Call +44 800 9755 164

Public tenders for cleaning in Saint-raphael France

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!
CleaningFrancesaint-raphael

Cleaning products

Communauté d'agglomération de Saintes | Published January 18, 2017  -  Deadline February 28, 2017
cpvs
39830000, 39831200, 39831210, 39224300

Supply and delivery of cleaning products, drugstore, hygiene products and disposable - supply of specific products for the aquatic center.

5 lots:

Lot No 1: Maintenance products: products for the maintenance of surfaces, kitchens and washer compatible with food contact;

Lot No 2: maintenance equipment;

Lot 3: paper: hands, toilet paper, paper towels;

Lot No 4: trash bags;

Lot No 5: Specific products for the aquatic center.

Cleaning communal buildings

Commune de saint-genis-laval | Published February 9, 2017  -  Deadline February 27, 2017
cpvs

Cleaning communal buildings

cleaning market the premises of the Tourist Office of Saint-Etienne Métropole

Office de tourisme de st etienne | Published January 31, 2017  -  Deadline March 1, 2017
cpvs

cleaning market the premises of the Tourist Office of Saint-Etienne Métropole

E3DSGSSM29082016 | RECOVERY OF LOT 6 - CLEANING SPECIAL LOCAL SITES decentralized (WINDOWS, SPECIAL TREATMENT) OF PUBLIC CLEANING OF LOCAL SITES decentralized COUNCIL DEPARTEMENTAL BOUCHES-DU-RHONE - 6 LOTS

Département des Bouches-du-Rhône | Published January 30, 2017  -  Deadline March 3, 2017
cpvs
90911300

RECOVERY OF LOT 6 - CLEANING SPECIAL LOCAL SITES decentralized (WINDOWS, SPECIAL TREATMENT) OF PUBLIC CLEANING OF LOCAL SITES decentralized COUNCIL DEPARTEMENTAL BOUCHES-DU-RHONE - 6 LOTS

SUPPLY AND MAINTENANCE OF NEW PROFESSIONAL CLEANING MATERIALS TO AND EPSMR CHGM

Groupement de commandes epsmr - chgm | Published February 20, 2017  -  Deadline March 13, 2017
cpvs
39713410

SUPPLY AND MAINTENANCE OF NEW PROFESSIONAL CLEANING MATERIALS TO AND EPSMR CHGM

local market cleaning and glazing of the Isle Community of Communes de Ré and Civil Society Local 'Destination Ile de Ré'.

Communaute de communes de l'ile de re | Published February 17, 2017  -  Deadline March 20, 2017
cpvs
90911000

local market cleaning and glazing of the Isle Community of Communes de Ré and Civil Society Local 'Destination Ile de Ré'.

Supply and installation of an automatic cleaning toilet for PMR on behalf of the city of Saran (45).

VILLE DE SARAN Mme Maryvonne HAUTIN - MairePlace de la Liberté 45774 Saran Tél : 02 38 80 34 00 - Fax : 02 38 80 34 30 | Published April 3, 2017  -  Deadline March 2, 2017
cpvs

common market, suitable open procedure.

Road bridge construction work

APRR | Published January 26, 2017  -  Deadline February 23, 2017
cpvs
45221111

Upgrade work 5 OA located on A6 direction P / L for the following works:

PICF 309 + 870.

PICF 312 + 180.

PICF 313 + 350.

PIBA 314 + 250.

Preliminary operations:

- Cleaning of the area around the work.

Work done on work:

- Complete reconstruction of the seal including statements sealing,

- Demolition and reconstruction of the GBA,

- Jacking of OA apron 314 + 250,

- Replacement of bridge bearings,

- Repair pavement joints,

- Strengthening vis-à-vis the impact of the top cross by shotcrete,

- Replacement or repair cornices,

- Removal / installation of GC S8,

- Implementation of an SEL on eaves and cornices-cons,

- Delivery / installation cable trays.

Work carried out under item:

- Implementation of barbicans

- Treatment of cracks,

- Recovery degraded concrete beams and abutment OA 314 + 250,

- Uncoupling and re-coupling hitch 2 aprons device

- Repair corrosion protection coupling devices.

Facilities, construction and folding means of access (including scaffolding, etc) 4 u.

Placing two cofferdams and driving diarrhea Creek 4 u.

execution of studies and methods (EQUIP, PPSPS, gluing folder, etc.) 4 u.

Diarrhea networks binding 2 u.

trial tests and control 4 u.

Cleaning of the area around the work 4 u.

Media Preparation including statements 800m 2 .

Supply and implementation of the asphalt layer 8 + 22, including the impregnation layer 790 m 2 .

Removing gutter 30m.

Recovery gutter by concreting including PVC sleeves 30m.

Supply and implementation including statements sealing protection mortar fence 80 m.

planing floor including sawing and waste disposal 550 m 2 .

F ...

Motorway construction works

APRR | Published January 26, 2017  -  Deadline February 28, 2017
cpvs
45233110

Châtillon viaducts are mixed structures.

Given the nature of the work and importance of the access means to implement to perform, complete interior control provisions are included in the specifications (internal and external controls).

For information:

Description of structures and access:

Châtillon viaducts are joint works in concrete slabs resting on piles and abutments.

North viaduct has 6 spans for a total length of 220 m and South Viaduct 5 spans with a total length of 196 m.

The underside South viaduct is only accessible by the highway direction Geneva / Macon while North viaduct batteries feet are only accessible by a towpath since 1084 RD in the municipality of Châtillon-en-Michaille .

Analysis of the state of the structure and access to the book:

Some sections of beams of laminated heels.

Their range is the only crossing section in the inner influence of batteries.

Only a mobile carriage supply seems mobilizable on these raceways.

Work to be done:

Resumption of the corrosion protection of all of the steel structure of a surface of 6500 m 2 .

- Establishment of stairs and walk scaffolding on areas identified in CCTP,

- Setting up scaffolding cantilevered advancement,

- dry cleaning,

- Abrasive blasting for obtaining a DS3 or preparation DS 2.5,

- dusting,

- Application layer primary and finish paint.

All the stages of implementation will be in accordance with the provisions of the GTCC easy 56 concerning the protection of metal structures against corrosion.

The same service will occur during the construction period for carrying out checks on the implementation process, the breakpoints for stripping operations, dust, and paint application (total thickness, layer adhesion test, color)

Means of access and protections:

The objective of the operator is to minimize disruption to customers, it is envisaged to carry out the work under scaffolding implemented under viaducts.

The access means hard at work will be installed from the feet of works excluding current section.

In this sense also, evacuation chutes treatment particles will be set up for immediate rejection in processing skips.

This confinement will also ensure better management of conditions of application of anticorrosion complex.

Particular attention should also be paid to networks present in the works.

environmental constraints:

To verify existing paintings, the client will execute withdrawals from the paintings in place to verify the absence of asbestos and lead.

  • 1