Public tenders for cleaning in Krosno-odrzanskie Poland

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!
CleaningPolandkrosno-odrzanskie

Accommodation, building and window cleaning services

Jednostka Wojskowa 5286 | Published February 12, 2015
Winner
Mixon Paweł Laskowski
cpvs
90911000, 90000000

The contract is to maintain the cleanliness of the rooms and outdoor areas, removing ice and snow from the roofs of buildings, objects and military areas administered by the Military Unit 5286 in the following towns: - Czerwieńsk - Krosno - Novgorod Bobrzański - Sulechów - Zielona Gora - radnica. The range of services includes the following: - cleaning of premises in buildings, - maintaining order in the external areas ie. Of paved surfaces, green, earth, - maintaining order in the external areas during the winter - snow removal and removal of roof icicles from roofs. a) Surfaces and frequency of services to maintain order for the individual military facilities in the villages determine the tender forms (Annexes 19, 20, 21, 22, 23, 24), and lists of surface cleaning: - Appendices 1, 2, 3 - Czerwieńsk - Attachments No. 4, 5, 6 - Krosno, - Annexes 7, 8, 9 - Novgorod Bobrzański, - Annexes 10, 11, 12 - Radnica, - Annexes 13, 14, 15 - Sulechów, - Annexes No. 16, 17, 18 - Zielona Gora present terms of reference.

Accommodation, building and window cleaning services

44WOG | Published November 24, 2015  -  Deadline January 4, 2016
cpvs
90911000

The contract is for the provision of maintenance services clean and tidy interior surfaces and exterior objects in units and military institutions located in the territory administered by the Military Department of Economic 44 Krosno in the villages: Czerwieńsk, Krosno, Novgorod Bobrzański, Radnica, Sulechów, Zielona Gora. Maintaining the cleanliness of the premises and outdoor areas, removing ice and snow from the roofs of buildings, objects and military areas administered by the 44 Military Department of Economic in the villages: - Czerwieńsk - Krosno - Novgorod Bobrzański - Radnica - Sulechów - Zielona Gora. The scope of services includes the following: - cleaning of premises in buildings, - maintaining order on the outdoor grounds, ie. Surfaces paved, green, earth - maintaining order in areas outside during the winter - snow removal, roofing and removing icicles from roofs. The Employer will split an order of 6 parts: - Part 1 - Czerwieńsk - Part 2 - Krosno - Part 3 - Novgorod Bobrzański - Part 4 - Radnica - Part 5 - Sulechów Sulechów - Parish - Part 6 - Zielona Gora. A detailed description of the contract - Appendix 1.

Office cleaning services

44 WOG | Published November 18, 2016  -  Deadline December 22, 2016
cpvs
90919200, 90910000

The contract is for the provision of services of cleaning the interior surfaces of buildings, the outer surface hardened and maintenance of green areas in units and military institutions located in the area administered by the 44 Military Department of Economic Krosno in the villages: Czerwieńsk, Krosno, Novgorod Bobrzański, Radnica, Sulechów, Green Mountain.

The Employer divided the contract into 6 parts:

1. Part I of the contract

Czerwieńsk

2. Part II Order

Krosno

3. Part III Order

Novgorod Bobrzański

4. Part IV orders

radnica

5. Part V of contract

Sulechów + Parish

6. Part VI of contract

green Mountain

A detailed description of the order in Appendix 1 hereto.

Accommodation, building and window cleaning services

44WOG | Published November 26, 2015  -  Deadline January 4, 2016
cpvs
90911000

Usługi sprzątania/czyszczenia miejsc noclegowych, budynków i okien

Krosno: Repair of the district road No. 1959 Szczepańcowa - Brand

Powiat Krośnieński reprezentowany przez Zarząd Powiatu Krośnieńskiego | Published August 17, 2016  -  Deadline August 17, 2016
Winner
Rejon Budowy Dróg i Mostów w Krośnie Sp. z.o.o., ul. Tysiaclecia 38, 38-400 Krosno, kraj/woj. podkarpackie.
cpvs
45233220, 45100000

The subject of the order: Repair of the district road No. 1959 Szczepańcowa - Brand at km 2 + 670 - 3 + 770. Intended scope of works: - decapitation and complement roadsides aggregate broken, - the mechanical alignment of the substructure blend of mineral - asphalt - carrying the surface out of mineral - asphalt (surfacing) - cleaning of drainage ditches - repair culverts ..

Krosno: Repair of the district road No. 1959 Szczepańcowa - Brand

Powiat Krośnieński reprezentowany przez Zarząd Powiatu Krośnieńskiego | Published July 27, 2016  -  Deadline November 15, 2016
cpvs
45233220, 45100000

The subject of the order: Repair of the district road No. 1959 Szczepańcowa - Brand at km 2 + 670 - 3 + 770. Intended scope of works: - decapitation and complement roadsides aggregate broken, - the mechanical alignment of the substructure blend of mineral - asphalt - carrying the surface out of mineral - asphalt (surfacing) - cleaning of drainage ditches - repair culverts.

Krosno: Redevelopment of the district road No. 1993 Sulistrowa - Draganowa - Głojsce with the construction of the pavement in m. Głojsce

Powiat Krośnieński reprezentowany przez Zarząd Powiatu Krośnieńskiego | Published July 21, 2016  -  Deadline December 15, 2016
cpvs
45233220, 45100000, 45233260

As part of the contract is planned to strengthen the performance of pavement at km 0 + 000 - 2 + 450 and km 3 + 180 - 4 + 800 and the construction of section of pavement at km 5 + 360 - 5 + 660 m. Głojsce. Intended scope of works: - decapitation and complement roadsides aggregate broken, - mechanical alignment aggregate base course, - carrying the surface out of mineral - asphalt (surfacing) - cleaning of drainage ditches, - construction of pavement in m. Głojsce - strengthening embankments. Category of traffic on the road No. 1993 - KR3.

Krosno: Redevelopment of the district road No. 1993 Sulistrowa - Draganowa - Głojsce with the construction of the pavement in m. Głojsce

Powiat Krośnieński reprezentowany przez Zarząd Powiatu Krośnieńskiego | Published August 23, 2016  -  Deadline August 16, 2016
Winner
STRABAG Sp. z o.o., ul. Parzniewska 10, 05-800 Pruszków, kraj/woj. mazowieckie.
cpvs
45233220, 45100000, 45233260

The contract: Redevelopment of the district road No. 1993 Sulistrowa - Draganowa - Głojsce with the construction of the pavement in m. Głojsce. As part of the contract is planned to strengthen the performance of pavement at km 0 + 000 - 2 + 450 and km 3 + 180 - 4 + 800 and the construction of section of pavement at km 5 + 360 - 5 + 660 m. Głojsce. Intended scope of works: - decapitation and complement roadsides aggregate broken, - mechanical alignment aggregate base course, - carrying the surface out of mineral - asphalt (surfacing) - cleaning of drainage ditches, - construction of pavement in m. Głojsce - strengthening slopes ..

Redevelopment of the district road No. 1940 Przybówka - PIETRUSZA WOLA - Rzepnik - Bratkówka at km 9 + 100 to 11 + 100.

 | Published October 30, 2014  -  Deadline November 14, 2014
cpvs
45233140, 45233220

The contract is: Reconstruction of county road No. 1993 Przybówka - Pietrusza Will - Rzepnik, Podkarpackie Voivodeship - Bratkówka at km 9 + 100 to 11 + 100. The proposed scope of works: - executing the foundation (the alignment of the existing frameworks, profiling and compacting the ground beneath you in-design, executing the foundation of soil stabilized, executing the foundation of crushed stone), - cleaning of drainage ditches, - making roads (binding layer and the wearing-wa) - made from crushed stone shoulders. Category of traffic on the road No. 1940 - KR3 detailed description of the elements of the contract are attachments: Project documentation - Annex 7 to the Terms of Reference Bill of quantities - Appendix 8 hereto Detailed Technical Specification Execution and Acceptance of Construction Works - nr9 Annex hereto.

Krosno: Repair ul. Kosciuszko in Krosno

Gmina Miasto Krosno | Published August 31, 2016  -  Deadline August 10, 2016
Winner
Strabag Sp. z o.o., ul. Parzniewska 10, 05-800 Pruszków, kraj/woj. mazowieckie.
cpvs
45233142, 45233222

As part of the renovation ul. Kosciuszko is expected to: - construction equipment - inventory-built; - Demolition works: concrete curb - 200 m, paving stones - 120 m2 and bitumen - 90 m2, edging debit cards - 32 m; - Execution elements streets concrete curbs the bench - 215 m, edging concrete on the bench - 32 m, the regulation of underground wells - 13 pcs., Pavement with cobblestones - 90 m2, przebrukowanie pavement from the bone - 120 m2; - Surface works: cleaning and sprinkling the pavement - 1250 m2, milling - 1250 m2, binding layer from the surface of mineral bitumen AC-16W - 1250 m2 wearing course of pavement bitumen mineral AC-11S - 1250 m2. In the implementation of this contract, the contractor is also obliged to comply with: a) the inventory-built, b) the protection and marking the site works in accordance with the applicable instructions and regulations, c) clean up the area after the completion of the works.

Krosno: Execution of construction works on the reconstruction and modernization of existing gas boiler with the replacement of the gas in the building at ul. Wyspiańskiego 20 in Krosno

Państwowa Wyższa Szkoła Zawodowa im. Stanisława Pigonia w Krośnie | Published August 16, 2016  -  Deadline August 4, 2016
Winner
NOVUM Centrum Techniki Grzewczej i Sanitarnej Markiewicz Stanisław, ul. Miesowicza 2, 38-400 Krosno, kraj/woj. podkarpackie.
cpvs
45000000, 45111100, 45262500, 45300000, 45310000, 45330000, 45332200, 45332400, 45421000, 45442100, 45450000

The scope of the project includes: a) Removing an existing installation of internal gas, and perform a new installation for the supply of two gas condensing boilers with a heat output of 240 kW. b) housing the gas gypsum cardboard with them to filling and painting (reproduction), b) Reconstruction of the existing gas boiler including: - removal of existing boilers with fittings, - the execution of construction works, ie. skuciu foundation in the exchanger, supplement plaster, missing tiles flooring and wall coverings, painting walls, cleaning the existing tiles, replacement of 2 pcs. door, completing the expedition facade, - installation of 2 pcs. gas boilers with installations and automation, - dismantling the existing electrical wiring, installation of new electrical switchboards, and the installation - installation stainless steel chimney.

Krosno: Execution of construction works on the reconstruction and modernization of existing gas boiler with the replacement of the gas in the building at ul. Wyspiańskiego 20 in Krosno.

Państwowa Wyższa Szkoła Zawodowa im. Stanisława Pigonia w Krośnie | Published July 18, 2016  -  Deadline September 15, 2016
cpvs
45000000, 45111100, 45262500, 45300000, 45310000, 45330000, 45332200, 45332400, 45421000, 45442100, 45450000

The scope of the project includes: a) Removing an existing installation of internal gas, and perform a new installation for the supply of two gas condensing boilers with a heat output of 240 kW. b) housing the gas sheets of plasterboard with them to filling and painting (reproduction), b) Reconstruction of the existing gas boiler including: - removal of existing boilers with fittings, - the execution of construction works, ie. skuciu foundation in the exchanger, supplement plaster, missing floor tiles and wall tiles, painting walls, cleaning the existing tiles, replacement of 2 pcs. door, completing the expedition facade, - installation of 2 pcs. gas boilers with installations and automation, - dismantling the existing electrical wiring, installation of new electrical switchboards, and the installation - assembly chimney stainless steel ..

Reconstruction of the road side of ul. Heroes Westerplatte Krosno along with the construction of the parking spaces (access to the swimming pool).

 | Published October 13, 2014  -  Deadline October 28, 2014
cpvs
45233222, 45233142

The scope of tasks includes: - demolition and earthworks, - surface works: cleaning paving - 235.00 m2 - sprinkling the surface with asphalt - 235.00 m2 - positioning grid - geocomposite under layers of asphalt - 235.00 m2, 4 cm - 235,00 m2 - profiling and compaction of the ground under the pavement structural layers - 176,81 m2, 15 cm - 176,81 m2, 15 cm - 176,81 m2, 4 cm - 176,81 m2 - profiling and compaction of the ground the structural layer surface - 109.50 m2, 30 cm - 109,50 m2, 20 cm - 109,50 m2 - hollow slabs 04x0,6x01 m - 109.50 m2 - mechanical milling asphalt pavement - 728,60 m2, - cleaning of paving - 2 428.65 m2 - sprinkling the surface with asphalt - 4 857.30 m2, 2 cm - 2 428.65 m2, 4 cm - 2 428.65 m2, 20 cm - 9.90 m2, 6 cm cube gray - 9.90 m2 - making curb 15x30 cm on the concrete bench - 304.50 m, - storm water drainage: earthworks - excavation for the sewer - 3.84 m3, - full of strengthening the walls of the trench - 19,20 m2, 10 cm - 0.32 m3, - gullies Fi 500 mm - 2.00 pc., - channels of PVC pipes fi200 mm - 8.00 m, - backfilling - 3.52 m3, - compaction of embankments - 3.52 m3 . In the implementation of this contract, the contractor is obliged also to perform: a) securing and marking the work site in accordance with the applicable instructions and regulations, b) clean up the area after the completion of the works.

Snow-clearing services

Gmina Miasto Krosno | Published November 20, 2015
Winner
Zakład Transportu i Budowy Dróg, Mieczysław Białowąs
cpvs
90620000, 90630000

Episode I - The winter maintenance of sidewalks and roads: provincial, district, commune in the city of Krosno: 1) winter road maintenance of provincial roads, county and municipal level; 2) winter maintenance of sidewalks; 3) The winter maintenance of walkways, stairs and approaches; Clearing snow, combat black ice and slippery winter are also subject to bus bays and the intersection of these roads with internal streets at length to the edge of the pavement; 5) setting the hurdles przeciwśnieżnych (on behalf of the Employer); 6) maintaining hour standby (on-call) to take action winter maintenance; 7) clearing of snow and fighting the slipperiness on the sidewalks, platforms, bus stops, pedestrian crossings, stairs and walkways for pedestrians and removal of ice, mud and other contaminants; 8) cleaning of drains during the thaw; 9) setting with sand boxes (boxes at the disposal of the Employer); 10) collection and removal of snow from the streets and squares (on behalf of the Employer). Part II - winter maintenance of the national road No. 28: 1) winter road maintenance of national road No. 28 - section with a length of 11.4 km; 2) snow removal; 3) combat black ice and slippery pośniegowej; 4) removal of ice, slush and other pollutants; 5) maintaining hour standby (on-call) to take action winter maintenance; 6) the collection and removal of snow (on behalf of the Employer). In the implementation of this contract, the contractor is also required to comply with: a) the protection and marking the work site in accordance with the applicable instructions and regulations; b) clean up the area after the completion of the works; c) the transfer of the Purchaser in writing daily reports of completed tasks associated with winter maintenance.

Snow-clearing services

Gmina Miasto Krosno | Published September 11, 2015  -  Deadline October 19, 2015
cpvs
90620000, 90630000

Episode I - The winter maintenance of sidewalks and roads: provincial, district, commune in the city of Krosno: 1) winter maintenance of roads of regional, district and communal, 2) winter maintenance of sidewalks, 3) winter maintenance of walkways, stairs and approaches, clearing snow, combat black ice and slippery winter are also subject to bus bays and the intersection of these roads from the streets internal to the length of the edge of the pavement, 5) setting the hurdles przeciwśnieżnych (on behalf of the Employer), 6) maintaining hour standby (on-call) to take action winter maintenance, 7) snow removal and fighting slipperiness on the sidewalks, platforms, bus stops, pedestrian crossings, stairs and walkways for pedestrians and removal of ice, mud and other contaminants, 8) cleaning of drains during the thaw, 9), setting the boxes with sand (chests at the disposal of the Employer), 10 ) collection and removal of snow from the streets and squares (on behalf of the Employer), Part II - winter maintenance of the national road No. 28: 1) winter road maintenance of national road No. 28 - section with a length of 11.4 km 2) snow removal, 3) combat black ice and slippery pośniegowej, 4) removal of ice, slush and other contaminants, 5) maintaining hour standby (on-call) to take action winter maintenance, 6) collection and snow removal (on behalf of the Employer). In the implementation of this contract, the contractor is obliged also to be carried out: a) securing and marking the work site in accordance with the applicable instructions and regulations, b) clean up the area after the completion of the works, c) transferring the Purchaser in writing daily reports of completed tasks associated with winter maintenance.

Krosno: PROCEDURE TENDER OPEN with an estimated value below the amount specified in the regulations issued under Art. 11 UST. 8 ACT PZP WORKS - RENOVATION OF ROOMS BUDGET. NR 1 WSzW in Zielona Gora. CASE NO: 55 / PN / 2016.

44 Wojskowy Oddział Gospodarczy | Published August 12, 2016  -  Deadline August 10, 2016
Winner
GIW M. Lisowska, A. Paradowski s.c., ul. Mrągowska 2, 65-548 Zielona Góra, kraj/woj. lubuskie.
cpvs
45000000, 45453000

The subject of the contract is works - renovation of the premises of the building No. 1 WSzW in Zielona Gora. Renovation of the rooms of the building consists of exchanging wooden window frames on the ground floor, first floor, window grilles. Due to the mean degree of wear, replace the electrical system and lighting in the basement level. Perform the cleaning of the sewerage network outside of the area where the object is located. The scope of works includes: Forging of the wall of window - ground floor, p. Forging the wall window grilles on I p Installation of PVC window in white with sills external Execution and embedding new window grilles instructions and description of the Investor Execution of works of painting interior and outside the windows and in the basement Partial replacement of electrical wiring and fittings quantity survey by cleaning the sewage system external to the premises Removal and disposal of construction waste. A detailed description of the contract - Annex 1 Technical Requirements - Appendix 2 Takeoff - Appendix 3.

Krosno: TENDER FOR WORKS - THE ROOF REPAIR AND CONSTRUCTION shelters NR 42 STREET. PIASTÓW 7 in Krosno Odrzańskie. CASE NO: 41 / PN / 2016.

44 Wojskowy Oddział Gospodarczy | Published September 7, 2016  -  Deadline June 28, 2016
Winner
ZAKŁAD INSTALATORSTWA I BUDOWNICTWA OGÓLNEGO RADIATOR S.C. TADEUSZ ŚCIGAJ JERZY ŚCIGAJ, AL. ZJEDNOCZENIA 92, 65-120 ZIELONA GÓRA, kraj/woj. lubuskie.
cpvs
45000000

The subject of the contract is works - Repair of the roof and construction of shelters PTO No. 42 Street. Piastów 7 in Krosno Odrzańskie The scope of works includes: 1) Removing the cover of the trapezoidal sheet, 2) Replacement of damaged metal sheds, 3) Editing patches 4) Installation of roofing sheets 5) Cleaning and painting of construction sheds detailed order - Annex 1 Technical Requirements - appendix 2 Takeoff - appendix 3.

Krosno: PROCEDURE TENDER OPEN with an estimated value below the amount specified in the regulations issued under Art. 11 UST. 8 ACT PZP WORKS - REPAIR DOORS AND VENTILATION BUDGET. NO 12 AND REPAIR OF THE ROOF, FLOOR AND WALL BUILDING NO 78 RADNICY. CASE NO: 59 / PN / 2016.

44 Wojskowy Oddział Gospodarczy | Published August 17, 2016  -  Deadline August 17, 2016
Winner
PPHU TOMA TOMASZ PATRYK JASKULSKI, UL. BOROWSKIEGO 28, 66-400 GORZÓW WIELKOPOLSKI, kraj/woj. lubuskie.
cpvs
45000000

The subject of the contract is works - repair of doors and ventilation in the house. 12 and repair the roof, floor and walls in the house. No. 78 in Radnicy. The scope of work to be carried out includes: Building 12 1) Removal of the gates, 2) Installation and manufacture of gates, 3) Replacement of ventilation. Building No. 78 1) Removing the roof and walls made of sheet metal, 2) Replacement of damaged metal, 3) Installation of patches, 4) Installation of roof and walls of corrugated galvanized coated, 5) Cleaning and painting of steel structure and doors, 6) Replacement windows 7) Repair of floors, 8) Repair band building. A detailed description of the contract - Annex 1 Technical Requirements - Bills of Appendix 2 - Appendix 3.

Krosno: PROCEDURE TENDER OPEN with an estimated value below the amount specified in the regulations issued under Art. 11 UST. 8 ACT PZP WORKS - REPAIR DOORS AND VENTILATION BUDGET. NO 12 AND REPAIR OF THE ROOF, FLOOR AND WALL BUILDING NO 78 RADNICY. CASE NO: 59 / PN / 2016.

 | Published July 12, 2016  -  Deadline July 27, 2016
cpvs
45000000

The subject of the contract is works - repair of doors and ventilation in the house. 12 and repair the roof, floor and walls in the house. No. 78 in Radnicy. The scope of work to be carried out includes: Building 12 1) Removal of the gates, 2) Installation and manufacture of gates, 3) Replacement of ventilation. Building No. 78 1) Removing the roof and walls made of sheet metal, 2) Replacement of damaged metal, 3) Installation of patches, 4) Installation of roof and walls of corrugated galvanized coated, 5) Cleaning and painting of steel structure and doors, 6) Replacement windows 7) Repair of floors, 8) Repair band building. A detailed description of the contract - Annex 1 Technical Requirements - Bills of Appendix 2 - Appendix 3.

Krosno: PROCEDURE TENDER OPEN with an estimated value below the amount specified in the regulations issued under Art. 11 UST. 8 ACT PZP WORKS - PAINTING staircases BUILDING KITCHEN-cafeteria AND EXCHANGE OF DOORS INTERNAL STREET. POLISH ARMY 1 in Sulechów. CASE NO 80 / PN / 2016.

44 Wojskowy Oddział Gospodarczy | Published September 5, 2016  -  Deadline August 25, 2016
Winner
MS BUDOWNICTWO SP.J. MACIEJ STOCKI MICHAŁ STOCKI, UL. ZAKĄTEK 14, 67-100 NOWA SÓL, kraj/woj. lubuskie.
cpvs
45110000, 45000000, 45450000, 45442100, 45421131

The contract works are painting the stairwells in the building of the kitchen-cafeteria and replacement of internal doors in 4408 JW Street. Polish Army 1 in Sulechowie. The scope of works includes: 1. Dismantling of tiles on the stairwells. 2. Removing the paneling, wiping plaster and execution strokes. 3. Preparation of rooms and staircases to paint. 4. Preparation of wall and ceiling surfaces for painting. 5. Painting of ceilings and walls with emulsion paints. 6. Preparation of the surface plaster resin 7. Implementation of plaster, resin 8. Double-painting with oil paint door woodwork and railings with decorative rods 9. Double-painting with oil paint radiators 10. Replacement of lighting fixtures 11. Replacing light switches 12. insert the inner door to the premises of the canteen and the kitchen. 13. Cleaning after repair works. 14. Removal of debris after the repair works and their disposal. A detailed description of the contract - Annex 1 Technical Requirements - Appendix 2 Takeoff - Appendix 3.