Call +44 800 9755 164

Public tenders for cleaning in Keszthely Hungary

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!

And was associated EEOP 3.1.2 / 2F / ID No. 09-11-2013-0042 new project works "Festetics castle park of historical reconstruction" - Results of the procedure

Helikon Kastélymúzeum Közhasznú Nonprofit Kft. | Published November 30, 2015
Winner
Everling Városépítő Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45112711, 45236250

And on completion of the related EEOP 3.1.2 / 2F / ID No. 09-11-2013-0042 project "Festetics castle park of historical reconstruction" of new construction work in the following principal amounts and detailed in the tender documents: - Festetics Castle Park Pre-curved Gravity wall limestone balustrade kőrestaurálása: 52 m - Elderly Planting trees: 4 - Pre Garden fountain inside vertical wall insulation, and exterior carved stone with the renovation and restoration: 64 m2 - "Beer Factory" Replacing deep well submersible pump: 1 - Internal park small road trail modification works: 72 m2 - Increase Steel Edging construction works: 1354 m - Improving parter fountains existing stonework of restoration: 76 m2 - works on Parter large planter kővázákkal: 114 m2 - Cast iron candelabra stone posztamenseinek Restoration: 20 m2 - Pre garden, fountain, kosfejes vases újrafaragásának surplus Preparation: 2 - Lions external conserved well-house, cleaning the stone material stone facade restoration works: 158 m2 obligation of the Offeror and the necessary restoration plans elkészíttetése acceptance of the Heritage Office. Only restorer can perform after you enable the restoration plan for the following work: - Parter fountain, sand blasting, impregnating, - Pre Garden limestone balustrade renovation - Kosfejes vases újrafaragása - Parter large stone vase renovation - Lion well-house stone surface protection - Cast iron candelabra kőposztamenseinek renovation.

"A contract for" Reconstruction of Festetics Mausoleum "as part of the investment subject of the roof, cellar, basement floors and stairs to the implementation of reconstruction, according to the technical specifications

Helikon Kastélymúzeum Közhasznú Nonprofit Kft. | Published June 8, 2015
Winner
West Hungária Bau Kft.
cpvs
45000000, 45212314, 45453100, 45443000, 45261400, 71221000, 50532400

Monuments reference number: 10269 The tasks to be performed in the following technical specifications based on design documentation and unpriced budget provision # "Specifications Keszthely, St. Nicholas Cemetery Festetics Mausoleum renovation of the export plan" # "Festetics Mausoleum renovation of structures construction design" and # "Festetics Mausoleum Structures construction plan renovation of the technical specifications for construction design "# unpriced budget kiírás_Mauzóleum renovation. Construction-related question - under the existing historic building protection. Technical condition of the building: The most serious problem is the visible structures of concrete substructure material, which contains additives, which disintegrated over time. The restoration concept: The construction of the building crumbling around stairs and buttress staircase next to the expiry of such magnitude that the demolition and rebuilding of structures is required. Along with the other new master builder and stone work around the subject can be classified operations, for example. the new mortuary slab structure, insulation, creating new terrazzo flooring. Separate treated, however, the monument restoration can be classified activities, so keep terrazzo surfaces restoration (replacement, repair, surface treatment, coloring), production and placement of cast glass skylight panels, preparation and placement, signage gilt cast-iron trim elements. Breakdowns: Ending a step necessary to complete superstructure around the crypt, disintegrated after the foundation of the exploration, the state must declare the static designer. As part of this disclosure is not made, we can not make any concrete slab is located here, as we hope, or just plain brick trim. World Cup crypt above the lobby floor to the top plane during the entire vertical wall structures demolished the mausoleum with existing socket layer ground level. With the World Cup in the ceiling skylights bontandóak szerkezetükkel top plane. During the design of 1: 1 scale school surveys are not made, it is recommended to collect samples before the breakdown of the typical details. After the demolition of the customer, the technical inspector and designers, conservators on-site consultation should be carried out in the manner and details of the planned renovation of the necessary interventions. The demolition work is necessary before the skylights and stone construction company to check the dimensions included in the plan or make plans must be made by the Administration generáltervezőnek and conservation must be presented. During the design of 1: 1 scale school surveys are not made, it is recommended to collect samples before the breakdown of the typical details. After the demolition of the customer, the technical inspector and designers, conservators on-site consultation should be carried out in the manner and details of the planned renovation of the necessary interventions. These items allowed into the hull of the water inside the structure along the eaves and the expansion areas, which should be eliminated due to the further deterioration of the structure. Since under the eaves drainage mouths of monsters about, it can be assumed that the roof terrazzo surface is not flat, but collecting drips into the distorted surface. Insulation: The building minimal water retention is not the lack of insulation, only during the past 90 years of the expansion areas of today's modern expansion strips, flexible sausages can be used. Above the tomb slab is insulated against the rain water for safety reasons. Crypt above floor insulation: The insulation layers and a dimpled sheet müa supplemented, which will also host the artificial stone base concrete. Repair of plaster crypt: The fact that we keep the crypt of the plaster, or sometimes depressed moisture measurement before construction starts will decide. (Areas outside the walls of the coffin in the budget expect defeat of 50%) instead of the dejected air bag system PoroMap Mapei plaster mortar to build the order of layers and manufacturer's instructions. Decorated artificial stone portico structure: The sampling locations are also good condition of the concrete structure. Renovation of the structure of the surface cleaning, removal of surface cracks, and insulation layer felhordásából dyeing will be made up as required. During construction, excavations carried out: the demolition of the commencement of major construction at the same time necessary to measure the moisture content. It should also explore ceiling structure over the vaults handheld device. The dry-installed artificial stone battlements western highlight of the roof structure állapotána
  • 1