Public tenders for cleaning in Kluczbork Poland

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!

Maintenance of sewage treatment plants in the following towns smardy górne, New Bogacica, smardy dolne, Bogacka Greenhouse, Unieszów, Żabiniec, Krężel and Bogacica, Borkowice, Bażany and Maciejów, Biadacz, curvature.

 | Published December 8, 2015  -  Deadline December 23, 2015
cpvs
90480000

Object of the contract includes comprehensive servicing performed by the Contractor aimed at maintaining the proper technical condition 365 sewage treatment plants built in the following towns smardy górne, New Bogacica, smardy dolne, bogacka szklarnia, Unieszów, Żabiniec, Krężel and Bogacica, Borkowice, Bażany and Maciejów , Biadacz, curvature. Comprehensive maintenance services will be carried out in accordance with the instructions of the manufacturer and include, among others: 1. Adjust the status of the sludge in a septic tank. 2. Check the amount of sludge in a septic tank. 3.Czyszczenie scum of the filter in a septic tank. 4.Kontrola of ventilation septic tank. 5.Usunięcie excess sludge from the septic tank. 6.Sprawdzenie operation and cleaning of air-lift. 7.Kontrola status and secondary settling tank cleaning chamber. 8.Kontrola state, cleaning aeration and fittings. 9.Kontrola condition and cleaning deposits submerged. 10.Kontrola the solenoid valve (adjustable settings in the controller). 11.Demontaż blower (blower) chamber technology - cleaning the air filter. 12.Wymiana air filter. 13.Kontrola state membrane cleaning (blower). 14.Wymiana membrane blowers. 15.Kontrola condition and cleaning of diffusers. 16.Wymiana membrane diffusers. 17.Kontrola state, cleaning the air inlet. 18.Kontrola state soakaway. 19.Dotyczy sewage treatment plants the company Kessel: a) compressor - assessment of the state, replacement and filter cleaning, replacement of membranes or whole repair kit; b) The initial sediment - measuring the height of the sludge (sludge assess the frequency of exports); c) activated sludge - a preliminary assessment of the condition of the sludge - a change driver settings or additional middle of chemicals; 20.Przebudowa sewage system in accordance with the specified bill of quantities. List of sewage treatment plants contains est. No. 1 to the ToR ..

Maintenance of sewage treatment plants in the following towns smardy górne, New Bogacica, smardy dolne, Bogacka Greenhouse, Unieszów, Żabiniec, Krężel and Bogacica, Borkowice, Bażany and Maciejów, Biadacz, curvature.

 | Published December 4, 2014  -  Deadline December 19, 2014
cpvs
90480000

Object of the contract includes comprehensive support services provided by the Contractor to maintain in good condition 354 sewage treatment plants built in the following towns Smardy Górne, New Bogacica, Smardy Dolne, Bogacka Greenhouse, Unieszów, Żabiniec, Krężel and Bogacica, Borkowice, Bażany and Maciejów , Biadacz, curvature. Comprehensive maintenance services will be carried out in accordance with the instructions of the manufacturer and include: 1. Checking the status of the sludge in a septic tank. 2. Check the amount of sediment in a septic tank. 3. Clean the filter sludge in a septic tank. 4. Control of ventilation septic tank. 5. Removal of excess sludge from the septic tank. 6. Check operation and cleaning of air-lift. 7. Check the condition and cleaning of the secondary settling chamber. 8. Control of the state, cleaning aeration and fittings. 9. Inspection of submerged and cleaning deposit. 10. Control of the solenoid valve (adjustable settings in the controller). 11. Removing the fan (blower) inside the technical - cleaning the air filter. 12. Replacing the air filter. 13. Inspection of membrane cleaning (blower). 14. The exchange membranes blower. 15. Inspection of and cleaning diffusers. 16. The exchange membrane diffusers. 17. Inspection of, cleaning the air intake. 18. Checking the soakaway. 19. applies sewage treatment plants Kessel company: a) compressor - assessment of the state, replacement and filter cleaning, replacement of membranes or the entire repair kit; b) The initial settlements - measuring the height of the sediment (sediment export to assess the frequency); c) activated sludge - a preliminary assessment of the condition of sediment - change driver settings or additional chemical middle; 20. Reconstruction of the sewage system in accordance with the bill of quantities indicated. List of sewage treatment plants contains est. No. 1 to the ToR ..

Snow-clearing services

Powiat Kluczborski | Published October 27, 2015
Winner
Przedsiębiorstwo Transportowo-Handlowe „Noczyński” Sp. z o.o.
cpvs
90620000, 90610000, 90630000, 63000000

The contract is for winter maintenance of roads and provision of services related to winter maintenance of district roads in the county Kluczborski winter seasons 2015/2016, 2016/2017, 2017/2018 and 2018/2019. The contract covers the provision of hardware in terms of snow removal routes, combating slippery roads Kluczborski county, loading, execution and maintenance of a mixture of sand and salt as well as cleaning uprzątnięciu consisting of a mixture of sand from the roadway and drainage well settlers.

Snow-clearing services

Powiat Kluczborski | Published August 12, 2015  -  Deadline September 18, 2015
cpvs
90620000

The contract is for winter maintenance of roads and provision of services related to winter maintenance of district roads in the county Kluczborski winter seasons 2015/2016, 2016/2017, 2017/2018 and 2018/2019. The contract covers the provision of hardware in terms of snow removal routes, the fight against slipperiness on the roads the county Kluczborski, loading, execution and maintenance of a mixture of sand and salt as well as cleaning uprzątnięciu consisting of a mixture of sand from the roadway and drainage well settlers.

Construction of sewage treatment plants in the municipality Kluczbork - stage II

 | Published December 9, 2014  -  Deadline December 30, 2014
cpvs
45252127, 45000000, 45111200, 45232421, 39350000, 45310000

The contract is for the construction of 11 sewage treatment plants set in the municipality Kluczbork in the following towns: 1. Żabieniec- Little Castle, 2. Bogacka Greenhouse, 3. New Bogacica, Smardy Górne 4., 5. Bogacica - Krężel, 6. Smardy Dolne. Detailed scope of work and the manner of their execution is specified in the project documentation, the bill of quantities and specifications of the technical implementation and acceptance of works developed for the purposes of this order. Confirmation of this requirement is to identity documents for full product test report confirming compliance with the harmonized European standard EN 12566-3: 2005 + A1: 2009 is issued for a specific range of facilities solely for the laboratory notified by the European Commission. Having the above document is unambiguous marking the product with the CE mark. The list of individual parcels, which will be installed is in the technical documentation. 3. Object of the contract include: 1) The purchase, delivery, installation, connection and commissioning of 11 pieces PBOŚ, along with the appropriate way to discharge treated wastewater, bedside control or ventilation system, sewage treatment, in accordance with the timetable set by the Employer, 2) the performance of all Plumbing -kanalizacyjnych, electrical and ventilation of the building to the PBOŚ necessary for the proper operation of the treatment plant, 3) the purchase, delivery, installation, connection and commissioning of pumping station in cases where it is necessary for the proper operation of wastewater treatment, 4) maintenance facilities construction, 5) work disassembly, replacement, cleaning necessary for the implementation of the contract, 6) to ensure proper supervision and safety and health at work, 7) maintain the construction site free from obstacles to communication, and keep the unnecessary removal of materials, waste and litter, 8) repair and bringing to its original state in the event of any damage or injury arising in the course of implementation, 9) provide training for all users PBOŚ, on how to use and prepare and submit a detailed manual, 10) provide training for technicians PBOŚ, 11) trials end (including start-up technology) and supervision of operational trials, 984, as amended. d.). 984, as amended. d.) as for the cleaning of less than 2000 pe. 984, as amended. d.), as for the cleaning of less than 2000 pe. Contractor's bid offering the warranty period shorter than 10 years, will be rejected as incompatible with the Terms of Reference. 5. Detailed technical requirements PBOŚ: 1) Domestic sewage treatment plant, hereinafter also referred to sewage, a reservoir or device must be sequential biological reactor (SBR), consisting of one tank operating at fixed stages to which end up in the waste water purification program set adjusting to changes amount of waste water and pollution loads, 2) a sewage treatment plant must form a single monolithic container made of PE, wherein the individual chambers are separated without the use of welded or bonded components another technology in the later process after the entire tank rotary technology, 3) is not allowed use of metal hose clamps inside the vessel, 4) the solenoid valves must be located inside the tank and must be in hermetic or remain isolated from the environment in which the fumes are plants, valve plate due to the frequency and the working conditions must be made of stainless steel, 5-progressive and cover with gasket adapted to the conditions of negotiability in the area, 6) the total minimum capacity of the tank must be: for RLM from 1 to 6 - 4500 liters, the RLM from 7 to 10 - 7500 liters. 7) The strength and other parameters of the reservoir must be capable of mounting it to a depth of 5m, without the need for additional plates and relief elements, 8) the minimum thickness of the container must be 9 mm, 9), treatment should have a container for easy sampling, 10) to recycle waste water must be used aerial lifts (mammoth pump), 11) discharge of treated wastewater must be in accordance with the design assumptions dependent on the geological conditions on a given plot, 12) sewage treatment equipment must be maintenance-free for periods between services, ie. not require user intervention service intervals must be no more than once a year, 13), the device must be able to remove all the components in the wastewater treatment plant for cleaning and inspection without having to empty the entire tank, 14), treatment must be equipped with quick connect
  • 1