Call +44 800 9755 164

Public tenders for cleaning in Winterthur Switzerland

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!

Cleaning and sanitation services

ZHAW Zürcher Hochschule für Angewandte Wissenschaften | Published December 9, 2015  -  Deadline February 15, 2016
cpvs
90900000

Cleaning services at the ZHAW.

Sewage, refuse, cleaning and environmental services

ZHAW Zürcher Hochschule für Angewandte Wissenschaften | Published June 24, 2015  -  Deadline August 7, 2015
cpvs
90000000

Cleaning services at the ZHAW.

Sewage, refuse, cleaning and environmental services

ZHAW Zürcher Hochschule für Angewandte Wissenschaften | Published February 11, 2015  -  Deadline March 20, 2015
cpvs
90000000

Cleaning Services ZHAW.

Cleaning and sanitation services

ZHAW Zürcher Hochschule für Angewandte Wissenschaften | Published April 6, 2016
Winner
Splendida Services AG
cpvs
90900000

Cleaning Services ZHAW Campus technical and Eulachpassage, 8401 Winterthur.

Cleaning services

Dürsteler Bauplaner GmbH Herr Kevin Siewerdt | Published January 9, 2016
Winner
DS Facility Services AG
cpvs
90910000, 90911200, 90911300, 90919300

Sihlquai87 - 287 Baureinigung.

Cleaning services

Dürsteler Bauplaner GmbH | Published October 14, 2015  -  Deadline November 18, 2015
cpvs
90910000, 90911200, 90911300, 90919300

Cantonal protected object. Gentle Renovation resp. Reconstruction of the whole school building. Gross floor area approximately 14 500 m2. Basement, ground floor, 1-4.Obergeschosse, attic.

Cleaning services

Departement Technische Betriebe/Stadtbus Winterthur | Published November 25, 2015
cpvs
90910000, 90917000

Tägliche Innenreinigung der Busse 2015 bis 2020.

School cleaning services

Stadt Winterthur Einkauf & Logistik | Published July 7, 2015
Winner
Vebego AG
cpvs
90919300

Reinigungsleistungen Schulhaus Zinzikon.

Sewage, refuse, cleaning and environmental services

ZHAW Zürcher Hochschule für Angewandte Wissenschaften | Published October 21, 2015
Winner
Splendida Services AG
cpvs
90000000

Reinigungsleistungen ZHAW Areal Lagerstraße, 8004 Zürich.

Sewage, refuse, cleaning and environmental services

ZHAW Zürcher Hochschule für Angewandte Wissenschaften | Published June 3, 2015
Winner
ISS Facility Services AG
cpvs
90000000

Reinigungsleistungen ZHAW Campus Reidbach, 8820 Wädenswil.

Road-maintenance vehicles

Stadt Winterthur, Departement Bau Tiefbauamt | Published February 4, 2015  -  Deadline March 13, 2015
cpvs
34144400, 34113000

Delivery of 1 Combi recycling sewer cleaning vehicle on a 4-axle truck with an option for a further combined recycled sewer cleaning vehicle with flocculants or filter system.

Road-maintenance vehicles

Stadt Winterthur, Departement Bau Tiefbauamt | Published February 18, 2015  -  Deadline March 27, 2015
cpvs
34144400, 34113000

Combined Recycling sewer cleaning vehicle on a 4-axle truck with an option for a further combined recycled sewer cleaning vehicle with flocculants or filter system on a 4-axle truck.

Vorlos 2 - SABA Grütwisen + Birch Street, stacking tank cover Katzen and revitalization Katzenbach South

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published April 22, 2015  -  Deadline June 1, 2015
cpvs
45000000

In the new system, the road runoff is managed and purified by two street sewage plants: SABA Grütwisen 26 m. Although SABA Birchstrasse The bottom of the pit is in the ground, but according to testimony of geologists are the fuse with Rühlwänden and drainage sumps with feasible. The placed on plot of SABA Grütwisen stacking tank of coverage to be executed later in connection with the main work Katzen is provided for retaining the cleaning water from the tunnel cleaning and is realized simultaneously with the SABA Grütwisen. Not only assembly, but also the commissioning of mechanical parts (pumps, valves, etc.) belong to the performance of the company this tender. Interface BSA - Construction - The BSA brings power (cable) and communication cables to locations VK at pumping station 1 (SABA Grütwisen) and pumping station 2 (SABA Grütwisen), respectively, to the transformer TS Colonel Wood (SABA Birchstrasse) tests and acceptance) the respective low-voltage distribution, control cabinets as well as pumps and internal Verkablungen etc. He reports the builder the finished plant as a takeover ready for testing and training phase. Then follows the 8-week training facility for the attention of the territorial unit GE VII. It should then be made within 4 weeks Revitalization Katzenbach south section SABA Grütwisen also takes place in parallel with the work on the retention filter basins of SABA Grütwisen. The main quantities are: (decisive advance the mass of the bills are) 460 560 m3 t 13,000 m3 2,400 m 2,200 m 2,200 36 St. St. St. 7 27,500 m3 2,250 m3 27 m 7 '600 m2 450 m2 32,500 St. 800 m 10,500 m2 2'300 m2 250 t 510 t 205 t - drainage, concrete pipes about 70 m 75 m 620 m 30 36 St. St. 5'500 m2 620 t 6 pcs of 11,500 m 4,200 m3 6,700 kg

Construction work

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published April 25, 2015  -  Deadline June 1, 2015
cpvs
45000000

In the new system, the road runoff is managed and purified by two street sewage plants: SABA Grütwisen 26 m. Although SABA Birchstrasse The bottom of the pit is in the ground, but according to testimony of geologists are the fuse with Rühlwänden and drainage sumps with feasible. The placed on plot of SABA Grütwisen stacking tank of coverage to be executed later in connection with the main work Katzen is provided for retaining the cleaning water from the tunnel cleaning and is realized simultaneously with the SABA Grütwisen. Not only assembly, but also the commissioning of mechanical parts (pumps, valves, etc.) belong to the performance of the company this tender. Interface BSA - Construction - The BSA brings power (cable) and communication cables to locations VK at pumping station 1 (SABA Grütwisen) and pumping station 2 (SABA Grütwisen), respectively, to the transformer TS Colonel Wood (SABA Birchstrasse) tests and acceptance) the respective low-voltage distribution, control cabinets as well as pumps and internal Verkablungen etc. He reports the builder the finished plant as a takeover ready for the test - and training phase. Then follows the 8 --week training facility for the attention of the territorial unit GE VII You should then be made within 4 weeks Revitalization Katzenbach south section SABA Grütwisen is also carried out in parallel with the work on the retention filter basins of SABA Grütwisen.. The main quantities are: (decisive advance the mass of the bills are) 460 560 m3 t 13,000 m3 2,400 m 2,200 m 2,200 36 St. St. St. 7 27,500 m3 - Unterlags 2'250 m3 27 m 7'600 m2 450 m2 32,500 St. 800 m 10,500 m2 2'300 m2 250 t 510 t 205 t - drainage, concrete pipes about 70 m 75 m 620 m 30 36 St. St. 5'500 m2 620 t 6 pcs 11,500 m 4,200 m3

Installation services of electrical equipment

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published May 20, 2016  -  Deadline June 27, 2016
cpvs
51110000

The benefits of the procurement object D 1.2 include the low-voltage systems for the coverage Katzensee, the coverage stilts electro-spaces open route to the northern bypass of Zurich and the electrical room Wehntalerstrasse. The low-voltage equipment for the 3rd tube Gubristtunnel and for 1st and 2nd tube Gubristtunnel are advertised as options. The building owner reserves the right to perform only one or no option.

The services to be provided relating to the supply and installation of:

- Low-voltage main distribution Normal network,

- Low-voltage main distribution UPS power,

- Low-voltage sub-distribution,

- UPS,

- Battery condition,

- Low-voltage measurements and leads to the RU

- Low-voltage wiring from the transformer and between the distributions of energy supply,

- Control / field calculator including data cabling to the interface communication.

- Grounding of low voltage systems,

- Cleaning the cabinets of all trades under tension

- Surge protection components for all trades,

- Decommissioning of the existing low-voltage systems.

Construction work

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published October 7, 2015  -  Deadline November 11, 2015
cpvs
45000000

For the routing of the N01 the early 70s of the slope was cut sometimes massively. When building up stability problems, which led to the creation of the anchored pile wall Rossberg showed. To ensure the long-term slope stability Rossberg existing anchors are replaced by new permanent strand anchors. The slope is monitored using inclinometers. In the inclinometers to date no relevant shifts were observed. The slope can be currently evaluated by the anchored pile wall as stable. Repair pile wall Rossberg: - replacement of all anchor rod by controllable Strand; - Amplifying the head bar and the Longarine; - Introducing cement stabilization behind the existing head beams to ensure the anchor force into the building; - Local repair existing bored piles; - Demolition and rebuilding of the drainage channel on the Longarine; - Demolition and replacement of drain shell before Longarine; - Demolition guiding barrier and Wildlife fence on top bar; - Supply and installation guiding barrier and Wildlife fence on top bar; - Maintenance position Unterhaltsweg: foundation layer and outer layer with Netstalerstrasse. Repair of existing drainage of slopes on the mountain side of the pile wall: - replacement of drainage channels in individual areas; - Align and rerouting of shifted drainage channels; - Cleaning and adjustment work.
  • 1