Public tenders for chemical in Senftenberg Germany

Find all Chemical tenders in the world.
Finding business opportunities has never been easier.

Results for chemical. Make a new search!
ChemicalGermanysenftenberg

Equipment of a chemical specialist Cabinet with preparation room

Stadt Senftenberg, Zentrale Vergabestelle | Published April 4, 2017  -  Deadline April 19, 2017
cpvs
39000000, 39180000, 39181000, 39160000, 45421153

Furnishing classroom: 3 cabinets 2 satchel shelves, 5 subjects with 2 coat rails 1 satchel shelf 20 trays 1 teacher's table 1 approach table, mobile 15 students experiment tables 10 medium columns detached 30 skids chairs 2 chairs padded, 1 double slide panel, pylon guide Periodic Table of Elements first-aid equipment Interiors preparatory: 1 chemical wall unit 1 chemical cabinet with poison tray 1 acid liquor cabinet 1 safety cabinet 1 cabinet various top cupboards with conductor rail casing 1 work table 1 deduction space constantly approach 2 tables 1 mobile laboratory experiment table

Maintenance Chemical storage cabinets

BTU Cottbus - Senftenberg | Published February 21, 2017  -  Deadline March 7, 2017
cpvs
50700000

Maintenance Chemical storage cabinets

BTU Cottbus - Senftenberg | Published February 21, 2017  -  Deadline March 7, 2017
cpvs
50700000

tighten screws - Run the guide rollers - a function of the door closing - function of the lever / knob handles - Door latch and door latch, possibly oil / fat - joints insulation damage and seat - function of fire protection disc valves, clean if necessary

Equipment of a chemical specialist Cabinet with preparation room

Stadt Senftenberg, Zentrale Vergabestelle | Published April 4, 2017  -  Deadline April 19, 2017
cpvs
39180000, 45421153, 39000000, 39181000, 39160000

Water-treatment work

WAL Wasserverband Lausitz | Published November 22, 2016  -  Deadline December 21, 2016
cpvs
45232430, 45213250, 45223100, 45260000, 45223500, 45231300, 45233226, 45310000, 32581000, 45300000

Steel and pipeline construction; Test statics steel construction; Specifications; commissioning; Trial operation; Optimization of the entire system; Inventory documentation; Training operators.

- Site equipment for assembly of the supporting structure and the building envelope from the outside (no stand space in the hall);

- Building envelope as steel lightweight design, external dimensions (LxWxH) 48,50 x 20,50 x of 10.50 m (eaves above ground level) directly attached to the existing waterworks;

6.00 m and additional gable frame including all the necessary longitudinal and cross webbing in the material S 235 and S 355 with factory certificate to Euro standard DIN EN 10025.

- Execution class EXC 2 (crane runway EXC 3) according to DIN EN 1090-2;

- Steel construction hot-dip galvanized with additional duplex coating;

9.50 m at the eaves;

- Gable roof with roof pitch of 5%;

1050 m 2 visibly bolted to the aluminum-PUR-aluminum composite panels to separate purlin, trapezoidal profiled top;

1200 m 2 visibly bolted to the aluminum-PUR-aluminum sandwich panels made of aluminum to separate bolt construction;

- Buildings with all necessary clothing latch and Pfettenkonstruktionen, connection, gable, eaves and transition sheets and all necessary fastening and fasteners, insulation and waterproof formation of shocks and rainwater drainage via gutters and downpipes;

- Kerndämmstärke of the sandwich panels (roof and wall)> 80 mm;

18,90 m, load 2500 kg and attached to steel props design;

1.20 x 2.20 aluminum;

- Facade scaffolding and other scaffolding for mounting;

- Development workshop and assembly drawings including certified structural calculations..

Floors, 4 pools for water treatment, 6 filter basins and 2 underlying storage containers made of reinforced concrete as a water-impermeable construction within the meaning of the WU guideline of the German Committee for Reinforced Concrete (DAfStb) with built-in parts, openings and pipe penetrations;

- Reinforced concrete component thicknesses 22 to 50 cm;

- External dimensions basement floor plan established 20.2 x 48.5 m in used containers, clear height 2.50 m (3.70 m terminal area Istwerk);

- Beck sizes (internal dimensions LxWxH): 2 reaction pool 7,35 x 5,80 x 7,75 m; 2 sedimentation 11,20 x 5,80 x 7,75 m; 6 Remove pool 11,40 x 3,35 x 5,80 m; 1 Erstfiltratbehälter 11,45 x 11,40 x 2,50 m; 1 Filterspülabwasserbehälter 10,00 x 11,40 x 2,50 m; 1 overflow threshold 22.2 x 1.00 x 3.40 m;

At 1 900 meters 3 Reinforced concrete;

- All construction joints, penetrations and mounting parts waterproof formed;

2 540 m 2 ;

180 m 2 ;

190 m 3 ;

860 m 2 ;

- Reinforced concrete frame construction for Entsäuerungskolonnen;

- Supply and distribution shaft;

- Buried pipes;

- Transportation Infrastructures and outdoor facilities.

Remove piping with valves and measurement of nominal diameter up to DN 500 made of steel with polyamide plastic coating and stainless steel, development workshop and assembly drawings, carrying 10-week trial operation for observing the limits of water quality to drinking water regulation and optimization of settings, training of the operator.

Note: The reinforced concrete work for the production of tanks and filters are part of Los. 2

18 switch and control cabinets, spot control panels and switches, instrumentation (pressure levels, flow, physico-chemical water quality), lighting and outlet facilities (indoor and outdoor), installation and laying systems, fire and burglar alarm systems with certification, raised floor system , UPS systems, fiber-optic network, ventilation system, decentralized peripherals with ET200SP, grounding system, lightning protection, surge protection, potential equalization, cables, assembly and workshop planning with SCM and and cabinet design plans, drafting specifications.

Part 1: Migration Istwerk.

System integration into existing control systems PCS7, Umschluss during operation

100 bus users via ProfiNet, redundantly designed control system PCS7 with 2 servers, 2 jobs, waiting means.

Drywall, raised floor, ceiling grid, lighting, dismantling mosaic, waiting furniture.

Drafting specifications for Part. 1 to 3

  • 1