Call +44 800 9755 164

Public tenders for cleaning in Gorzow-wielkopolski Poland

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!

Ostrow Wielkopolski: Winter maintenance of sidewalks, bus stops and public squares in Ostrow Wielkopolski in the season 2016/2017

Miejski Zarząd Dróg | Published July 27, 2016  -  Deadline March 1, 2017
- Combating slippery winter (ice-crusted lodowicy, slippery pośniegowej, liquidation cartridge ice), - snow removal Snow removal of the squares and sidewalks - the preparation of chemicals (standardized mixtures), materials uszorstniających to relieve and remove the effects of winter - preparation of transport and equipment winter maintenance for any twenty-four hour on call, - patrolling the squares and sidewalks purpose control surface protection against black ice and rain, - managing all winter maintenance - pozimowe cleaning sidewalks and squares covered by the contract.

Gorzow Wielkopolski: hour Protecting People and Property Physical Theatre Julius Osterwa in Gorzow Wielkopolski. tender II

Teatr im. Juliusza Osterwy w Gorzowie Wlkp. | Published July 22, 2016  -  Deadline May 30, 2020
Hour Security Management Theatre. Julius Osterwa in Gorzow Wielkopolski. Maintaining a fully functional TV system supervise, perform maintenance facilities are located in buildings of the theater, in particular: - validating connections cameras with a recording device - cleaning lenses and camera housings - check the correct functioning of the recording equipment - performance quality cameras and possibly make corrections - Image archiving, recording a durable media ..

Ostrow Wielkopolski: Reconstruction of local road in the village Daniszyn, plot no. 1154, Municipality of Ostrow Wielkopolski. Greater

Gmina Ostrów Wielkopolski | Published July 19, 2016  -  Deadline October 30, 2016
Daniszyn, plot no. 1154. The contract scope includes - Road works: 1. Works measuring the linear earthworks - the route of roads in the plain area - 189,00 m 2 demolition work surface with tabloid - 690,00 m2 3. Laying of concrete curbs protrusions with dimensions of 15 x 22 cm - 183.00 m 4. drains rainwater drains II-IV - 721.16 m2 6. Restorations of soil stabilized with cement Rm = 1.5 MPa, layer thickness 10 cm - 721.16 m2 7. layer foundation of broken aggregates 0 / 31.5 mm thickness of 20 cm - 721.16 m2 8. the mechanical cleaning and sprinkling asphalt paving - 721.16 m2 5 cm - 706,00 m2 5 cm - 16 115.00 m2 -20 cm - material from the demolition - 467,00 m2 1. construction. The Contracting Authority requires the guarantee of quality and the extended warranty is made on the subject of the contract for a period of not less: than 60 months from the date of final acceptance. Warranty for defects and quality guarantee a) The Contractor shall be liable to the customer under the warranty for defects made object of the contract. b) Powers of the Employer under the warranty for defects expire after 60 months from the date of signing by the Employer Final Acceptance Protocol without comment. The responsibility of the Contractor under the warranty for defects of the Contract apply to defects existing at the time of the removal operations, as well as defects arising after delivery, for reasons inherent in the subject procurement at the time of delivery. d) The purchaser, in accordance with art.579 of the Civil Code may exercise the powers under the warranty for defects, regardless of the rights under the title granted by the contractor quality assurance. e) The Contractor's remuneration includes remuneration for granting the warranty for defects in the performance of obligations arising from the extended warranty. f) The Contractor shall be liable to the Purchaser under the guarantee of quality for the work performed constituting the object of the Agreement In the event that the warranty given by the manufacturer of materials, devices and pieces of equipment is longer than the warranty period by the Contractor, then the valid warranty, in which case the Contractor shall immediately after the warranty period granted to the Contractor, transfer to the Purchaser vested in him under this warranty rights, including through the issuance of relevant documents to the Employer warranty. g) The Contractor's remuneration includes remuneration for the guarantee of quality performance of obligations under the extended warranty. The contractor for the ongoing order is obliged to provide support geodesic notify owners install underground utilities to join the work, carrying out all the tests and trials, execution of built inventory, restoration of the site for construction
  • 1