Public tenders for cleaning in Estonia

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!
CleaningEstonia

Skid Acquisition of capital lease terms

Kuressaare Linnavalitsus - Margo Sooäär | Published March 24, 2017  -  Deadline April 19, 2017
cpvs
34142200

4.1. Contract skid the contract and the lease contract of finance lease terms (either a credit institution or by the seller regarding the form), in which the interest rate is fixed, the lease period of 5 years (60 months), mileage and working hours limit, no monthly annuity under the contract there is no vendor Down payment amount is 20 % offered Skid cost; payments shall be made on the basis of invoices. 4.2. motor hull insurance is taken by the contracting separately; 4.3. supply Kuressaare organized by the city on their own expense; 4.4. registration in the register of traffic organization on their own cost (registration fee, state fee, number plate, etc.); Skid responsible for about Jaks contracting states, user states managed by the city of Kuressaare Kuressaare City Economic Authority, RK 75034494, Mikk Snowstorm, tel +372 5,157,141th 4.5. the delivery date is not later than two months in the award of the contract. Minimum requirements articulated controlled skid (Skid) is new - the year of issue, 2017, or 2016. The engine, chassis: engine power less than 26 kW; Engine Type: diesel engine, liquid cooled, 4 cylinders, displacement of 1400 cc; Mass not exceeding 1600 kg; Machine height not exceeding 2040 mm; Machine width not exceeding 1300 mm, machine length not exceeding 2600 mm; Wheelbase of not less than 1,200 mm at 200 bar; Hüdroväljavõtte 3-1 Quick connectors (original manufacturer); Forks at maximum lifting capacity of 1000 kg, traveled with forks at least 1200 kg; Option to disable lifting the boom freely ujuvasse the tools to position the snap locks - a mechanical or hydraulic (original manufacturer) Frame: hitch, the center shifted to the side lifting boom, laterally stiff center joint. Control: drive, articulated, double sõidupedaaliga (back). Driver's seat: adjustable, air suspension, cloth. Management bodies: "joystick" type boom and auxiliary hydraulics control lever telescope management options. LED flashing light on the roof. Accessories garnered a machine to: 1. Universal bucket (Snappy), straight-edged, a width of 1350 ...... 1400 mm 2 Snow plow V-shaped rubber blade, the width of an upright position and not less than 2500 mm, weighing not more than 400 kg procured the machine must be compatible with the following available (2008 600 series Avant) operational tools (devices): 1. universal bucket (Snappy), straight-edged, a width of 1200 ...... 1300 mm 2 Snow plow V-shaped rubber blade width 2100 ...... 2200 mm 3 Sweeper brush width of 1200 ... 4. .1300 mm collection box and side brush 5. Street cleaning lawn mower, a width of at least 1400 ... .1500 mm 6. Trummelniiduk, slope mowing waysides 7. Snow brush width of 1 200 mm ... ..1400 8 Maafrees width 1200 mm 9 ... .1400 Universaalhaarats . Equipped with English usage and safety sheets. Equipped with the traffic lights, and the law provides for the safety of equipment. Delivery of up to two months into the contract Handing and at least four men trained in the user's address Tehnika 10 Kuressaare warranty period of not less than 2 years of mechanical transfer interval is not less than 350 hours

Kilingi-Nõmme 110/35/15 kV substation 35 and 15 kV switchgear reconstruction

Elektrilevi OÜ - HENRY TIIDU | Published July 19, 2013  -  Deadline August 26, 2013
cpvs
45232220

Tender "Kilingi-Nõmme 110/35/15 kV substation 35 kV and 15 kV reconstruction" of the volume of work includes the following: all the equipment offered to obtain the installation setup and testing. 02.01. 40.5 kV double-insulated switchgear compartments inside, and elegaasisolatsiooniga vaakumvõimsuslülititega, rated current 630 A, 20 lühisvoolutaluvusega kA/3s sourcing. 02.02. 24 kV insulation kit enclosed switchgear, two compartments, the nominal current of 1250 A, rods, air-insulated, lühisvoolutaluvusega 20 kA/3s obtaining 2.3. Both compartments voltage regulation side of the arc 15.75 /  3 kV, 1600 kvar, kompenseerimisvahemikuga 35-176 A 2.4 Acquisition. Both sections of earth omatarbetrafo 15,75 / 0,4 kV, 1600 kVA kVA +100. 05.02. Install a new AC power center 0.4 kV, 100 A and 110 V DC Center, along with battery chargers for obtaining 2.6. New 35 kV and 15 kV switchgear provide a new mechanical device for obtaining 2.7. 15 kV JS-ist outgoing cable lines linking overhead lines. 08.02. The new control room building, 35 kV and 15 kV JS spaces, grounding transformers and auxiliary spaces kaarepoolide, outhouse 2.9 space. The property located 35 kV substation anchorage duty cleaning and painting 10.02. Current and voltage transformer to obtain. 2.11. The new asphalt concrete surfacing, construction of the access road. 2.12. The new 0.4 cable line construction Morning 15/0, 4 sub-station pump house to supply 2.13. Scope of work of 2.13.1. Switchyard construction of a building 2.13.2. Grounding omatarbetrafode Installation 2.13.3. Kaarepoolide installation of 2.13.4. Existing distribution transformers capture new device 2.13.5. Transformers, voltage regulators, exchanges of existing drives 2.13.6. 15 kV switchgear installation of a two-bin 2.13.7. 35 kV switchgear installation of 2.13.8. All outgoing 35 kV and 15 kV feeder cable lines with the construction of the cable-coupling installation and grid interconnection 2.13.9. 0.4 kV power cable to the pump house installation of Morning 15/0, 4 kV sub-station with all the necessary switching equipment installation work on 13/02/10. Electrical Installation Levi kommertsmõõtesüsteemide 13/02/11. 35 kV and 15 kV kommertsmõõtepunktide construction According to the TSO requirements (see Additional HD 22 "Requirements kommertsmõõtmisteks used in high-voltage instrument transformers, 02/13/12. 2:13:13 construction of a new access road. Automatic fire detection and alarm system 02.13.14. Dismantling according demontaažiplaanile 2.14. Engineering works: 2.14 .1. part of structural, incl. territory design 2.14.2. switchgear building design 2.14.3. primary design 2.14.4. 35 kV and 15 kV switchgear design 2.14.5. 0.4 kV Power Pump House Community Design 2.14.6. Secondary Designing 2.14.7. automated fire and burglar alarm system design 2.14.8. reserve power (battery) design of mechanical and communications equipment 2.14.9. heating, ventilation, lighting design 14.02.10. Attachments Roadway Design

Kilingi-Nõmme 110/35/15 kV substation 35 and 15 kV switchgear reconstruction

Elektrilevi OÜ - HENRY TIIDU | Published October 11, 2013
cpvs
45232220

Tender "Kilingi-Nõmme 110/35/15 kV substation 35 kV and 15 kV reconstruction" of the volume of work includes the following: all the equipment offered to obtain the installation setup and testing. 02.01. 40.5 kV double-insulated switchgear compartments inside, and elegaasisolatsiooniga vaakumvõimsuslülititega, rated current 630 A, 20 lühisvoolutaluvusega kA/3s sourcing. 02.02. 24 kV insulation kit enclosed switchgear, two compartments, the nominal current of 1250 A, rods, air-insulated, lühisvoolutaluvusega 20 kA/3s obtaining 2.3. Both compartments voltage regulation side of the arc 15.75 /  3 kV, 1600 kvar, kompenseerimisvahemikuga 35-176 A 2.4 Acquisition. Both sections of earth omatarbetrafo 15,75 / 0,4 kV, 1600 kVA kVA +100. 05.02. Install a new AC power center 0.4 kV, 100 A and 110 V DC Center, along with battery chargers for obtaining 2.6. New 35 kV and 15 kV switchgear provide a new mechanical device for obtaining 2.7. 15 kV JS-ist outgoing cable lines linking overhead lines. 08.02. The new control room building, 35 kV and 15 kV JS spaces, grounding transformers and auxiliary spaces kaarepoolide, outhouse 2.9 space. The property located 35 kV substation anchorage duty cleaning and painting 10.02. Current and voltage transformer to obtain. 2.11. The new asphalt concrete surfacing, construction of the access road. 2.12. The new 0.4 cable line construction Morning 15/0, 4 sub-station pump house to supply 2.13. Scope of work of 2.13.1. Switchyard construction of a building 2.13.2. Grounding omatarbetrafode Installation 2.13.3. Kaarepoolide installation of 2.13.4. Existing distribution transformers capture new device 2.13.5. Transformers, voltage regulators, exchanges of existing drives 2.13.6. 15 kV switchgear installation of a two-bin 2.13.7. 35 kV switchgear installation of 2.13.8. All outgoing 35 kV and 15 kV feeder cable lines with the construction of the cable-coupling installation and grid interconnection 2.13.9. 0.4 kV power cable to the pump house installation of Morning 15/0, 4 kV sub-station with all the necessary switching equipment installation work on 13/02/10. Electrical Installation Levi kommertsmõõtesüsteemide 13/02/11. 35 kV and 15 kV kommertsmõõtepunktide construction According to the TSO requirements (see Additional HD 22 "Requirements kommertsmõõtmisteks used in high-voltage instrument transformers, 02/13/12. 2:13:13 construction of a new access road. Automatic fire detection and alarm system 02.13.14. Dismantling according demontaažiplaanile 2.14. Engineering works: 2.14 .1. part of structural, incl. territory design 2.14.2. switchgear building design 2.14.3. primary design 2.14.4. 35 kV and 15 kV switchgear design 2.14.5. 0.4 kV Power Pump House Community Design 2.14.6. Secondary Designing 2.14.7. automated fire and burglar alarm system design 2.14.8. reserve power (battery) design of mechanical and communications equipment 2.14.9. heating, ventilation, lighting design 14.02.10. Attachments Roadway Design

Kilingi-Nõmme 110/35/15 kV substation 35 and 15 kV switchgear reconstruction

Elektrilevi OÜ - HENRY TIIDU | Published July 16, 2013  -  Deadline August 12, 2013
cpvs
45232220

Tender "Kilingi-Nõmme 110/35/15 kV substation 35 kV and 15 kV reconstruction" of the volume of work includes the following: all the equipment offered to obtain the installation setup and testing. 02.01. 40.5 kV double-insulated switchgear compartments inside, and elegaasisolatsiooniga vaakumvõimsuslülititega, rated current 630 A, 20 lühisvoolutaluvusega kA/3s sourcing. 02.02. 24 kV insulation kit enclosed switchgear, two compartments, the nominal current of 1250 A, rods, air-insulated, lühisvoolutaluvusega 20 kA/3s obtaining 2.3. Both compartments voltage regulation side of the arc 15.75 /  3 kV, 1600 kvar, kompenseerimisvahemikuga 35-176 A 2.4 Acquisition. Both sections of earth omatarbetrafo 15,75 / 0,4 kV, 1600 kVA kVA +100. 05.02. Install a new AC power center 0.4 kV, 100 A and 110 V DC Center, along with battery chargers for obtaining 2.6. New 35 kV and 15 kV switchgear to provide new on mechanical device to obtain 2.7. 15 kV JS-ist outgoing cable lines linking overhead lines. 08.02. The new control room building, 35 kV and 15 kV JS spaces, grounding transformers and auxiliary spaces kaarepoolide, outhouse 2.9 space. The property located 35 kV substation anchorage duty cleaning and painting 10.02. Current and voltage transformer to obtain. 2.11. The new asphalt concrete surfacing, construction of the access road. 2.12. The new 0.4 cable line construction Morning 15/0, 4 sub-station pump house to supply 2.13. Scope of work of 2.13.1. Switchyard construction of a building 2.13.2. Grounding omatarbetrafode Installation 2.13.3. Kaarepoolide installation of 2.13.4. Existing distribution transformers capture new device 2.13.5. Transformers, voltage regulators, exchanges of existing drives 2.13.6. 15 kV switchgear installation of a two-bin 2.13.7. 35 kV switchgear installation of 2.13.8. All outgoing 35 kV and 15 kV feeder cable lines with the construction of the cable-coupling installation and grid interconnection 2.13.9. 0.4 kV power cable to the pump house installation of Morning 15/0, 4 kV sub-station with all the necessary switching equipment installation work on 13/02/10. Electrical Installation Levi kommertsmõõtesüsteemide 13/02/11. 35 kV and 15 kV kommertsmõõtepunktide construction According to the TSO requirements (see Additional HD 22 "Requirements kommertsmõõtmisteks used in high-voltage instrument transformers, 02/13/12. 2:13:13 construction of a new access road. Automatic fire detection and alarm system 02.13.14. Dismantling according demontaažiplaanile 2.14. Engineering works: 2.14 .1. part of structural, incl. territory design 2.14.2. switchgear building design 2.14.3. primary design 2.14.4. 35 kV and 15 kV switchgear design 2.14.5. 0.4 kV Power Pump House Community Design 2.14.6. Secondary Designing 2.14.7. automated fire and burglar alarm system design 2.14.8. reserve power (battery) design of mechanical and communications equipment 2.14.9. heating, ventilation, lighting design 14.02.10. Attachments Roadway Design

Eesti power unit No. 8 and No. 11 block of the Balti power of instrumental and töösuruõhu equipment and technological systems maintenance and repair

Eesti Energia Narva Elektrijaamad AS - Natalja Beljajeva | Published April 11, 2016
Winner
Osaühing Kompressorikeskus, 10573292, Kadaka tee 5, Tallinn, 10621 Eesti (EE) Tel.: +372 6155550
cpvs
50531300

These systems supplying compressed air to a variety of consumers. Moreover, the compressors instrumentaalsuruõhk cooled, filtered and dried. A large part of töösuruõhust used for transport of ash. Instrumental and töösuruõhusüsteemid is equipped with a dry solvent-adsorbers. Wintertime driers adsorbtsioonikomplekte, which is also designed to operate at full capacity flow. Balti power plant block No. 11 instrumental and töösuruõhu equipment and technological systems maintenance and repair (Scheme 843011541h). Eesti power unit No. 8 instrumental and töösuruõhu equipment and technological systems maintenance and repair (Scheme 841011541h). Deadline for execution of works: 05.01.2016 - 04.30.2018. Technical description ". Eesti power unit No. 8 and No. 11 block of the Balti power plant equipment maintenance capacity: - burning appliances - visual inspection, fault identification and, possibly, their liquidation. - The maintenance rules and regulations, cleaning, lubrication, nipple connection leaks, replacement of worn parts, supplies - according to the manufacturer's instructions and consists of: - maintenance, inspections and repairs plaanilis-prevention schedules; - Compressors of all structures and communications surveillance; - Inspection and maintenance documentation. Technical description ". Maintenance conditions for the exercise: - generated during emergency situations, solving operational response time should not exceed 12 hours from the customer challenge (by telephone), regardless of the day, the week or the holiday season. - Elimination of faults and / or performing a scheduled maintenance procedure (if there is no operational response to the need for) the response time should not exceed five working days from the date of the declaration by the representative of the contracting authority. - All consumables (filters, oil, etc.) which are necessary for regular maintenance, must be part of the bid amount. - Cost of materials, combustibles, lubricants, spare parts and / or the exchange of similar and / or analogous to the technical characteristics of a product - in coordination with the client. - The contractor shall submit to the contracting authority, where necessary, materials and spare parts for the certificates and / or passports. In fact, performed repairs shall be paid for additionally, after coordination with the client. - Consumables and spare parts must comply in full with applicable legislation, regulations, official requirements of the services and the relevant international, European and Estonian standards (EVS-EN, ISO, EN, DIN). - The challenge of used filters, lubricants and other combustible materials utilization carried out by the contracting authority. - Equipment maintenance contractor performs his tools, measures and instruments. - The Contractor shall clean the place of work after the completion of maintenance or repair work.

Eesti power unit No. 8 and No. 11 block of the Balti power of instrumental and töösuruõhu equipment and technological systems maintenance and repair

Eesti Energia Narva Elektrijaamad AS - Natalja Beljajeva | Published March 14, 2016  -  Deadline March 30, 2016
cpvs
50531300

These systems supplying compressed air to a variety of consumers. Moreover, the compressors instrumentaalsuruõhk cooled, filtered and dried. A large part of töösuruõhust used for transport of ash. Instrumental and töösuruõhusüsteemid is equipped with a dry solvent-adsorbers. Wintertime driers adsorbtsioonikomplekte, which is also designed to operate at full capacity flow. Balti power plant block No. 11 instrumental and töösuruõhu equipment and technological systems maintenance and repair (Scheme 843011541h). Eesti power unit No. 8 instrumental and töösuruõhu equipment and technological systems maintenance and repair (Scheme 841011541h). Deadline for execution of works: 01.05.2016 - 04.30.2018. Technical description ". Eesti power unit No. 8 and No. 11 block of the Balti power plant equipment maintenance capacity: - burning appliances - visual inspection, fault identification and, possibly, their liquidation. - The maintenance rules and regulations, cleaning, lubrication, nipple connection leaks, replacement of worn parts, supplies - according to the manufacturer's instructions and consists of: - maintenance, inspections and repairs plaanilis-prevention schedules; - Compressors of all structures and communications surveillance; - Inspection and maintenance documentation. Technical description ". Maintenance conditions for the exercise: - generated during emergency situations, solving operational response time should not exceed 12 hours from the customer challenge (by telephone), regardless of the day, the week or the holiday season. - Elimination of faults and / or performing a scheduled maintenance procedure (if there is no operational response to the need for) the response time should not exceed five working days from the date of the declaration by the representative of the contracting authority. - All consumables (filters, oil, etc.) which are necessary for regular maintenance, must be part of the bid amount. - Cost of materials, combustibles, lubricants, spare parts and / or the exchange of similar and / or analogous to the technical characteristics of a product - in coordination with the client. - The contractor shall submit to the contracting authority, where necessary, materials and spare parts for the certificates and / or passports. In fact, performed repairs shall be paid for additionally, after coordination with the client. - Consumables and spare parts must comply in full with applicable legislation, regulations, official requirements of the services and the relevant international, European and Estonian standards (EVS-EN, ISO, EN, DIN). - The challenge of used filters, lubricants and other combustible materials utilization carried out by the contracting authority. - Equipment maintenance contractor performs his tools, measures and instruments. - The Contractor shall clean the place of work after the completion of maintenance or repair work.

Kiili Parish landscaping

Kiili Vallavalitsus - Kadre Rumm | Published June 9, 2015
Winner
Murusöödik OÜ, 11175731, Paju tn 1, Raasiku alevik, Raasiku vald, Harjumaa, 75203 Eesti (EE) Tel.: +372 5140029
cpvs
50800000

Kiili carry out the following tasks: I. Lawn Mowing first Niitmissageduse service areas are divided into five different service classes: 1.1. I care class (HK) - Maximum frequency of mowing in May and September, three times a month in June, July and August, four times a month; 1.2. Service Class II (II HK) - Maximum frequency of mowing in May and September, two times a month in June, July and August, three times a month; 1.3. Service Class III (HK III) - the frequency of mowing once a month from May 1 to September; 1.4. Service Class IV (IV HK) - the frequency of mowing in June and August 1 every month. 1.5. Service Class V (V HK) - July 1 the frequency of mowing once a month. Maintenance Enforcement takes place regularly and proactively. Green grass covering the rest of the municipality may have a few sparsely vegetated places. 3. Ostrava town to be mowed frequently so that there is no appreciable niitmisjääki, but not less than once every ten days. The rest of each planting green areas mowed shown niitmissageduse shown in the Appendix No. 1 "List of items". The contracting entity shall inform the contractor niitmistööde suspension and the restart of the drought at the end of mowing. 5. Barriers surroundings need to be cleaned so often, that they do not differ from the general appearance of the aesthetic area. 6. Leaves should plunder as necessary, but not less than once in the spring and twice in the fall of Appendix 1 "List of items" shown in the maintenance areas. 7. Rotary mowing, must be used for the most part. II. Cleaning of garbage first town Kajaani loose debris is cleaned once a week for one, rest areas, garbage is cleaned according to the Appendix No. 1 "object list" shows the frequency. 2. Cutter random garbage areas are cleaned immediately before mowing to avoid mowing and chopping distributed throwing garbage. 3. The bins are emptied according to the Appendix No. 1 "List of items" listed frequencies. III. Playground maintenance and endangering the safety of the use of threatening damage is repaired immediately informing the Subscribers. 2. In accordance with established safety checks EN 1176 standard. 3. Playground maintenance and repairs carried out in April. Raked the sand every month from April to October.

Repair of streets pritskillustikuga 2015

Tartu Linnavalitsus - RIINA LILL | Published February 10, 2015  -  Deadline February 17, 2015
cpvs
45233223

Description of the existing situation: to eradicate this problem is necessary to perform various streets pritskillustikuga repairs. Requiring repair sections of streets are the main streets, as well as the distribution of the side streets. Repair sectors given the exact locations of the contract by the Contractor prior to the start of works in conjunction with the approximate volume of work. Existing regulations and guidelines for carrying out the works: The contractor shall be guided in making the work force for road works related to laws, standards, regulations and guidance documents to the full texts are available: 1. Electronic State Journal - www.riigiteataja.ee 2. Highways Agency website www.mnt.ee heading "Instructions and Guidelines" 3. Standardization Center www.evs.ee 4. Pavement repair methods for the selection principles (02/04/2014) This http://mnt.ee/public/Katete_remondimeetodite_valikupohimotted.pdf pritskillustikuga repair of road management is a method in which the work necessary to repair filler and binder mixture prepared for the site of repair, by mixing a filler, and a binder and injecting it in a fixed ratio to the damaged spot. Traffic must be approved in advance by the Tartu City Government. Road Works Contractor must comply with the requirements of this specification and the environment environmental laws, standards, regulations and guidelines that are related to the performance of the contractor. Description of work: the holes and cracks in the coating repairs carried out with bitumen emulsion BE-60M (or equivalent) with a granite fr 2-6 (LA 25). Used for the repair work to repair a hole in a mechanized unit, which is equipped with electronically controlled bitumen emulsion and aggregate metering units (eg Schaffer, or Salvaco or equivalent), the estimated average expense ratio is 1 kg of the emulsion / 10 kg of crushed stone. Streets carrying out repairs to the machine must be fitted with a device that allows you to monitor the time spent and the cost of bitumen emulsion. The works, description: - Clean the holes in the dust with compressed air (if necessary also veepritsimisseadmega); - Holes in the bottom and the edges of the cracks priming with bitumen; - Filling holes and cracks in the bitumen emulsion and crushed granite fr 2-6 mixture; - Repaired the hole finishing rubble; - Loose gravel must be harvested within three days after the concrete road repair, the subsequent appearance of loose gravel korduskoristuse obligation of the Contractor. Repeat Cleaning should be done immediately a problem occurs, but not later than two working days after the client's presentation of a corresponding note.

Repair of streets pritskillustikuga 2015

Tartu Linnavalitsus - RIINA LILL | Published March 17, 2015
Winner
osaühing Üle, 10405442, Peterburi tee 46, Tallinn, 11415 Eesti (EE) Tel.: +372 5131904
cpvs
45233223

Description of the existing situation: to eradicate this problem is necessary to perform various streets pritskillustikuga repairs. Requiring repair sections of streets are the main streets, as well as the distribution of the side streets. Repair sectors given the exact locations of the contract by the Contractor prior to the start of works in conjunction with the approximate volume of work. Existing regulations and guidelines for carrying out the works: The contractor shall be guided in making the work force for road works related to laws, standards, regulations and guidance documents to the full texts are available: 1. Electronic State Journal - www.riigiteataja.ee 2. Highways Agency website www.mnt.ee heading "Instructions and Guidelines" 3. Standardization Center www.evs.ee 4. Pavement repair methods for the selection principles (02/04/2014) This http://mnt.ee/public/Katete_remondimeetodite_valikupohimotted.pdf pritskillustikuga repair of road management is a method in which the work necessary to repair filler and binder mixture prepared for the site of repair, by mixing a filler, and a binder and injecting it in a fixed ratio to the damaged spot. Traffic must be approved in advance by the Tartu City Government. Road Works Contractor must comply with the requirements of this specification and the environment environmental laws, standards, regulations and guidelines that are related to the performance of the contractor. Description of work: the holes and cracks in the coating repairs carried out with bitumen emulsion BE-60M (or equivalent) with a granite fr 2-6 (LA 25). Used for the repair work to repair a hole in a mechanized unit, which is equipped with electronically controlled bitumen emulsion and aggregate metering units (eg Schaffer, or Salvaco or equivalent), the estimated average expense ratio is 1 kg of the emulsion / 10 kg of crushed stone. Streets carrying out repairs to the machine must be fitted with a device that allows you to monitor the time spent and the cost of bitumen emulsion. The works, description: - Clean the holes in the dust with compressed air (if necessary also veepritsimisseadmega); - Holes in the bottom and the edges of the cracks priming with bitumen; - Filling holes and cracks in the bitumen emulsion and crushed granite fr 2-6 mixture; - Repaired the hole finishing rubble; - Loose gravel must be harvested within three days after the concrete road repair, the subsequent appearance of loose gravel korduskoristuse obligation of the Contractor. Repeat Cleaning should be done immediately a problem occurs, but not later than two working days after the client's presentation of a corresponding note.

Dragonfly municipal landscaping

Kiili Vallavalitsus - Toomas Kärvet | Published July 8, 2014
Winner
Murusöödik OÜ, 11175731, Paju tn 1, Raasiku alevik, Raasiku vald, Harjumaa, 75203 Eesti (EE) Tel.: +372 5140029
cpvs
50800000

Ostrava in the field to perform the following tasks: I. The first Niitmissageduse Lawn mowing care can be divided into five different areas of nursing classes: 1.1. Service Class I (HK I) - the maximum frequency of mowing in May and September, three times a month in June, July and August, four times a month; 02.01. Service Class II (HK II) - The maximum frequency of mowing in May and September, two times a month in June, July and August, three times a month; 03.01. Service Class III (III HK) - The frequency of mowing once a month from May 1 to September; 01.04. Class IV maintenance (HK IV) - the frequency of mowing in June and one in August on a monthly basis. 05.01. Maintenance Class V (V HK) - July 1, the frequency of mowing once a month. 2 Ostrava town green lawn is healthy and good coverage, green, dense, well-maintained and in good repair. Maintenance resort is applied regularly and proactively. Green grass covering the rest of the municipality may have a few sparsely vegetated sites. 3 Ostrava town to mow so often that there is no appreciable niitmisjääki, but not less than once every ten days. The remaining green areas mowed green space for each of the shows they niitmissageduse according to Appendix 1 "List of objects". 4 drought the grass is not mowed. Niitmistööde authority shall inform the contractor of the suspension and resumption of mowing the end of the drought. 5 Obstacles surroundings should be cleaned so often that they do not differ from the general appearance of the aesthetic area. Leaves 6 to plunder as necessary but not less than once in the spring and twice in the fall of Appendix 1 "List Objects" shows the maintenance areas. 7 Rotary mowing should be used for the most part. II. Garbage cleaning in the first town Kajaani loose debris are cleaned once a week for one, rest areas, clean up garbage in accordance with Annex No. 1, "Object List" shows the frequency. 2 Cutting areas are cleaned immediately before random garbage mowing, mowing to prevent the spread throwing garbage grinding. 3 bins are emptied according to Annex No. 1 "list of objects" in the frequencies. III. Playground maintenance of the first structures, small forms and equipment are kept in good condition. Endangering the safety and use of threatening damage repaired immediately informing the subscribers. 2nd set of security controls in accordance with EN 1176 standard. 3 Playground maintenance and repair will take place in April. 4 Sand is peeled replacing the top layer of sand that is transported and placed onto the new layer. Rake the sand once a month from April to October. Completed works will be accounted maintenance logbook (Annex 5). At last week's data are presented for Environment and head of a new week on Monday afternoon maaosakonna.

Dragonfly municipal landscaping

Kiili Vallavalitsus - Toomas Kärvet | Published March 31, 2014  -  Deadline April 16, 2014
cpvs
50800000

Ostrava in the field to perform the following tasks: I. Lawn Mowing 1 Niitmissageduse maintenance areas are divided into five different service classes: the 1.1. Service Class I (HK I) - the maximum frequency of mowing in May and September, three times a month in June, July and August, four times a month; 1.2. Service Class II (HK II) - The maximum frequency of mowing in May and September, two times a month in June, July and August, three times a month; 1.3. Service Class III (III HK) - The frequency of mowing once a month from May to September 1; 1.4. Class IV maintenance (HK IV) - the frequency of mowing in June and one in August on a monthly basis. 05.01. Maintenance Class V (V HK) - July 1, the frequency of mowing once a month. 2 Dragonfly town green lawn is healthy and good coverage, green, dense, well-maintained and in good repair. Maintenance resort is applied regularly and proactively. Green grass covering the rest of the municipality may have a few sparsely vegetated sites. 3 Dragonfly town to mow so often that there is no appreciable niitmisjääki, but not less than once every ten days. The remaining green areas mowed green space for each of the shows they niitmissageduse according to Appendix 1 "List of objects". 4 Drought the grass is not mowed. Niitmistööde authority shall inform the contractor of the suspension and resumption of mowing the end of the drought. 5 Around obstacles need to be cleaned so often that they are no different from the general appearance of the aesthetic area. 6 The leaves should be skimmed off as needed, but not less than once in the spring and twice in the fall of Appendix 1 "List Objects" shows the maintenance areas. 7 For mowing should be used in most of Rotary. II. Garbage cleaning in the first Dragonfly town coarse debris are cleaned once a week for one, rest areas, clean up garbage in accordance with Annex No. 1, "Object List" shows the frequency. 2 Areas Reaper harvested random garbage shortly before mowing to avoid mowing and chopping debris scattered throwing. 3 Bins are emptied in accordance with Appendix 1 "List of objects" in the frequencies. III. Playground Maintenance 1 Structures, small forms and equipment are kept in good condition. Endangering the safety and use of threatening damage repaired immediately notifying the subscribers. 2 Security controls in accordance with established standard EN 1176. 3 Playground maintenance and repair will take place in April. 4 Sand is peeled replacing the top layer of sand that is transported and placed onto the new layer. Rake the sand once a month from April to October. Completed works will be accounted maintenance logbook (Annex 5). At last week's data are presented for Environment and head of a new week on Monday afternoon maaosakonna.

Electricity Distribution LLC, line maintenance work

Elektrilevi OÜ - Angela Laine | Published January 12, 2017
cpvs
77230000, 77210000, 45232200, 45232210

The tender is divided into parts (Part 1 and Part 4): 1.1 Part 1 - Kallaste, Tartu land, Jõgeva line corridor maintenance area; 1.2 Part 2 - Paide, Järva-Jaani line corridor maintenance area; 1.3 Part 3 - Roela, Kill and Little Mary along the corridor service area; 1.4 Part 4 - Võru along the corridor service area; Maintenance Contract map regions are at the tender documents, a file named "regional line corridor maintenance card". EXERCISING work within the successful tenderer undertakes to do the following: 2.1, line maintenance work according to the Republic of Estonia, the current legislation and requirements established by the contracting authority. Cutting waste valleys assembly line onto the field edges or cleaning. 2.3 The owner of the immovable Electricity Distribution LLC Form (Landowner notification letter format) for information regarding the work of the exercise and the owner of the immovable special requirements, coordination of cross cutting felled trees, and the collection and handling of logging residues; Getting forest notifications required for the work; 2.5 felled timber to the owner of an immovable or the use of the property to the person entitled failure, unless the property owner or the person entitled to use the property agrees otherwise in writing by the contractor. Company contract shall take effect on the contract. The work is paid for by the contracting authority in accordance with the unit prices of the transmitted orders. The contract is concluded for three years the right to extend the contract of the contracting twice in one year (3 + 1 + 1). If the supplier has submitted a tender with the lowest total cost of more than two participating in the tender, the contracting authority has the right to choose which parts of it according to the contract provider to conclude, on the basis of all the parts of the tender bids the lowest total cost of the whole.

Electricity Distribution LLC Tõstamaa 35/10 kV substation reconstruction IK0667

Elektrilevi OÜ - Kadri Leopard | Published December 28, 2016
cpvs
31682540, 45232220

The tender "Tõstamaa 35/10 kV substation 35 kV and 10 kV switchgear reconstruction and to compensate installation maaühendusvoolude" volume contains the following works: 1. Design work: 1.1. Structural part, including. territory design; 1.2. Switchyard building design; 1.3. Primary Design; 1.4. 35 kV and 10 kV switchgear design; 1.5. Maaühendusvoolude compensation design; 1.6. Secondary design; 1.7. Automatic fire and security alarm systems engineering; 1.8. Backup power (battery) design for mechanics and communications equipment. 2. Construction and installation work Substation: 2.1. Switchyard building construction; 2.2. Service road construction, maintenance work; 2.3. Maandusomatarbetrafo installation; 2.4. Installing the bobbin arc; 2.5. Existing transformer repair; 2.6. Linking an existing transformer new distribution device; 2.7. 10 kV switchgear installation; 2.8. 35 kV switchgear installation; 2.9. The new mast with a switching apparatus, 35 kV metal framework tower cleaning and painting; 2.10. All outgoing 35 kV and 10 kV feeder cable lines with the construction of the installation of the cable sleeves and tying the electricity grid; 2.11. Grounding and lightning protection works; 2.12. The reserve supply of equipment. 3. Secondary Installation and setup work. 4. dismantling 4.1. The old 10 kV and 35 kV switchgear demolition, in the disposal, and the dismantling of deposit.

Electricity Distribution LLC, line maintenance work

Elektrilevi OÜ - Angela Laine | Published March 27, 2017  -  Deadline May 8, 2017
cpvs
77230000, 77210000, 45232200, 45232210

The tender is divided into parts (Part 1 and Part 4): 1.1 Part 1 - Rae, the Eagle line corridor maintenance area; 1.2 Part 2 - Kohtla-Jarve, Jõhvi line corridor maintenance area; 1.3 Part 3 - Pärnu, Vändra, Võhma line corridor maintenance area; 1.4 Part 4 - Põltsamaa line corridor maintenance area. Regional Service Card is the tender documents at the file named "regional line corridor maintenance card". EXERCISING work within the successful tenderer undertakes to do the following: 2.1, line maintenance work according to the Republic of Estonia, the current legislation and the requirements established by the contracting authority. 2.2 of felling, lopping, sawing, chopping brushwood and branches, pruning; cut assortments of redundancy; logging waste, redundancy valleys along the corridor outer edges or cleaning. 2.3 The owner of the immovable Electricity Distribution LLC Form (file "Landowner notification letter form") for information regarding the work of the exercise and the owner of the immovable special requirements, coordination of cross cutting felled trees, and the collection and handling of logging residues. 2.4 All written work necessary permits and approvals (including governments, metsavaldajatelt, owners of the property, land users, the Environment Agency, RMK) sourcing; obtaining of necessary forest notifications. 2.5 felled timber to the owner of an immovable or the use of the property to the person entitled failure, unless the property owner or the person entitled to use the property agrees otherwise in writing by the contractor. Põltsamaa procurement area will submit orders from 01 October 2017. The work is paid for by the supplier in accordance with the unit prices of the transmitted orders. Contract awarded to one vendor for the right to extend the contract twice in one year (1 + 1 + 1). If the supplier has submitted a tender with the lowest total cost of more than two procurement, the contracting authority has the right to choose which parts of it according to the contract provider to conclude, on the basis of all the parts of the tender bids the lowest total cost of the whole.

Järvamaa, Koeru parish, village Valila, Estonia, IP2838

Elektrilevi OÜ - KATRIN KARU | Published December 6, 2016
cpvs
45311000

- Repair work is carried out according to the project IP2838. - If the work reveals the need to change the volume of work, it must agree with the order submitted. - Before starting work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - According to drawing a project to repair replace Valila, Estonia (J-Jaani) AJ F-1 bare overhead conductors for overhead cables AMKA 3x50 + 70 m and a volume of 2,006 house connections for overhead cables AMKA 3x16 + 25 volume 49 m. 9 korduvmaandust and build one mastikaitselüliti. Take into account the additional conditions set out in a separate file .: 1) Overhead wire material volumes also take into account all the material related Covenants wirelessly exchange volumes, including all the warning signs of masts, as well as the need for AMKA kandearmatuur and PMCC first pole connectors. 2) Overhead conductor installation work volumes also take into account all the other work that accompany Covenants masts dressing according to the current requirements, including the old kandearmatuuri disassembly, flush with the tops of trimming puitmastidel mastimütside installation of all masts Placarding. 3) Overhead lines, if necessary, the scope of works includes cleaning of the route so that trees and / or branches are to be mounted at least 1 m away from the line. Tree removal or pruning coordinate the activities of landowner. 4) 4. In the latter case the tender documents, drawing, and image data read in the correct order as compared to the figure data (is more detailed). - The tenderer must sign and return a signing of the contract forwarded no later than 5 working days. In this period the contract signed by the contracting authority seizure of the contracting authority has the right to be treated as RHS § 53 of the successful tenderer for the award of the contract and the refusal of the offer to be withdrawn.

Järvamaa, Roosna-Alliku parish, Kihme village IP2837

Elektrilevi OÜ - KATRIN KARU | Published December 5, 2016
cpvs
45311000

- Repair work is carried out according to the project IP2837. - If the work reveals the need to change the volume of work, it must agree with the order submitted. - Before starting work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - According to drawing a project to repair replace Hill (J-Jaani) AJ village feeder bare overhead conductors for overhead cables. AMKA 3x70 + 95 The volume is 2081 m. Replace the feeder substation Fuses 50 A and 32 A. The separation point 769LP - NB Taken into account in a separate file, the additional terms and conditions: 1) Overhead wire material volumes also take into account all the material related Covenants wirelessly exchange volumes, including all the danger signs, poles, wooden poles pole caps, as well as the need for AMKA kandearmatuur and PMCC first pole connectors. 2) Overhead conductor installation work volumes also take into account all the other work that accompany Covenants masts dressing according to the current requirements, including the old kandearmatuuri disassembly, flush with the tops of trimming puitmastidel mastimütside installation of all masts Placarding. 3) Overhead lines, if necessary, the scope of works includes cleaning of the route so that trees and / or branches are to be mounted at least 1 m away from the line. Tree removal or pruning coordinate the activities of landowner. 4) Resolution Section 769LP feasible fuses offer exchange position B70.080.004 fuses (3f) substitution / installation. 5) In the latter case the tender documents, drawing, and image data read in the correct order as compared to the figure data (is more detailed). - The tenderer must sign and return a signing of the contract forwarded no later than 5 working days. In this period the contract signed by the contracting authority seizure of the contracting authority has the right to be treated as RHS § 53 of the successful tenderer for the award of the contract and the refusal of the offer to be withdrawn.

Electricity Distribution LLC, line maintenance work

Elektrilevi OÜ - Angela Laine | Published October 21, 2016  -  Deadline December 1, 2016
cpvs
77230000, 77210000, 45232200, 45232210

The tender is divided into parts (Part 1 and Part 4): 1.1 Part 1 - Kallaste, Tartu land, Jõgeva line corridor maintenance area; 1.2 Part 2 - Paide, Järva-Jaani line corridor maintenance area; 1.3 Part 3 - Roela, Kill and Little Mary along the corridor service area; 1.4 Part 4 - Võru along the corridor service area; Maintenance Contract map regions are at the tender documents, a file named "regional line corridor maintenance card". EXERCISING work within the successful tenderer undertakes to do the following: 2.1, line maintenance work according to the Republic of Estonia, the current legislation and requirements established by the contracting authority. Cutting waste valleys assembly line onto the field edges or cleaning. 2.3 The owner of the immovable Electricity Distribution LLC Form (Landowner notification letter format) for information regarding the work of the exercise and the owner of the immovable special requirements, coordination of cross cutting felled trees, and the collection and handling of logging residues; Getting forest notifications required for the work; 2.5 felled timber to the owner of an immovable or the use of the property to the person entitled failure, unless the property owner or the person entitled to use the property agrees otherwise in writing by the contractor. Company contract shall take effect on the contract. The work is paid for by the contracting authority in accordance with the unit prices of the transmitted orders. The contract is concluded for three years the right to extend the contract of the contracting twice in one year (3 + 1 + 1). If the supplier has submitted a tender with the lowest total cost of more than two participating in the tender, the contracting authority has the right to choose which parts of it according to the contract provider to conclude, on the basis of all the parts of the tender bids the lowest total cost of the whole.

Substation equipment

Elektrilevi OÜ | Published September 30, 2016  -  Deadline November 8, 2016
cpvs
31682540, 45232220

The tender "Tõstamaa 35/10 kV substation 35 kV and 10 kV switchgear reconstruction and to compensate installation maaühendusvoolude" volume contains the following works:

1. Design work:

1.1. Structural part, including. territory design;

1.2. Switchyard building design;

1.3. Primary Design;

1.4. 35 kV and 10 kV switchgear design;

1.5. Maaühendusvoolude compensation design;

1.6. Secondary design;

1.7. Automatic fire and security alarm systems engineering;

1.8. Backup power (battery) design for mechanics and communications equipment.

2. Construction and installation work Substation:

2.1. Switchyard building construction;

2.2. Service road construction, maintenance work;

2.3. Maandusomatarbetrafo installation;

2.4. Installing the bobbin arc;

2.5. Existing transformer repair;

2.6. Linking an existing transformer new distribution device;

2.7. 10 kV switchgear installation;

2.8. 35 kV switchgear installation;

2.9. The new mast with a switching apparatus, 35 kV metal framework tower cleaning and painting;

2.10. All outgoing 35 kV and 10 kV feeder cable lines with the construction of the installation of the cable sleeves and tying the electricity grid;

2.11. Grounding and lightning protection works;

2.12. The reserve supply of equipment.

3. Secondary Installation and setup work.

4. dismantling:

4.1. The old 10 kV and 35 kV switchgear demolition, in the disposal, and the dismantling of deposit.

Järvamaa, Koeru parish, village Valila, Estonia, IP2838

Elektrilevi OÜ - KATRIN KARU | Published November 24, 2016  -  Deadline December 2, 2016
cpvs
45311000

- Repair work is carried out according to the project IP2838. - If the work reveals the need to change the volume of work, it must agree with the order submitted. - Before starting work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - According to drawing a project to repair replace Valila, Estonia (J-Jaani) AJ F-1 bare overhead conductors for overhead cables AMKA 3x50 + 70 m and a volume of 2,006 house connections for overhead cables AMKA 3x16 + 25 volume 49 m. 9 korduvmaandust and build one mastikaitselüliti. Take into account the additional conditions set out in a separate file .: 1) Overhead wire material volumes also take into account all the material related Covenants wirelessly exchange volumes, including all the warning signs of masts, as well as the need for AMKA kandearmatuur and PMCC first pole connectors. 2) Overhead conductor installation work volumes also take into account all the other work that accompany Covenants masts dressing according to the current requirements, including the old kandearmatuuri disassembly, flush with the tops of trimming puitmastidel mastimütside installation of all masts Placarding. 3) Overhead lines, if necessary, the scope of works includes cleaning of the route so that trees and / or branches are to be mounted at least 1 m away from the line. Tree removal or pruning coordinate the activities of landowner. 4) 4. In the latter case the tender documents, drawing, and image data read in the correct order as compared to the figure data (is more detailed). - The tenderer must sign and return a signing of the contract forwarded no later than 5 working days. In this period the contract signed by the contracting authority seizure of the contracting authority has the right to be treated as RHS § 53 of the successful tenderer for the award of the contract and the refusal of the offer to be withdrawn.

Järvamaa, Roosna-Alliku parish, Kihme village IP2837

Elektrilevi OÜ - KATRIN KARU | Published November 23, 2016  -  Deadline December 1, 2016
cpvs
45311000

- Repair work is carried out according to the project IP2837. - If the work reveals the need to change the volume of work, it must agree with the order submitted. - Before starting work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - According to drawing a project to repair replace Hill (J-Jaani) AJ village feeder bare overhead conductors for overhead cables. AMKA 3x70 + 95 The volume is 2081 m. Replace the feeder substation Fuses 50 A and 32 A. The separation point 769LP - NB Taken into account in a separate file, the additional terms and conditions: 1) Overhead wire material volumes also take into account all the material related Covenants wirelessly exchange volumes, including all the danger signs, poles, wooden poles pole caps, as well as the need for AMKA kandearmatuur and PMCC first pole connectors. 2) Overhead conductor installation work volumes also take into account all the other work that accompany Covenants masts dressing according to the current requirements, including the old kandearmatuuri disassembly, flush with the tops of trimming puitmastidel mastimütside installation of all masts Placarding. 3) Overhead lines, if necessary, the scope of works includes cleaning of the route so that trees and / or branches are to be mounted at least 1 m away from the line. Tree removal or pruning coordinate the activities of landowner. 4) Resolution Section 769LP feasible fuses offer exchange position B70.080.004 fuses (3f) substitution / installation. 5) In the latter case the tender documents, drawing, and image data read in the correct order as compared to the figure data (is more detailed). - The tenderer must sign and return a signing of the contract forwarded no later than 5 working days. In this period the contract signed by the contracting authority seizure of the contracting authority has the right to be treated as RHS § 53 of the successful tenderer for the award of the contract and the refusal of the offer to be withdrawn.
Categories
  Estonia - Show all countries
Tallinn (680)Tartu (82)Rakvere (57)Eesti (46)Tallinn (42)Pärnu (28)Viljandi (24)Auvere küla vaivara vald ida-viru maakond auvere, (22)Eesti vabariik (20)Raekoda tartu, (17)Jõhvi jõhvi, ida-virumaa, (14)Narva (14)Viimsi (13)Kuressaare (11)Jõhvi (9)Lasva küla lasva vald võru maakond lasva, (7)Tallinn-mustamäe (7)Paide (6)Põltsamaa (6)Sauga alevik sauga vald pärnu maakond sauga, (6)Häädemeeste (5)Järve (5)Pärnu (5)Põlva (5)Rapla (5)Sillamäe (5)Tartu (5)Taebla (5)Valga (5)Estonia pst 6 (4)Haljala (4)Kareda vald järva maakond (4)Keila (4)Laagri alevik ja ääsmäe küla , saue vald (4)Puhja (4)Riidaja küla põdrala vald valga maakond riidaja, (4)Saku (4)Saue vald (4)Tallinn, kopli 76 (4)Tallinn, vanasadam (4)Vabaduse väljak 9, tallinn (4)Võru (4)Võrumaa (4)Allikõnnu küla vändra vald pärnu maakond allikõnnu, (3)Elva (3)Faehlmanni 10, faehlmanni 12, gonsiori 21, gonsiori 27 ja kreutzwaldi 14 (3)Haapsalu (3)Hellenurme küla palupera vald valga maakond hellenurme, (3)Ida-virumaa (3)Kilingi-nõmme (3)Laagri (3)Lääne-virumaa (3)Märjamaa alev märjamaa vald, raplamaa, (3)Niidupargi tn 8/12, niidupargi tn 10; niidupargi tn 16 pärnu (3)Paldiski lõunasadam ja paljassaare sadam (3)Peetri (3)Rapla linn (3)Ttü (3)Veedeete ameti hooned ja territooriumid üle eesti (3)Ädala 4f, tallinn (3)Annikoru küla konguta vald tartu maakond annikoru, (2)Eesti elektrijaam auvere küla, vaivara vald, ida-virumaa, (2)Eesti elektrijaam, ida-virumaa, vaivara vald (2)Estonia pst 5a, tallinn (2)Faehlmanni 10, faehlmanni 12, gonsiori 21, gonsiori 27 ja kreutzwaldi 14, tallinn (2)Hariduse 2, kose, harjumaa (2)Harju 9 ja 11, tallinn (2)Harku vald, tabasalu (2)Iisaku (2)Imavere küla imavere vald järva maakond imavere, (2)Jämejala küla pärsti vald viljandi maakond jämejala, (2)Järvselja küla meeksi vald tartu maakond järvselja, (2)Keila (2)Kadrina (2)Keevise 2, tallinn (2)Kiili (2)Kiili vald (2)Kiiu alevik kuusalu vald harju maakond kiiu, (2)Kohtla-järve linn (2)Kohtla-nõmme (2)Kullamaa küla kullamaa vald lääne maakond kullamaa, (2)Kärdla (2)Kääpa küla saare vald jõgeva maakond kääpa, (2)Laagri alevik ja ääsmäe küla saue vald (2)Laekvere (2)Laeva küla laeva vald tartu maakond laeva, (2)Lõõtsa 4, tallinn (2)Mooste alevik (2)Mäo küla (mäo reisiterminal), 72751 paide vald (2)Narva karjäär, vaivara vald, ida-virumaa (2)Narva mnt 7a, tallinn (2)Narva-jõesuu (2)Niidupargi tn 8/12, niidupargi tn 10; niidupargi tn 14, niidupargi tn 16 pärnu (2)Olustvere (2)Padise küla padise vald harju maakond padise, (2)Paldiski (2)Peterburi tee 105 74114 maardu, eeesti energia as iru elektrijaam (2)Pärnu mnt 139 a, tallinn (2)Pärnu mnt 57 / liivalaia 2, tallinn (2)