Call +44 800 9755 164

Public tenders for cleaning in Nivelles Belgium

Find all Cleaning tenders in the world.
Finding business opportunities has never been easier.

Results for cleaning. Make a new search!

Cleaning of textile articles

Zone de Police Nivelles-Genappe | Published June 10, 2015  -  Deadline June 24, 2015
cpvs
18000000

The services are designed to dry cleaning or water of textile articles. The contract will be concluded for a period of two years. The market is divided into stations.

cleaning of common areas and offices

Habitations Sociales du Roman Païs | Published August 1, 2016  -  Deadline September 21, 2016
cpvs
90911000, 90919000

cleaning of common areas and offices

Cleaning of vehicles of the Police Zone

Zone de Police Nivelles-Genappe | Published April 16, 2015  -  Deadline April 28, 2015
cpvs
50110000, 50100000

Cleaning of vehicles of the Police Zone

Cleaning vehicles Police Zone

Zone de Police Nivelles-Genappe | Published June 10, 2015  -  Deadline July 1, 2015
cpvs
98000000

The services are designed interior and exterior cleaning of vehicles in the car park of the Nivelles-Genappe Police Zone. Alleged amounts are expressed in hours. The worker made available to the contractor will clean vehicles as needed adjudicteur of power. Minimum three external cleaning must be carried out in 1 hour. Minimum two indoor / outdoor cleaning must be carried out in 1 hour. The fleet consists of: -4 -20 combis vehicles for the transport of persons -3 -2 vans motorbikes -1 trailer

Accommodation, building and window cleaning services

Habitations sociales du Roman Païs | Published August 5, 2016  -  Deadline September 21, 2016
cpvs
90911000

Cleaning of common areas and offices.

Ditching and cleaning of drainage structures to IBW

Intercommunale du Brabant wallon (Nivelles) | Published January 15, 2015  -  Deadline March 6, 2015
cpvs
90513700

These cleaning and cleaning of drainage structures of the BWI: pumping stations, lifting sheets of wastewater, stormwater basins, collectors ... The dissection is carried out in such a way that it no longer exists any non-adherent deposit, sediment or obstacle in the works. This contract also includes pumping and transportation to an authorized treatment center. The contract period is: one year (renewable once a year). Included in the market: • The cleaning operations and pumping material in the works. • The transportation of materials to the receiving sites. • The time required for the opening and closing of the gates of the sites (same building). Provision of administrative and technical documents enabling the contracting authority to ensure the traceability of contents. • The time required for cleaning works to be cleaned, equipment room, where road runoff could take place. • The time needed for the preparation of weekly planning, coordination meeting ... • Associated costs: all costs of any kind for its successful end service including the costs of necessary connections for compatibility pipes, cleaning tanks used for purposes other than transportation of sludge. As such, we hope that any supplier, contractor or tenderer meets the environmental policy enforced on all sites of IBW. Prior to the filing of the offer, bidders are expected to have read the infrastructure (path and roads, pumping conditions, water intakes ...). Important: Several times a year, it will be asked the contractor to proceed with the pumping of input channels treatment plants Rosieres, Lower Wavre, Hain Valley and Waterloo. In view of the environmental impact of STEP, the response time is very short to prevent discharge of sewage into the river.

Cleaning and maintenance of buildings saniatire of Nivelles-Genappe police zone

ZONE DE POLICE NIVELLES-GENAPPE | Published June 21, 2016  -  Deadline August 24, 2016
cpvs
90900000

Cleaning and sanitary maintenance of the buildings of the Nivelles-Genappe police zone

Sewage, refuse, cleaning and environmental services

Intercommunale du Brabant wallon | Published April 13, 2016  -  Deadline May 30, 2016
cpvs
90000000

This service contract covers transport and tri-grouping of WEEE (waste electrical and electronic equipment) to make available to Recupel.

These wastes are from the collection of the container parks of the IBW.

The contracting authority will inform the contractor of the evolution of environmental agreement (reversals obligations) or other on this market.

Sewage, refuse, cleaning and environmental services

Intercommunale du Brabant wallon | Published June 11, 2016
Winner
R.APP.EL SCRL-FS
cpvs
90000000

This service contract covers transport and tri-grouping of WEEE (Waste Electrical and Electronic Equipment) to make available to RECUPEL.

These wastes are from the collection of the container parks of the IBW.

The contracting authority will inform the contractor of the evolution of environmental agreement (reversals obligations) or other on this market.

ecological cleaning and maintenance of green spaces of Central Office

ZONE DE POLICE NIVELLES-GENAPPE | Published February 23, 2016  -  Deadline March 22, 2016
cpvs
77310000

Maintenance of green areas and settlements to the Central Office. The maintenance of these areas as specified in the tender documents and qualified green.

Ecological and cleaning maintenance of green areas of the Central Office

Zone de Police Nivelles-Genappe | Published April 2, 2015  -  Deadline April 13, 2015
cpvs
51000000

Ecological maintenance of green areas and plantations in Central Office.

Sewage, refuse, cleaning and environmental services

Intercommunale du Brabant wallon | Published December 8, 2015  -  Deadline January 11, 2016
cpvs
90000000

The contract concerns the weekly garbage collection in the towns of Wavre, Incourt and Walhain and the collection of Christmas tree on Wavre.

Sewage, refuse, cleaning and environmental services

Intercommunale du Brabant Wallon | Published December 6, 2014  -  Deadline January 12, 2015
cpvs
90000000

The market has two positions: Position 1: the weekly garbage collection in the communes of Lasne Nivelles La Hulpe and Court-Saint-Étienne. Station 2: collection of green waste on La Hulpe.

Pumping, removal and transportation of liquid sludge from small sewage treatment plants of the BWIs

Intercommunale du Brabant wallon (Nivelles) | Published July 14, 2015  -  Deadline August 28, 2015
cpvs
90513900

This contract is to ensure pumping, removal and transport 13760 m3 / year (24,500 m3 / 2years) slurries (dryness lower than 5% solids) (estimated quantities). This is sludge from small decentralized stations that must be sent to larger centers that can dehydrate. The contract is for a period of 2 years (1 year renewable 1 x 1 year). Included in the company: • The pumping sludge thickeners, storage silos or basin in transport tanks. • The transportation of sludge to the receiving sites. • The time required for opening and closing the gates of the sites (same building). • The time required for the drafting of waybills. Provision of administrative and technical documents enabling the contracting authority to ensure the traceability of sludge. • The time required for cleaning of roads, utility room where the sludge flows could occur. • The time required for the preparation of the weekly planning, coordination meeting of security ... • Associated costs: all costs of whatever nature, to finalize the service, including the costs of connections needed to ensure compatibility of pipes, cleaning tanks used for purposes other than transport sludge. The IBW is certified EMAS-ISO14001. As such, we hope that any supplier, subcontractor, or agent complies with the environmental policy implementation on all sites of the BWIs. Before filing the offer, bidders are expected to have: • considered the infrastructure (path and roads), and • making the necessary scrutineering. An optional site visit is possible (see III.1.2 spot "visit sites").

Draining of the exclusive avenue Arsène Tournay in Villers-la-Ville

Intercommunale du Brabant wallon | Published September 13, 2016  -  Deadline October 28, 2016
cpvs
45232411

The work includes:

 The connection to Villers-la-Ville collector

 The felling of some trees

 The supply and installation of a network of 90 m DN400 mm polypropylene with manholes

 The construction of a storm overflow

 The cleaning of the hole channeling the river "La Thyle"

 The implementation of a sytem for working "dry feet"

 The construction of a concrete base slab in the sluice channeling the river "La Thyle"

 The construction of two walls for receiving the individual connections to buildings and dry weather flow

 Adaptation individual connections inside of the hole

 The construction of two underpasses river

 The bank protection the right of crossings gabionade

Pumping, removal and transportation of liquid sludge from small sewage treatment plants of the IBW

Intercommunale du Brabant wallon (Nivelles) | Published April 12, 2016  -  Deadline June 9, 2016
cpvs
90513900

This contract is designed to ensure the pumping, removal and transportation of 13,760 m3 / year (27,520 m3 / 2years) slurries (dryness of less than 5% solids) (estimated quantities).

This is sludge from small decentralized stations should be sent to larger centers can dehydrate.

The requirement is for a period of 1 year renewable 1 x 1 year.

Included in the company:

• Pumping of sludge thickeners, storage silos or basin in transport tanks.

• The sludge transportation to the receiving sites.

• The time required for opening and closing the gates of the sites (same building).

• The drafting of waybills. Provision of administrative and technical documents enabling the contracting authority to ensure the traceability of sludge.

• The cleaning of roads, technical room where mud flows could take place.

• Development of the weekly planning, coordination meetings, safety ...

• Associated costs: all costs of whatever nature, to its successful end service including the costs of connections required to ensure compatibility of pipes, cleaning tanks used for purposes other than transport sludge.

The IBW is certified EMAS ISO14001.

As such, we demand that any supplier, contractor, or agent meets environmental policy implementation on all sites of the IBW.

Before filing the offer, bidders are expected to have:

• considered the infrastructure (path and roads), and

• making the necessary scrutineering.

An optional site visit is possible (see III.1.2 item "Site visits").

Sludge disposal services

Intercommunale du Brabant wallon (Nivelles) | Published January 26, 2016  -  Deadline March 10, 2016
cpvs
90513900

This contract is to ensure pumping, removal and transport of 13 760 m 3 / year (27 520 m 3 / 2 years) of slurry (dryness of less than 5% solids) (the estimated quantities).

This is sludge from small decentralized stations that must be sent to larger centers can dehydrate.

The requirement is for a period of 1 year renewable 1 x 1 year.

Included in the company:

- Pumping sludge thickeners, storage silos or basin in transport tanks,

- Transport of sludge to receiving sites,

- The time required for opening and closing of site barriers (ditto buildings)

- Drafting transport slips. provision of administrative and technical documents enabling the contracting authority to ensure the traceability of sludge,

- Cleaning of roads, utility room where sludge flows could take place,

- Developing the weekly schedule, coordination meetings, safety ...

- The associated costs: all costs of whatever nature, to finalize the service, including the costs of connections necessary to ensure the compatibility of pipes, cleaning tanks used for purposes other than transport sludge.

The IBW is certified ISO 14001-EMAS.

As such, we demand that any supplier, subcontractor, or agent complies with the environmental policy implementation on all sites of the BWIs.

Before filing the offer, bidders are expected to have:

- Considered the infrastructure (path and roads), and

- Making the necessary scrutineering.

An optional site visit is possible (see point III.1.2 "Site visits").

Pumping, removal and transport of liquid sludge from small sewage treatment plants of the BWIs

Intercommunale du Brabant wallon (Nivelles) | Published January 21, 2016  -  Deadline March 10, 2016
cpvs
90513900

This contract is to ensure pumping, removal and transport of 13 760 m3 / year (27,520 m3 / 2years) slurries (dryness of less than 5% solids) (estimated quantities).

This is sludge from small decentralized stations that must be sent to larger centers can dehydrate.

The requirement is for a period of 1 year renewable 1 x 1 year.

Included in the company:

• The pumping sludge thickeners, storage silos or basin in transport tanks.

• The transportation of sludge to the receiving sites.

• The time required for the opening and closing of site barriers (ditto buildings).

• The drafting of transmission slips. Provision of administrative and technical documents enabling the contracting authority to ensure the traceability of sludge.

• The cleaning of roads, utility room where sludge flows could occur.

• Development of the weekly planning, coordination meetings, safety ...

• Associated costs: all costs of whatever nature, to its successful end service including the costs of connections necessary to ensure the compatibility of pipes, cleaning tanks used for purposes other than transport sludge.

The IBW is certified ISO 14001-EMAS.

As such, we demand that any supplier, subcontractor, or agent complies with the environmental policy implementation on all sites of the BWIs.

Before filing the offer, bidders are expected to have:

• considered the infrastructure (path and roads), and

• made the necessary technical checks.

An optional site visit is possible (see III.1.2 spot "visit sites").

repairs to 8 runways of reinforced concrete sewage plants by placing a metal cap

Intercommunale du Brabant wallon (Nivelles) | Published August 23, 2016  -  Deadline October 5, 2016
cpvs
45235310, 45454100

The work to be performed are located in 6 different treatment plants:

1. Wastewater treatment plant of Ways (Genappe)

2. Treatment plant Bruyère (Beauvechain) (2x)

3. Treatment plant Perwez

4. Treatment plant in Nivelles (2x)

5. Sewage treatment plant Rebecq

6. Sewage treatment plant Quenast (Rebecq)

The market consists of rehabilitation of the 8 raceways of articles of concrete sewage treatment plants by placing a metal cap.

It includes in particular:

- All works, services, supplies and constraints necessary for the repair of 6 raceways of articles of concrete sewage treatment plants by placing a metal cap including cleaning sails heads, preparation and repair local concrete, supply and installation of roofing sheets including fasteners making protective cover office, injecting a micromortier, production of intermediate joints

- All works, supplies, fees not included in the CSC or the annexes (extracts plans, photos, etc.), but derived directly or indirectly from those described in the SCC and its annexes, such as miscellaneous costs, measures of signaling and safety, rehabilitation, etc.

Note: prior to contract award, the tenderer must provide the contracting authority and within the time that it will set, all additional information concerning the provisions it has adopted for this way to have a perfect understanding offer filed.

Warning: the descriptions of the above work times are indicative and not exhaustive. The bidder will refer to the technical clauses of this CSC to obtain a list and a detailed and complete description of the work as part of this business.

  • 1