Public tenders for cleaning in Estavayer-le-lac Switzerland

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!
CleaningSwitzerlandestavayer-le-lac

N01 Upn.Bernex - Ferney - VOMA Tunnels Confignon and Vernier - provision of scanning equipment and permanence of staff - lot 3.

Office fédéral des routes — infrastructure routière Ouest Filiale Estavayer-le-Lac | Published February 17, 2016  -  Deadline March 23, 2016
cpvs
90612000

Availability of personnel and equipment to scan floor motorway (available 7/7 with 60 minutes delay on site).

Cleaning motorway tunnels at the request of the management of work (planning in 1 week).

Providing personal with specific permit for nacelle driving.

pipe cleaning and cleaning / pumping oil separator system.

Sewer survey and sewage treatment consultancy services

Office fédéral des routes — Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published October 28, 2017  -  Deadline December 8, 2017
cpvs
90490000

The purpose of this contract is to carry out video inspections of the vaults or parts of the vaults that could not have been inspected by FEDRO due to the inaccessibility of a person. The inspections must be preceded by a cleaning if necessary of the part to be inspected.

Street-cleaning and sweeping services

Service achats transports publics genevois | Published May 2, 2015  -  Deadline June 8, 2015
cpvs
90610000

Cleaning work flow bags tramways for the period 2015-2018.

N09 - Ant. Montreux - Roche - Restoration work balance coatings Montreux 2015 - Lot 87

Office fédéral des routes - Infrastructure routière Filiale Estavayer-le-Lac | Published March 25, 2015  -  Deadline May 4, 2015
cpvs
45233210

Repair Work Night coatings, floor off traffic (bidirectional on the other floor). Work will take place on the N09 towards Lausanne (stop band of plus emergency). Treatments coatings between km 33 + 613 to km 31 + 100 mountain road, including the entrance ramp from the junction of Montreux, floor mountain. • Treatment envisaged on the majority of the sector (except long weekends): o 50mm milling and cleaning. o o Pose Pose SAMI 10mm 40mm PA11 • Treatment envisaged on the deck of Vuarennes o 55mm milling and cleaning. o o Pose Pose SAMI 10mm 45mm PA11 • Treatment envisaged for the input Montreux floor Mountain strap: 50mm Milling o o Pose AC MR11 50mm • Number of nights laying planned: o 6-nights steps • Tonnage and principal amounts estimated: o PA11: 1800 to SAMI: 20'000 m2 o Milling: 20,000 m2

Construction work

Office fédéral des routes — Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published November 7, 2017  -  Deadline November 20, 2017
cpvs
45000000, 45442121

The mandate concerns civil engineering services for the protection of the vault of the "Les Vignes" and "de Combette" tunnels and the "Chantemerle" gallery on the N01 towards Morat.

Work to be done:

- Cleaning / preparation of concrete surfaces with high pressure water 140 000 m²

- Application of a 17 000 m² "pore mouth" coating, a 59 000 m² paint and a hydrophobic impregnation 23 000 m²

- Cleaning graffiti in various places and on different types of surfaces 1,950 m²

The works are scheduled between June and September 2018 and will last about 10 nights for each direction.

Detailed description: see draft contract.

Construction work

Office fédéral des routes — Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published September 27, 2017  -  Deadline November 8, 2017
cpvs
45000000, 45442121

The mandate concerns civil engineering services for the protection of the tunnel "Les Vignes" and "de Combette" tunnels and the "Chantemerle" tunnel on the national road N01 towards Murten.

Work to be done:

- Cleaning / preparation of concrete surfaces with high pressure water 140,000 m²

- Applying a 17,000 m² "pore-filled" coating, a 59,000 m² paint and a hydrophobic impregnation 23,000 m²

- Cleaning of graffiti in different places and on different surfaces 1,950 m²

Work is planned between June and September 2018 and will last approximately 10 nights for each direction.

Detailed description: see draft contract.

The mandate concerns civil engineering services for the protection of the tunnel "Les Vignes" and "de Combette" tunnels and the "Chantemerle" tunnel on the national road N01 towards Murten.

Work to be done:

- Cleaning / preparation of concrete surfaces with high pressure water 140,000 m²

- Applying a 17,000 m² "pore-filled" coating, a 59,000 m² paint and a hydrophobic impregnation 23,000 m²

- Cleaning of graffiti in different places and on different surfaces 1,950 m²

Work is planned between June and September 2018 and will last approximately 10 nights for each direction.

Detailed description: see draft contract.

Cleaning and maintenance of communal buildings and public facilities

Commune de Bardonnex | Published May 8, 2017  -  Deadline May 26, 2017
cpvs
90911200

Cleaning and maintenance of communal buildings and public facilities

Cleaning and maintenance of communal buildings and public facilities

Commune de Bardonnex | Published April 24, 2017  -  Deadline May 10, 2017
cpvs
90911200

CPV: 90911200 - Building-cleaning services
Construction cost code (CFC): 1487 - Building Cleaning
Catalog of standardized articles (CAN): 683 - Maintenance Cleaning

Bridge renewal construction work

Office fédéral des routes — infrastructure routière Ouest, filiale Estavayer-le-Lac | Published November 25, 2015  -  Deadline January 15, 2016
cpvs
45221119

The project includes the D16 Bridge sanitation in traffic on the route of the N16 at Km 77 840 (downlink), the right of Rondchâtel western half junction. The book has a length of 90 m and a width of 12.60 m with 3 traffic lanes. Main services to be provided are: - hydrodemolition and reconstruction borders, - localized cleaning of the intrados and batteries, - replacement of the entire sealing and coating, - replacement of the expansion joints, - reconstruction of Battery support Appliance and abutments, - replacement and increasing existing networks - runoff - tube battery, - establishment of a road restraint system passing under the structure.

N12.80 120 036 - PI SBB Matran sanitation - Apron Remediation and gaskets

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published January 18, 2016  -  Deadline February 29, 2016
cpvs
45262330

This project involves the rehabilitation, in traffic, deck and wing walls of the underpass Matran which allows the line CFF Lausanne-Berne pass under the A12. This project will include work including site installations, dismantling and restoration of places: Wing Walls: Cleaning surfaces exposed water jet at high pressure, hydro-demolition high pressure of the damaged concrete, cleaning corroded steel reinforcements, crack injection, applying an adhesive bridge and reprofiling, applying a protective coating. Trim: Hydrodemolition high pressure of damaged concrete, applying an adhesive bridge and reprofiling applying a regularization mortar surfaces, application of a protective coating. Slab milling the asphalt surface, hydro-demolition high pressure concrete deck damaged, cleaning of corroded reinforcing steel, application of an adhesive bridge and reprofi-lage surfaces, pore closure and regularization of surfaces. Runners: new slides Sealing Fixing: installation of a new sealing Bituminous Coating: Execution of asphalt surfacing In addition to SBB PI's work, it is intended to replace joints Matran viaduct located just beside the SBB IP and replace grills on the sector. Joints: Removing the door seal Sanitation support Implementation of new o Rehabilitation of transition strips between the seal and asphalt, asphalt grids replacement: Replacement of approximately 24 grids on the work of the Sector Plan Traffic during construction will enable to maintain two lanes per direction cir-culation 24h / 24h.

Upn.Bernex N01 - Ferney - VOMA intertube, works Confignon GC-Vernier - Lot 1

Office fédéral des routes - Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published October 28, 2015  -  Deadline December 18, 2015
cpvs
45221241

Realization night 7/7 urgent work Works upgrading the safety of existing motorway tunnels Confignon and Vernier: - Creation of 12 new pedestrian link between the motorway galleries France and Lausanne existing tubes. - Excavation and retaining immune umbrellas vaults in old alluvium and in Würmian molasses. - Compliance of 10 existing gates connecting galleries. - Repair works in existing tubes main quantities: - Excavation: 4,000 m3 - Shotcrete: 3,000 m3 - metal hangers: 90 to - Metal tubes umbrella vault: 6000 ml - Poured concrete: 2,700 m3 - Frame: 90 to - Water resistance: 3,600 m2 - News sliding doors: 42 pcs - Painting to the right of GL: 2,000 m2 - Injection of cracks and filling concrete joints of the lining: 1,500 ml - repair curbs and cracked concrete gutters: 400 ml - cleaning and maintenance work conduits and pipes: 1,000 ml

Road tunnel construction work

Office fédéral des routes — infrastructure routière Ouest filiale Estavayer-le-Lac | Published October 31, 2015  -  Deadline December 18, 2015
cpvs
45221241

Realization night 7/7 urgent work Works upgrading the safety of existing motorway tunnels Confignon and Vernier: - Creation of 12 new pedestrian link between the motorway galleries France and Lausanne existing tubes. - Excavation and retaining immune umbrellas vaults in old alluvium and in Würmian molasses. - Compliance of 10 existing gates connecting galleries. - Repair works in existing tubes main quantities: - Excavation: 4,000 m3 - Shotcrete: 3,000 m3 - metal hangers: 90 to - Metal tubes umbrella vault: 6000 ml - Poured concrete: 2,700 m3 - Frame: 90 to - Water resistance: 3,600 m2 - News sliding doors: 42 pcs - Painting to the right of GL: 2,000 m2 - Injection of cracks and filling concrete joints of the lining: 1,500 ml - repair curbs and cracked concrete gutters: 400 ml - cleaning and maintenance work conduits and pipes: 1,000 ml.

Construction work

Office fédéral des routes — infrastructure routière Ouest, filiale Estavayer-le-Lac | Published December 2, 2015  -  Deadline January 29, 2016
cpvs
45000000

The project involves the construction of a roundabout below the ramp to the motorway junction half Morat No. 29 West, at the intersection with the main road (axis No. 3400 Fribourg road network). The project includes: - the roundabout construction work, including demolition of the existing intersection islands, excavations and earthworks, civil works for the plot, adaptation of harvesting and disposal system of floor waters, adapting services and adaptation of the restraint systems. - The joint implementation of maintenance work (cleaning coatings and edges) on the main road of the Confederation property line. - The realization of an earth retaining structure army in connection with a local service road. - Work signaling and marking. One of the main challenges lies in carrying out the work at the intersection of a highway characterized by a high traffic load (almost 20,000 vehicles / day) and motorway access which must be maintained in all circumstances.

Concrete repair work

Office fédéral des routes — infrastructure routière Ouest filiale Estavayer-le-Lac | Published January 21, 2016  -  Deadline February 29, 2016
cpvs
45262330

This project involves the rehabilitation, in traffic, deck and wing walls of the underpass Matran which allows the line CFF Lausanne-Berne pass under the A12.

This project will include work including site installations, dismantling and restoration of places:

Wing Walls:

Clean the surfaces exposed water jet at high pressure, hydro-demolition high pressure of the damaged concrete, cleaning of corroded steel reinforcement, crack injection, application of an adhesive bridge and reshaping, applying a coating protection.

Borders:

Hydrodemolition high pressure of damaged concrete, applying an adhesive bridge and reprofiling applying a regularization mortar surfaces, application of a protective coating.

Slab:

Milling the asphalt surface, hydro-demolition high pressure concrete deck damaged, cleaning of corroded steel reinforcement, application of an adhesive bridge and reprofi-lage surfaces, pore closure and regularization of surfaces.

Runners:

Setting new slides.

Water resistance:

Installation of "a new seal.

Asphalt covering:

Running the blacktop.

In addition to SBB PI's work, it is intended to replace joints Matran viaduct located just beside the SBB IP and replace the grids on the sector.

Expansion joints:

Removing the door seal.

Sanitation support.

Establishment of the new joint.

Transition bands rehabilitation, between the seal and asphalt, asphalt.

Replacing grids:

Replacing "about 24 grids on the work area.

The traffic plan during construction should allow to maintain two lanes per direction 24h / 24h.

Engineering services

Office fédéral des routes — Infrastructure routière Ouest Filiale Estavayer-le-Lac | Published November 4, 2017  -  Deadline December 13, 2017
cpvs
71300000

This mandate concerns the following two structures located on the N12 U43 Riaz - Ecuvillens maintenance section:

1) The bridge over the Gerignoz at km 30.0;

2) The Chaney viaduct at km 37.7.

Following the report of the poor state of these works, on the basis of various studies (inspections, investigations, etc.) as well as the findings of UT II, ​​FEDRO decided to carry out the remediation of these early (VOMA) compared to the major maintenance project (UPlaNS) planned after 2030.

The projected measures can be summarized as follows:

- bridge over the Gérignoz: complete restoration, in particular the replacement of the watertightness, the coating, the road joints as well as the cleaning of the curbs and the drainage system,

- Chaney Viaduct: Partial rehabilitation, in particular replacement of road joints and ad hoc remediation of various elements.

This mandate concerns the following two structures located on the N12 U43 Riaz - Ecuvillens maintenance section:

1) The bridge over the Gerignoz at km 30.0;

2) The Chaney viaduct at km 37.7.

Following the report of the poor state of these works, on the basis of various studies (inspections, investigations, etc.) as well as the findings of UT II, ​​FEDRO decided to carry out the remediation of these early (VOMA) compared to the major maintenance project (UPlaNS) planned after 2030.

The projected measures can be summarized as follows:

- bridge over the Gérignoz: complete restoration, in particular the replacement of the watertightness, the coating, the road joints as well as the cleaning of the curbs and the drainage system,

- Chaney Viaduct: Partial rehabilitation, in particular replacement of road joints and ad hoc remediation of various elements.

Motorway construction works

Office fédéral des routes — infrastructure routière Ouest filiale Estavayer-le-Lac | Published October 31, 2015  -  Deadline December 11, 2015
cpvs
45233110

Detailed project description / tasks * The work to be performed are within the framework of the traffic security (step 2) of the national road section Vallorbe - Essert-Pittet (N09). The boundaries of the project are part TP2 defined to the west by the junction No.1 Ballaigues (PR + 10.320) and to the east by Junction No. 3 Orbe (PR + 120 380). The objective of the project "Securing traffic - Step 2" is to keep the substance of the existing alignment, to ensure user safety and preserving the ability to service through maintenance measures technically and economically optimized in the Pending completion of the UPlaNS around section. The main work on the course are to: - Comply lateral restraints; - Remove roof slope on the future BAU affected normal route; - Conduct stopping places; - Strengthen the BAU; - Create a battery of tubes under the BAU; - Build new BSA infrastructure; - Sanitize asphalt pavements; The main work on structures are: - Participate in the change or sanitation supports - Vériner of structures - Participate replacement, sanitation or removing expansion joints - Cleaning up bituminous coatings and waterproofing works; - Conduct patching work.

Engineering works and construction works

Office fédéral des routes — infrastructure routière Ouest, filiale Estavayer-le-Lac | Published November 18, 2015  -  Deadline February 5, 2016
cpvs
45220000

Major maintenance work of renewal and development of the section between the junction of Belmont 11 (km 11 + 800) and the rest area "Lavaux" (km 14 + 030) of National Road N09. This stretch includes the slip road between the interchange of La Croix and the half-junction Lutry. The consignment includes the following work: Road construction: - enlargement of parts of stretch to ensure the width of 12.10 m in Phase 4/0 work, - organization of TPC, - replacement of the binding layer and the road surface on the stretch, - adaptation of the road geometry / widths of lanes, - maintenance of existing devers or partial improvement - Renewal fences, - renewal of the horizontal and vertical signage, - using the hard shoulder as a path normal traffic during heavy traffic (PUN way) - deflecting passages modification and construction of 2 new bypass passages. Drainage: - disconnect external watersheds - change pipes in poor condition and less than 250 mm diameter - water treatment plant (SETEC). Structures: - maintenance and sanitation of two culverts, 5 underpasses, 7 overpasses and bridges 2. Noise barriers and walls: - maintenance and cleaning of walls 22 (including 13 non-anchored walls) and 2 PAB. The Owner reserves the right to perform or not the optional works (new PAB and SETEC). In any case, the bidder may not receive compensation from this.

Supporting walls

Office fédéral des routes — infrastructure routière — filiale Estavayer-le-Lac | Published August 5, 2015  -  Deadline September 18, 2015
cpvs
45262620

Lot 85: Rehabilitation works of three retaining walls on the Chexbres-Montreux stretch of the A9 motorway. Cleaning up these walls of undertaking the following activities: - G-wall 09M049: upstream weight wall with temporary support type Berlin wall - Wall-09M050 G: new concrete facing with placement of anchors - Wall 09MR067: keying joints of the existing structure and new siding sole forward. Lot 86: Rehabilitation works of 14 retaining walls on the Montreux section; - Rock the A9 motorway: - Wall 09PI704 subway access. Sanitation with a new butonné siding - Wall-09M071 G: new wall downstream weight - 09M072-G wall: new wall downstream weight - 09M073-G wall: new siding anchored - 09M074-G wall: new siding anchored - 09M075 Wall -G: new siding anchored - 09MR124 wall: existing wall under the railway. Sanitation with a new wall upstream weight - Wall 09M076-G: again anchored siding - Wall 09M077-D: Wall upstream weight - Wall 09M079-G: again anchored siding - Wall 09M081-G: again anchored siding - Wall 09MR127: new siding anchored - 09M089-G wall: new anchored siding - Wall 09M090-D: new wall upstream weight. The duration of the work must be minimized and the progress of the work will be done in two shifts per item.

N09 Bridge Flon - Drainage - DLT for civil engineering services

Office fédéral des routes - Infrastructure routière Filiale Estavayer-le-Lac | Published January 19, 2015  -  Deadline March 2, 2015
cpvs
71300000

The bridge over the Flon, also known viaduct Chocolatière, is located on the A9 motorway between junctions Blécherette and Vennes, from km 7.20 to 7.60. It consists of a bridge right (direction Vevey) and a Left bridge (Villars-Sainte-Croix direction), respectively dating from 1964 and 1973. This is long arch bridges of 434.30 m, each with 4 Gerber joints. Originally scheduled to address the remediation of Gerber joined the project launched in 2013 has expanded to handle all the necessary remediation on the bridge over the Flon according to UPlaNS philosophy. The idea now is to guarantee the conditions for security and continuity of the work as a whole until the next UPlaNS 09U of Villars-Sainte-Croix section - Vennes, expected in 2025-2026. The measures identified in phase MP and planned over 3 years, are: - demolition and reconstruction of the two joined Gerber No. 1 and No. 4; - Sanitation and keying the two joined Gerber 2 and 3; - Shear reinforcement struts of the deck in the bows of the area; - Complete cleaning of concrete on the arches and the deck surface; --Time consolidation of the concrete on the rest of the book; - Demolition and reconstruction of the coating, with installation of a seal affixed; - Demolition and reconstruction of a border, according to the OMA's recommendations and to allow 4-0 without expanding bridges; - Rehabilitation of automatic salting system; - Demolition and installation of a new collection system for floor water; - Removal and installation of new PAB. This tender concerns the local construction management for N09.48 remediation 120048 Bridge project on Flon, according to the maintenance philosophy UPlaNS.

Street-cleaning and sweeping services

Service achats transports publics genevois | Published September 25, 2015
cpvs
90610000

Travaux de curage des sacs d'écoulement des voies de tramways pour la période 2015 à 2018.