Call +44 800 9755 164

Public tenders for chemical in Karlsruhe Germany

Find all Chemical tenders in the world.
Finding business opportunities has never been easier.

Results for chemical. Make a new search!

KIT Campus South, rehabilitation Chemical Institute, Bldg 30.43, shutters work DIN 18358th

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published October 9, 2014  -  Deadline December 2, 2014
cpvs
45421143

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, rehabilitation Chemical Institute, Bldg 30.43, shutters work DIN 18358th

Metalworking

Land Baden-Württemberg, vertreten durch Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published December 16, 2015
Winner
WEAG GmbH
cpvs
45262670

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, metalworking.

Structural shell work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published July 30, 2015
Winner
C. Dupré Bau GmbH
cpvs
45223220

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, structural work.

Structural shell work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published May 2, 2015  -  Deadline June 16, 2015
cpvs
45223220

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, structural work.

Metalworking

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published October 29, 2015
Winner
Klaus Maas Stahl-Metallbau GmbH
cpvs
45262670

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, Metallbauarbeiten DIN 18360th

Scaffolding work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published August 6, 2015
Winner
Becker Paul GmbH
cpvs
45262100

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, scaffolding work DIN 18451st

Concrete work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published August 15, 2015
Winner
Martin Franz und Sohn GmbH
cpvs
45262300

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, concrete maintenance work DIN 18349th

Metalworking

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published August 5, 2015  -  Deadline September 22, 2015
cpvs
45262670

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, Metallbauarbeiten DIN 18360th

Installation work of blinds

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published February 5, 2015
Winner
Sitzmann Rolladen- und Sonnenschutzsysteme
cpvs
45421143

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, Building 30.43, shutters work DIN 18358th

Scaffolding work

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published May 13, 2015  -  Deadline June 30, 2015
cpvs
45262100

76131 Karlsruhe, Fritz-Haber-Weg 4, KIT Campus South, renovation Chemical Institute, building 30.43, scaffolding work DIN 18451st

Analysis services

Landesanstalt für Umwelt, Messungen und Naturschutz Baden-Württemberg (LUBW) | Published March 18, 2017  -  Deadline April 25, 2017
cpvs
71620000

Sampling and analyzes in the groundwater measuring network of Baden-Württemberg in the period 09.01.2017 to 31.08.2019.

A sampling year respectively covers the period 01:09. to 31.08. the following year. The fact ordered service includes:

a) sampling and chemical analyzes water to 2 000 measuring points in the fall. In the fall of 2018 EUR 3 000).

b) sampling and chemical analyzes water to approximately 1 000 measuring points in the following spring.

c) sampling and water chemical analysis in additional smaller sampling campaigns in sampling year.

d) Participation in comparative analyzes with natural and / or synthetic samples.

e) processing of process documents as part of the sampling.

f) Creation of protocols for sampling.

g) preparation of photo documentation for sampling.

h) Digital delivery of measurement data in predefined formats.

It is envisaged that each sampling year part jobs to around 30 - 35 to give the company.

The lift equipment

Vermögen und Bau Baden-Württemberg Amt Karlsruhe | Published March 19, 2015  -  Deadline February 15, 2016
cpvs
45313

KIT Campus South, renovation Chemical Institute, Bldg 30.43 Type of service: elevators DIN 18385 scope of services includes: 2 lifts, load capacity 600/1125 kg, 10 stops, v = 2.5 m / s.

Scaffolding work

Vermögen und Bau Baden-Württemberg Amt Karlsruhe | Published February 5, 2015  -  Deadline July 31, 2015
cpvs
45262

Former Stadtkommandantur Type of service: Gerüstarbetien DIN 18451 Scope of services: 1,100 m² protection and scaffolding, 8 p broom stands (dormers), 50 m hoarding, 50 m² protection flooring, chemical toilet tenderers and their descendants and rental business owners have with their bids, the relevant commitments under § 5 LTMG, accessible at "www.rp- stuttgart.de/servlet/PB/menu/1359260/index.html" to submit.

Architectural, engineering and planning services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published April 13, 2016  -  Deadline May 9, 2016
cpvs
71240000

Interdisciplinary VOF procedure for the award of architectural services for buildings u. Services for Laboratory planning for the establishment of a laboratory and new office building as an extension of an existing building and its conversion to accommodate the State Institute for Environment, Measurements and Nature Conservation Baden-Württemberg (LUBW). It is expected with lighthouse and a role model in terms energetischer- and sustainability project. For the extension to a certification according to the rating system Sustainable Building (BNB) is aimed at the federal government for laboratory buildings.

The program of the new building consists of both areas with pure office use as well as from areas with laboratory nearby offices and laboratories (radio-chemical with control panel according StrahlenschutzVO, certainly areas to BiostoffVO (S1, S2) and GenTSV (S1, S2), metrology and analysis - mainly chemical-physical, equipment and product safety, operation of monitoring networks and technical OSH / noise).

The construction site is located in the immediate vicinity of the existing building large Oberfeld 3 in Karlsruhe, which was completed in the year 2000th It is intended in a first phase the extension with about 7 800 m 2 NF create 1-6. This includes an office area with about 3 200 m 2 NF1-6 and a laboratory area with about 4 600 meters 2 (Of which about 3 300 meters 2 NF 3-4). The conversion of the existing building (dismantling laboratories, fitted central usages such. B. location centers, meeting rooms, canteen) is planned as a 2nd phase afterwards. To measure total building costs are of 49.1 million EUR provided (1 BA 46,700,000 EUR / 2 BA 2.4 million EUR GBK).

Of the selected candidates are gem solutions for the planning task in the 2nd stage of the process. §20 para. 3 VOF be worked out in the form of proposals which are decisive for the selection of the contractor with.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published October 3, 2015
Winner
Meier
cpvs
71300000

76131 Karlsruhe, Engesserstraße 15, KIT Campus South, rehabilitation of the Chemical Institutes, 7 BA, building 30.45, engineering services according to Part 4, Section 2 HOAI. The building was built in 1976 as 30.45 Institute building for Inorganic Chemistry of the KIT Campus South. The building has been restored in parts, the date to be given order includes a building renovation with the aim of building and fire safety according to toughen the current requirements. The building has a complete technology basement, a basement with laboratories and chemicals output, the ground floor with lobby, cafeteria and library area, and 6 upper floors with laboratory and seminar use. In recessed attic there are the central exhaust. The building subject to building regulations the skyscraper guidelines. The financial framework for redevelopment area includes as a priority the ground floor with the Departmental Library, the levels 1 and 2 with laboratory and seminar areas, sections of the levels 3-5 and Chemiekalienausgabe in UG. In parts of the central air-conditioning systems are to renovate. Use specific equipment to be completely replaced on the 1st floor and the 2nd floor. In addition, the 1st basement are a chemicals output and an acid storage and chemical storage to renew completely. The renovation also includes the energy retrofit of the facade on the ground floor. The entire building must be upgraded fire protection. A fire protection report is in preparation. The entire building has a net floor area of ​​approximately 19 500 m2. For the partial renovation of the building 30.45 total construction costs amounting to 25 000 000 EUR gross and prorated total construction costs amounting to 3 EUR 200 000 was estimated gross for the use of specific equipment. The predetermined by the client Berwerberformblatt is necessarily included in the application (see II.2.1)).

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published July 4, 2015  -  Deadline August 3, 2015
cpvs
71300000

76131 Karlsruhe, Engesserstraße 15, KIT Campus South, rehabilitation of the Chemical Institutes, 7 BA, building 30.45, engineering services under Part 4 Section 2 HOAI The building was built in 1976 as 30.45 Institute building for Inorganic Chemistry of the KIT Campus South. The building has been restored in parts, the date to be given order comprises a building renovation with the aim of building and fire safety according to toughen the current requirements. The building has a complete technology basement, a basement with laboratories and chemicals output, the ground floor with lobby, cafeteria and library area, and 6 upper floors with laboratory and seminar experience. In recessed attic there are the central exhaust. The building subject to building regulations the skyscraper guidelines. The financial framework for redevelopment area includes a focus on the ground floor with the Departmental Library, the levels 1 and 2 with laboratory and seminar areas, parts of the levels 3-5 and Chemiekalienausgabe in UG. In parts of the central air-conditioning systems must be remedied. Use specific equipment to be completely replaced on the 1st floor and the 2nd floor. Also in 1.UG are a chemicals output and an acid storage and chemical storage to renew completely. The renovation also includes the energy retrofit of the facade on the ground floor. The entire building must be upgraded fire protection. A fire safety report is in preparation. The entire building has a net floor area of ​​around 19.500m2. For the partial renovation of the building 30.45 total construction costs amounting to EUR 25 million gross, and prorated total construction costs amounting to EUR 3.2 million were estimated gross for using specific equipment. The default by the client Berwerberformblatt is mandatory included in the application (see II.2.1).

Ships and boats

Bundesrepublik Deutschland, vertreten durch das Bundesministerium für Verkehr und digitale Infrastruktur, dieses wiederum vertreten durch die Bundesanstalt für Wasserbau (BAW) | Published January 27, 2016  -  Deadline March 31, 2016
cpvs
34500000, 34513600

The Bundesanstalt für Wasserbau (BAW) has been commissioned by the Federal Waterways and Shipping Administration of the Federal through this grant award procedure. Subject of the proceedings is the preliminary design, construction and turnkey supply of two multi-purpose vessels (pollutant accident-recovery vessels) for water and navigation administration of the federation.

Necessary key data are according to the current state:

- Overall length: max. 85 m,

- Overall width: 18.6 m least likely,

- Draft: 5.00 m (tonnes Place) and 5.80 m (shipwreck use)

- Diesel-electric drive concept,

- Classified ship for use in particular as an oil collecting and chemical spill recovery vessel,

- Optimized characteristics in terms of waves and maneuvering,

- Test drive speed 15.0 knots,

- Compliance with the relevant IMO requirements, in particular MARPOL, including Annex VI Tier III, as well as compliance with the relevant EU directives and EU regulations, in particular 2005/33 / EC

- Designed ship for sailing area A 3, the primary application area North Sea.

The client reserves the right to further subject of the contract under the negotiated procedure and, if necessary, deviate from the above information.

Office furniture

KIT – Karlsruher Institut für Technologie – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft – Campus Süd | Published December 24, 2015
Winner
Hief + Heinzmann KG
cpvs
39130000

For the refurbished buildings 30.43, chemical tower 1 the initial to be executed. Here, the loose furniture is taken into account in 10 floors for offices, conference rooms, break rooms and laboratories. The subscription is scheduled for January 2016th The total initial of the building is divided into 5 lots. Consortia are not admitted. Lot 1 office furniture with worktables, roll containers, hinged doors, shelves and sideboards worktables about 98 St., 1600/800, 1800 / 800.1200 / 600, 1800/600 and angle combinations height adjustable, four-foot frame, modular, linkable, tabletop melamine white Meeting tables about 8 St. height-adjustable, one-leg frame, round Rollcontainer about 61 St., 400/800, body and fronts white, 3 drawers with lock, handles hinged doors about 42 St. modular cabinet system from single cabinets to cabinet construction, 2 OH to 6 OH, cabinet widths 800-1200 mm, cabinet depths 350-450 mm, shelves of sheet steel, with lock, white melamine shelves ca. 103 St. embodiment as hinged doors furniture from the same manufacturer and from a design line. Lot 2 Seminar furnished with tables and chairs tables ca. 225 St., as Einsäulenklapptisch for linking with connecting leaves, 650/450, 1300/450, 1200/600 and 1400/700 chairs ca. 518 St. seat wooden, four-leg frame circular steel pipe chrome finish, stackable Lot 3 Office swivel chair office swivel chair about 104 St. with and without headrest, partially with mesh back Lot 4 Laboratory Chairs Laboratory chairs ca. 205 St., S1 and S2 suited, height adjustable, rollable laboratory stool 280 St., S1 and S2 suited, height adjustable, partially rollable Los 5 cabinet system corridors cabinets approximately 212 St., endless wardrobe system, 5OH with top of about 550 mm, as a cabinet element with shelves and a locker member cabinet widths 600, 1200 mm, cabinet depth 600 cm, sheet labels and doorstops.

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Karlsruhe | Published September 16, 2015
Winner
Ernst² Architekten AG
cpvs
71221000

76131 Karlsruhe, Engesserstraße 15, KIT Campus South, rehabilitation of the Chemical Institutes, 7 BA, building 30.45, architectural services under Part 3 section 1 HOAI 3045 The building was built in 1976 as a building for the Institute of Inorganic Chemistry of the KIT Campus South. The building has been restored in parts, the date to be given order includes a building renovation with the aim of building and fire safety according to toughen the current requirements. The building has a complete technology basement, a basement with laboratories and chemicals output, the ground floor with lobby, cafeteria and library area, and 6 upper floors with laboratory and seminar use. In recessed attic there are the air conditioning systems. The building subject to building regulations the Hochhausrichtlineien. The financial framework for redevelopment area includes as a priority the ground floor with the Departmental Library, the levels 1 and 2 with laboratory and seminar areas, sections of the levels 3-5 and Chemiekalienausgabe in UG. The extent to which air conditioning systems need to be rehabilitated is currently being investigated. If necessary, parts of ventilation systems are at a later date, as part of a further building phase, renewed. The renovation also includes the energy retrofit of the facade on the ground floor. The entire building must be upgraded fire protection. A fire protection report is in preparation. The entire building has a net floor area of ​​approximately 19 500 m2. For the partial renovation of the building 3045 total construction costs amounting to 25 000 000 EUR were estimated gross. Note: Tenderers and their demand and rental business owners have with tender to deliver the relevant commitments in accordance with § 5 LTMG, available at "https://rp.baden-wuerttemberg.de/Themen/Wirtschaft/Tariftreue/Seiten/Mustererklaerungen.aspx". Additional documents will not be made available.

Office furniture

KIT – Karlsruher Institut für Technologie – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft – Campus Süd | Published July 29, 2015  -  Deadline August 31, 2015
cpvs
39130000, 39132100

For the refurbished buildings 30.43, chemical tower 1 the initial to be executed. Here, the loose furniture is taken into account in 10 floors for offices, conference rooms, break rooms and laboratories. The cover is provided for January 2016. The total initial of the building is divided into 5 lots. Consortia are not admitted. Lot 1 office furniture with worktables, roll containers, hinged doors, shelves and sideboards worktables about 98 St., 1600/800, 1800 / 800.1200 / 600, 1800/600 and angle combinations height adjustable, four-foot frame, modular, linkable, tabletop melamine white Meeting tables about 8 St. height-adjustable, one-leg frame, round Rollcontainer about 61 St., 400/800, body and fronts white, 3 drawers with lock, handles hinged doors about 42 St. modular cabinet system from single cabinets to cabinet construction, 2 OH to 6 OH, cabinet widths 800-1200 mm, cabinet depths 350-450 mm, shelves of sheet steel, with lock, white melamine shelves ca. 103 St. embodiment as hinged doors furniture from the same manufacturer and from a design line. Lot 2 Seminar furnished with tables and chairs tables ca. 225 St., as Einsäulenklapptisch for linking with connecting leaves, 650/450, 1300/450, 1200/600 and 1400/700 chairs ca. 518 St. seat wooden, four-leg frame circular steel pipe chrome finish, stackable Lot 3 Office swivel chair office swivel chair about 104 St. with and without headrest, partially with mesh back Lot 4 Laboratory Chairs Laboratory chairs ca. 205 St., S1 and S2 suited, height adjustable, rollable laboratory stool 280 St., S1 and S2 suitable height adjustable, partially rollable Los 5 cabinet system corridors cabinets approximately 212 St., endless wardrobe system, 5OH with top of about 550 mm, as a cabinet element with shelves and a locker member cabinet widths 600, 1200 mm, cabinet depth 600 cm, sheet labels and doorstops.