Call +44 800 9755 164

Public tenders for cleaning in Eger Hungary

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!

Cleaning and sanitation services

Heves Megyei Kormányhivatal | Published May 20, 2015
Winner
Emil és Társai Kft.
cpvs
90900000, 90911200, 90919200

Cleaning Services and hygiene supplies ordering the County Government Office for Violent.

Supply and sanitation to ensure protection of Heves County Government Office Building in office cleaning services.

Heves Megyei Kormányhivatal | Published October 9, 2014  -  Deadline November 19, 2014
cpvs
90900000, 90911200, 90919200

Cleaning services and hygiene products to the Order of Violent County Government Office.

"Within EEOP 3.1.2 / 2F / 09-11-2013-0011 number of projects, the Matra kétéltűátjárók baffle walls and establishing"

Bükki Nemzeti Park Igazgatóság | Published October 21, 2015
Winner
KV Építőipari Kereskedelmi és Szolgáltató Kft.
cpvs
45000000, 45233140, 45223800, 45111220, 45112700

KEOP number of framework-3.1.2 / 2F / 09-11-2013-0011 project, amphibian crossings and dividers establishment of Matra as follows: Kétéltűátjárók baffle walls and establishing the Matra Useful reservoir - NATURA 2000 areas and culverts designed for amphibious 1.Meglévő Gateways - 1 coverage of the existing culvert, culvert cleaning of 6 existing, head of training transformation, integration of maturing ramps - 12 new Gateway Building 100 cm diameter concrete pipes with a total length of 143 m. The culverts should back off and influence the árokmedret coated solar equipment at both ends of the passages LED light fixtures. Baffle construction of 50 cm height, 61 m long shuttering stone elements, putting complement the development lopsided wrapped in earthen deflector trench 1770 m length of an existing paved ditch fejgerendával and with cover 574 m installation length louvre in 4 to 20 m total length Housing Recovery Gyöngyösi Sástó - NATURA 2000 site first Existing culverts and planned amphibious crossings - 6 existing culvert cleaning of the head of training transformation, integration of maturing ramps - with 11 new Gateway Building 100 cm diameter concrete pipes with a total length of 130 m. The culverts should back off and influence the árokmedret coated solar equipment at both ends of the passages LED light fixtures. Design lopsided wrapped in earthen deflector trench addition to 2548 m length of an existing paved ditch fejgerendával and with cover 560 m installation length louvre four locations, 31 m total length ACO-PRO baffle screen wall placement of 82 m length Housing Recovery indicated in the above technical specification technologies, standards the same grade or equivalent quality technology, megajánlása standard acceptable to the bidders. 23.) Govt. Of Section 26, it contained.

Restaurant and food-serving services

Eger Megyei Jogú Város Önkormányzata | Published November 25, 2016  -  Deadline December 5, 2016
cpvs
55300000, 55500000, 55520000, 55523000

Eating out their public duties.

Based on 2015 data:

Primary school primary school supplies:

- Snacks: 154 682 doses / year

- Lunch: 282 412 doses / year

- Lunch: 154 682 doses / year.

Primary school top up supplies:

- Snacks: 83 291 doses / year

- Lunch: 152 068 doses / year

- Lunch: 83 291 doses / year.

High school and college supplies:

- Breakfast: 19 292 doses / year

- Lunch: 42 161 doses / year

- Dinner: 21 658 doses / year.

The raw material for the standard tuition fees to the prevailing local gov. According to Regulation (14/2007. No government).

Winning the task of ensuring, where necessary, dietetic food, 37/2014. According to (IV.30.) of the EMMI without quantitative limits.

Contractor is also responsible for the provision of services in connection with the disinfestation carried out in accordance with legal requirements, cleaning supplies, property and fire protection tasks and the necessary supplies, food preparation and delivery tasks.

Detailed terms and conditions of the tender documents.

TEE "Development of the Primary Health Care in the Walloon travel medical clinic" in ÉMOP-4.1.1 / A-12-2013-0048 identification number of construction projects (construction) works "

Eger Megyei Jogú Város Önkormányzata | Published April 10, 2015
Winner
ERTAMIL Ingatlanforgalmazó, Építőipari Szolgáltató és Kereskedelmi Kft.
cpvs
45000000, 45200000, 45210000

"A contract to the" Development of the Primary Health Care in the Walloon travel medical clinic "in ÉMOP-4.1.1 / A-12-2013-0048 identification number of construction projects (construction) works" Procurement quantity: less than No. 4, u-U 1313 property located family doctor's office renovation of current status in the individual units separate main entrance, but inside the building in a service corridor are linked. - In addition to building barrier-free parking is 1, which marked the sign. - Due to the existing ramps of them (9.75%) no longer meet the accessibility current specifications - the current 40 × for 40 cm concrete sheeting laid pavement fragmentation and roughness does not meet the accessibility standards - During the 1990s, was rebuilt to the south facade full length terrace built. The building floor insulation below the terrace level of the bottom wall section of the insulation was not created, so rainwater is absorbed from the terrace to the front wall of the hall ~ 1.00 m and height of the wet plaster is táskásodva. - The existing 55 mm thick. tokszerkezetű plastic front doors and windows U = 1,8W / m2K> 1,60W / m²K, combined wing windows U = 2,45W / m2K> 1,60W / m²K, therefore, on the north façade does not meet current building energy requirements. - The east-west facade; Di and out side the insulated B30 blokktéglán 4 cm thick. polystyrene foam insulation material is U = 0.73 W / m2K> 0.45 W / m2K, that does not meet the current building energy requirements. - Both surgery unit has unobstructed sink, but their design is not appropriate. - After the layer structure set straight layered flat roof exploration: 19 cm "PS" födémpalló, 25-40 cm slag charging, 7 cm top concrete, 2 layers. waterproofing, insulation 5 cm, the new flat roof waterproofing generally satisfactory condition. - The current building energy Classes F (average). RENOVATION WORK PLANNED TO BE CARRIED OUT IN CONNECTION front of the building on the existing parking lot, 2 car park barrier-free design, common checkout lanes. Building a new ramp system in accordance with accessibility aids formula. The construction of new sidewalks in accordance with accessibility aids formula. The internal areas of the south terrace contact length defeat of the plaster ~ 1.00 m (at least over the felnedvesedés 20 cm) high. The internal plastering can be started only after complete drying brick wall! Existing facade and wood. Expand plastic windows, replacing them with modern, new windows and increased insulation of the placement of the plane frame structure outside, exposed to the external plaster should be adjusted! The thermal insulation of walls can be commenced only after inspection and repairs carried out after the repaired surfaces are completely tethered to dry! The tables provided with STO equipped glass fiber reinforced coating system. Currently, the canopy roof drain baskets missing them after cleaning the drain pipe, drain old to be fit to make up a complete set! The basin formed a barrier-free sanitary ware, sanitary ware and sink in another partition relocation prescribed. The purity of the painting planned renovations to the building structural system is not affected. During the renovation of the building's exterior and its shared water supply system remains unchanged. On the internal system of the entire pipe network reconstruction szerelődik. The collectors are on top of the building (flat roof) are in two groups. Due to relocation of facilities in these places is necessary to amend the sewage. During the renovation of the building's drainage network remains unchanged. However, some of the radiator valves will be renewed visszaszerelésre system. The old ones will remain unchanged but will be transferred to the new feed-in hubs.
  • 1