Building cleaning for the city cleaner

Die Stadtreiniger Kassel - Eigenbetrieb der Stadt Kassel | Published January 5, 2017  -  Deadline February 8, 2017

Construction work

DB RegioNetz Verkehrs GmbH Kurhessen | Published December 24, 2016
But in the northern areas of the former station area Lokbahnhofs Korbach available. 

The following investments are planned under this measure:

Construction of a new workshop for two working states,

Construction of a two-storey factory building following the workshop,

Construction of a cleaning plant (WWTP) with subsequent functional building,

Construction of a new underground mine cleaning,

New construction of outdoor facilities for connection to the track of DB Netz AG as well as roadside development,

Construction of new facilities for media supply and disposal,

Construction of a rainwater reservoir for the introduction of rainwater into the Muffiansgraben.

Workshop hall:

- The newly built workshop hall is a double track, single-storey plant, each with a working state.

11,40 m at the ridge of the saddle roof.

Industrial buildings:

- The longitudinally adjacent to the workshop hall, two-storey factory building is monolithic, built in masonry construction.

46.6 m long, 8.7 m wide and 7.8 m (First) high.

ARA with functional building:

- The ARA consists of the wash bay and functional buildings and is built to the west to the workshop on the track 14th

56,80 m and a width of 8.19 m.

Track construction:

- 430m track delivery and installation.

Points heating.

road:

Drainage.

Kabeltief- and pipeline.

Rainwater retention basin area 750 m 2 with dividing structure,, sedimentation and throttle structure.

New electrical equipment in workshop shed, operating buildings, cleaning plant and function building

- Distribution system (main and sub-distribution).

- Lighting systems including emergency lighting.

- Socket systems (electrants).

Connections of provided resources.

Power installations.

- Grounding / potential equalization.

Waste and water systems

Supply and waste pipes.

- Domestic hot water production with distribution in the office building and the workshop (loop).

- Drinking water and hot water distribution networks in the functional building and ARA.

- Wastewater and sewage networks in all buildings, with underground pipes in the ground.

Heating systems

- Heat with boiler (118 kW) and CHP (39/20 kW).

- Heat distribution networks for static heating system (operational and functional building).

- Floor heating (social facilities and working pits).

- Radiant ceiling panels (workshop and ARA).

Washing Technology + Abwasserreinigungsanlage

WC washing machine,

Exhaust Gas Extraction,

RadAufstandsKraftMessEinrichtung (RAKME)

Trucks for Powerpack exchange,

Crane,

Roof Platforms.

The individual machine installations are advertised with functional service descriptions.