Call +44 800 9755 164

Public tenders for gas-container

Find all Chemical tenders in the world.
Finding business opportunities has never been easier.

Results for chemical. Make a new search!
Chemicalgas container

Heating plant construction work

Oy Turku Energia – Åbo Energi Ab | Published January 13, 2017  -  Deadline January 27, 2017

Urkakka concerns Artukainen steam Centre for excavation and foundation work, as well as auxiliary facilities of concrete construction and finishing.

The contract includes (attached to the base station and drawings):

- Plot of land and the yard area of ​​the construction works, the plot covers an area of ​​about 3 444 m²,

- The boiler and the chimney of the building foundation work, the plinth height of 1.2 m, the base covers an area of ​​about 448 m²,

- Boiler auxiliary facilities of the building of concrete construction, two floors, ground floor area of ​​approximately 133 m²,

- Fuel reception of the building foundation work, the plinth height of 3 m, the base covers an area of ​​about 660 m²,

- Reception in buildings Fuel auxiliary facilities of concrete, construction, floor 1, the base covers an area of ​​about 81 m²,

- The foundations of the gas container, ash silo and scale.

Work performance includes buildings and equipment required by the Non-regional foundation excavation and filling works, drainage and frost insulators, piling, buildings, equipment and chimney required, base floor slab casting, machine foundations, plinth elements. The contract includes the inner regions of plumbing, earthing, waste and rainwater drainage, sludge and basic water wells and foreign. The boiler foundations of the building are loaded 6/2/2017, 4/8/2017 fuel reception. Plinth installation elements, auxiliary facilities buildings and the like. After the work is done on these.

Steam Centre excavation and foundation work

Oy Turku Energia - Åbo Energi Ab | Published January 12, 2017  -  Deadline January 27, 2017
The supplier must be working for the security and the security of the warranty period. The main terms of the contract documents. The contract includes (attached station and floor plans): - plot of land and the yard area of ​​the construction works, the plot covers an area of ​​about 3444 m2, - the boiler building and the chimney foundation work, the plinth height of 1.2 m, the base covers an area of ​​about 448 m2 - boiler building auxiliary facilities of concrete, construction, 2 floors, the ground floor area of ​​approximately 133 m2 - Fuel reception of the building foundation work, the plinth height of 3 m, the base covers an area of ​​about 660 m2, - reception in buildings Fuel auxiliary facilities of concrete construction, 1 floor, floor area of ​​about 81 m2, - the gas container, ash silo and VAA ' an foundations. Work performance includes buildings and equipment required by the Non-regional foundation excavation and filling works, drainage and frost insulators, piling, buildings, equipment and chimney required, base floor slab casting, machine foundations, plinth elements. The contract includes the inner regions of plumbing, earthing, waste and rainwater drainage, sludge and basic water wells and foreign. The boiler foundations of the building are loaded 6/2/2017, 4/8/2017 fuel reception. Plinth installation elements, auxiliary facilities buildings and the like. After the work is done on these. Urkakka concerns Artukainen steam Centre for excavation and foundation work, as well as auxiliary facilities of concrete construction and finishing. List of selection criteria and their short-list of selection criteria and their short-list and brief supplier must be working for the security and the security of the warranty period. The main terms of the contract documents.
  • 1