contract involves the repair and maintenance of pipelines which are part of the core business of the historic blast furnace in Starachowice (address: Museum of Nature and Technology in Starachowice, ul. Blast furnace 1, 27-200 Starachowice, precinct 02, dz.nr if necessary. 1146/2), entered the register of monuments under No. A.823 / 1-17. The work will be performed under the supervision of the Świętokrzyskie Regional Conservation (hereinafter ŚWKZ) and will be received after their approval by ŚWKZ. The contractor will be obliged to consult the permanent representative of the work ŚWKZ. The contractor will be required to independently develop the technology support the construction of pipelines for the duration of works. The contract includes in particular: cleaning of corrosion, replacement of damaged parts unfit for repair owing to the natural destruction, cleansing, strengthening, repair and necessary trade unfit for the repair of supporting structures with foundations, protection against further corrosion, priming and painting color RAL 7015th important for the Employer is to reproduce the elements to be exchanged in particular riveted connections construction ..

Starachowice: Execution of hardening of the square, sidewalks, parking places in the area harcówki (step 1)

Gmina Starachowice | Published September 7, 2016  -  Deadline August 29, 2016
Winner
GROCHBUD II Sp. z o.o., ul. Żytnia 31/106, 27-200 Starachowice, kraj/woj. świętokrzyskie.
cpvs
45233140

The contract is for the execution of hardening square, sidewalks, parking places in the area harcówki (step 1) in the framework of the investment task. Residential land development in the area of ​​the street Scouts. The main scope of work includes: construction of curing square area harcówki of concrete blocks of the area. approx. 840 m2, construction of sidewalks with concrete blocks of the area. approx. 165 m2, construction of parking places with openwork plates of the area. approx. 50 m2, construction of small architecture (m. in. benches, baskets). A detailed description of the order specifies the design documentation, technical specification and execution of construction works. Created as part of the offer price m. In. should provide: full service surveying, organization and securing the construction site, maintenance facilities construction, all preparatory works and cleaning, clean up, road lane closure plan, health and safety, as-built documentation, other activities necessary for the execution of the contract period warranty on the work performed (from 60 months to 84 months). The contractor bears full responsibility the result, as well as destruction of private property and legal persons due to his act or omission related to the execution of this contract.

Starachowice: Execution of hardening of the square, sidewalks, parking places in the area harcówki (step 1)

Gmina Starachowice | Published July 22, 2016  -  Deadline September 30, 2016
cpvs
45233140

The contract is for the execution of hardening square, sidewalks, parking places in the area harcówki (step 1) in the framework of the investment task. Residential land development in the area of ​​the street Scouts. The main scope of work includes: construction of curing square area harcówki of concrete blocks of the area. approx. 840 m2, construction of sidewalks with concrete blocks of the area. approx. 165 m2, construction of parking places with openwork plates of the area. approx. 50 m2, construction of small architecture (m. in. benches, baskets). A detailed description of the order specifies the design documentation, technical specification and execution of construction works. Created as part of the offer price m. In. should provide: full service surveying, organization and securing the construction site, maintenance facilities construction, all preparatory works and cleaning, clean up, road lane closure plan, health and safety, as-built documentation, other activities necessary for the execution of the contract period warranty on the work performed (from 60 months to 84 months). The contractor bears full responsibility the result, as well as destruction of private property and legal persons due to his act or omission related to the execution of this contract.

Starachowice: construction of parking spaces Street. rocky

Gmina Starachowice | Published July 20, 2016  -  Deadline September 20, 2016
cpvs
45233140

Rocky in Starachowice. The scope of work includes (bill of quantities): 1) Works measuring the earthworks - 135 m2, 2) Demolition works (material for re-incorporation): curbs Concrete - 28 m, 3) Removal of stumps trees with a trunk diameter of about 30 cm - 1 pc . 4) Excavation - korytowanie the export of ore - 55.4 m3 5) Incorporation of concrete curb recovered from the demolition on the concrete bench with difficulty (1.89 m3), ballasted cement-sand 1: 4) - 28 mb (in including lying 26 m), 6) Incorporation of concrete curb (15 x 30 cm) on the concrete bench with difficulty (2.46 m3), ballasted cement-sand 1: 4) - 36.4 mb, 7) Profiling and density of the substrate the layer of pavement structures - 122.70 m2, 8) Execution of road base (cut-off layer of sand - 10 cm layer of crushed stone bottom - 15 cm layer of crushed stone top - 8 cm) - 122.70 m2, 3 cm, filling joints with sand - 122.70 m2 (4.2 m2 colored cubes to mark positions) 10) Performing other work in order to carry out the contract. 11) Construction of cleaning within and adjacent to the project implemented, including the repair of damaged during the construction of roads and the humus and grass seeding. The contractor is required before bidding to read the terrain on which the project will be the subject of the order. Created as part of the offer price, among others, should ensure: surveying services works including: Geodetic demarcation facility in the area, activities surveying in the course of construction, project approved traffic organization, for the duration of the renovation works, the organization and securing the construction site, as well as perform other reasonably foreseeable, under the rules, actions that may occur in connection with the robots, ordering the site after the completion of the works and possible payment of compensation for damage caused as a result of the works or in connection with them. offered warranty period for work performed (from 60 months to 84 months).

Snow-clearing services

Zarząd Dróg Powiatowych | Published April 13, 2016  -  Deadline June 28, 2016
cpvs
90620000, 90630000, 90610000

The contract was divided into five partial tasks:

Task No. 1 - Provision of the winter maintenance of district roads snowplow and charger

Task 2 - Snow removal county roads in the county Starachowice grader

Task 3 - Snow removal county roads in the county Starachowice charger

Task No. 4 - Snow removal county roads in the county Starachowice plow heavy two-sided

Problem # 5 - Services winter maintenance of bridges.

Provision of services on the task 1,2,3,4, will take place the call depending on the road conditions, the disposal of the Purchaser (Duty winter road maintenance) contractor after the telephone call by the customer substitutes equipment. Substituted equipment must be ready to take immediate action active (technically, tanked) All costs shall be borne by the Contractor.

Contractor substituting equipment must be prepared to work on a continuous basis until further notice.

The Contractor shall ensure hour room service equipment by a corresponding amount of change operators with a telephone connection.

In the event of stable weather conditions Employer suspends share of winter road maintenance - in case of weather changes will restore it on the same terms, including financing conditions.

In addition, the scope of the order for task 1 enters pozimowe cleaning streets and county roads.

Task 5 - Winter maintenance of bridges is based on gradual clearing snow

and elimination of slipperiness on the sidewalks for pedestrians, prop open drainage system bridges.

The boundaries of the bridges define the outer edges of the casing cones (the ends of the wings of the bridge)

Usprzątnięty snow must be removed outside the bridge.

The contractor will be making own decisions in the field:

- The type and quantity of equipment used;

- Snow removal and how to combat slipperiness.

Starachowice: Repair of the surface ul. Common in Starachowice

Gmina Starachowice | Published July 26, 2016  -  Deadline July 21, 2016
Winner
GROCHBUD II Sp. z o.o., ul. Żytnia 31/106, 27-200 Starachowice, kraj/woj. świętokrzyskie.
cpvs
45233140

Common No. 6D in Starachowice. The scope of work includes (bill of quantities): work measuring the earthworks - 317,00 m2, earthworks - korytowanie the export of ore - 126,90 m3, profiling and compacting the ground beneath layers of pavement structures - 291,20 m2, incorporating concrete curb ( 15 x 30 cm) on the concrete bench with difficulty (11,53m3), ballasted cement-sand 1: 4 - 170,80 m (including lying 50 m), the execution of road base (cut-off layer of sand stabilized with cement Rm = 2.5 MPa - 8 cm layer of a mixture of aggregate 0 - 63 mm - 20 cm) - 291,20 m2 3 cm, packed with sand joints - 291,20 m2, 2 other work for the implementation of the contract works, cleaning within and adjacent to the project implemented, including the repair of damaged during the work surface of the cobblestones at the crossroads. The contractor is required before bidding to read the terrain on which the project will be the subject of the order. Created as part of the offer price, among others, should ensure: surveying services works including: Geodetic demarcation facility in the area, activities surveying in the course of construction, project approved traffic organization, for the duration of the renovation works, the organization and securing the construction site, as well as perform other reasonably foreseeable, under the rules, actions that may occur in connection with the robots, ordering the site after the completion of the works and possible payment of compensation for damage caused as a result of the works or in connection with them. offered warranty period for work performed (from 60 months to 84 months).

Snow-clearing services

Zarząd Dróg Powiatowych | Published July 28, 2016
Winner
Firma Usługowo-Remontowo-Budowlana EUROFACH Anna Kubiak
cpvs
90620000, 90630000, 90610000

The contract was divided into five partial tasks:

Task No. 1 - Provision of the winter maintenance of district roads snowplow and charger

Task 2 - Snow removal county roads in the county Starachowice grader

Task 3 - Snow removal county roads in the county Starachowice charger

Task No. 4 - Snow removal county roads in the county Starachowice plow heavy two-sided

Problem # 5 - Services winter maintenance of bridges.

Provision of services for task 1, 2, 3, 4, will take place the call depending on the road conditions, the disposal of the Purchaser (Duty winter road maintenance) contractor after the telephone call by the customer substitutes equipment. Substituted equipment must be ready to take immediate action active (technically, tanked) All costs shall be borne by the Contractor.

Contractor substituting equipment must be prepared to work on a continuous basis until further notice.

The Contractor shall ensure hour room service equipment by a corresponding amount of change operators with a telephone connection.

In the event of stable weather conditions Employer suspends share of winter road maintenance - in case of weather changes will restore it on the same terms, including financing conditions.

In addition, the scope of the order for task 1 enters pozimowe cleaning streets and county roads.

Task 5 - Winter maintenance of bridges is based on gradual clearing snow

and elimination of slipperiness on the sidewalks for pedestrians, prop open drainage system bridges.

The boundaries of the bridges define the outer edges of the casing cones (the ends of the wings of the bridge)

Usprzątnięty snow must be removed outside the bridge.

The contractor will be making own decisions in the field:

- The type and quantity of equipment used;

- Snow removal and how to combat slipperiness.

Starachowice: Repair of the pavement at the Hotel Senator Starachowice

Gmina Starachowice | Published July 26, 2016  -  Deadline July 26, 2016
Winner
GROCHBUD II Sp. z o.o., ul. Żytnia 31/106, 27-220 Starachowice, kraj/woj. świętokrzyskie.
cpvs
45233140

Krywki in Starachowice real estate along the Senator Hotel. The scope of work includes (bill of quantities): 1) Demolition works with the export of debris to the point of use or disposal: + asphalt paving covered with asphalt - 93.1 m2, concrete paving - 166 m2, paving the rim (14,1m) - 45.6 m2, concrete curbs - 106.3 m, edging the lawn - 62.75 m, 2) Removal of shrubs with roots żywopłotowych - 41 mb. 3) Excavation - korytowanie the export of ore - 63 m3. 4) Profiling and density of the surface layer of the pavement structure - 315 m2. 5) Incorporation of concrete curb (15 x 30 cm) on the concrete bench with difficulty 3 cm - 95.3 m (including the two meetings curb lying - 17 mb). 6) Placing concrete edges lawn (6 x 20 cm) on the ballast cement-sand 1: 2, filled with cement mortar joints (15 + 28 + 8 x 0.5 + 17 + 5) - 69 mb. 10 cm for mechanical stability) - 315 m2. 3 cm, packed with sand seams - 272 m2. 3 cm, packed with sand joints (213.5 x 0.2 m) - 43 m2. 10) Performing other work in order to carry out the contract. 11) Construction of cleaning within and adjacent to the project implemented, including the repair of damaged during the construction of bituminous pavement roadway and humusowanie green belt removed after hedge (17 m2). The contractor is required before bidding to read the terrain on which the project will be the subject of the order. Created as part of the offer price, among others, should ensure: 1. surveying services works including: Geodetic demarcation object in the field, surveying activities in the course of construction, the second project approved traffic organization, for the duration of the renovation works, 3. organization and protect the construction site, as well as the performance of other possible predictably, under the regulations, actions that may occur in connection with the robots, 4. organize the site after the completion of the works and possible payment of compensation for damage caused as a result of the works or in connection with them. 5. offered warranty period for work performed (from 60 months to 84 months). The contractor will be required to agree duration of the works performed in the area of ​​entries with the administration of Senator Hotel.
  • 1