Call +44 800 9755 164

Public tenders for chemical in Bonn Germany

Find all Chemical tenders in the world.
Finding business opportunities has never been easier.

Results for chemical. Make a new search!

Chemical toilets

Beschaffungsamt des BMI | Published July 16, 2016
cpvs
24955000

Dry toilets

Chemical toilets

Beschaffungsamt des BMI | Published April 5, 2016  -  Deadline May 25, 2016
cpvs
24955000

Framework agreement on 7 positions outdoor toilets.

Mobile analytics.

Beschaffungsamt des BMI | Published October 9, 2014  -  Deadline December 5, 2014
cpvs
38546000

Mobile technology for identification of explosive and chemical substances for which defusing services of the Federal Police.

Chemicals in small containers

Land NRW | Published September 29, 2015  -  Deadline November 23, 2015
cpvs

Chemikalien in Kleingebinden

Detection and analysis apparatus

Beschaffungsamt des BMI | Published September 19, 2015
Winner
Analyticon Instruments GmbH
cpvs
38430000

Uses 3 Raman spectrometer for the purpose of identification of unknown substances or mixtures for field use in Jordan: A portable Raman spectrometers for field measurement use moderate. In addition, another Raman spectrometer and an operator training on site in Jordan are advertised as an option. The retrieval of the options will take place depending on requirements and budgetary constraints. A commitment on the part of the client to retrieve the options fully or partially, does not exist. The portable Raman spectrometers are especially to be used if (z. B. major accident in the chemical industry) or in the use of chemical warfare agents, a first assessment of the situation must be carried out at a release of hazardous industrial chemicals. The device must therefore be able to recognize a large number of industrial chemicals. In addition, chemical weapons must be recognized. The equipment must be delivered no later than 10.14.2015 (exclusion criterion).

Hygiene Technical Investigations

Kunst- und Ausstellungshalle der Bundesrepublik Deutschland mbH | Published September 12, 2016  -  Deadline October 10, 2016
cpvs
90920000

Such invitations to tender in accordance with the terms of reference, the awarding of contracts for "carrying out chemical and bacteriological tests in drinking water supply, as well as water-bearing systems in the air conditioning systems (RTL)" in the Art and Exhibition Hall for four years.

New DZNE on the Venusberg - painting and decorating.

Deutsches Zentrum für Neurodegenerative Erkrankungen e. V. | Published October 11, 2014
Winner
R + S Raum und Schrift09126Chemnitz Claustraße 16 info@raum-schrift.de +49 371523700 www.raum-schrift.de+49 3715237050
cpvs
45000000, 45450000

Approximately 19,800 m² of wall coating, Circa 10,750 m² ceiling coating, Circa 3900 m² floor coating - epoxy, Circa 650 m² Floor Coating - oil resistant paint, Circa 1800 m² floor / ceiling / wall coating - chemical-resistant paint, Spread over 3 buildings with deferred execution dates.

Federal City: SZB-222254: supply of cleaning chemicals, disinfectants, dishwasher detergent, cleaning supplies, hygiene paper, etc. to the senior centers of Bonn

Bundesstadt Bonn, Referat Vergabedienste | Published February 25, 2016  -  Deadline March 23, 2016
cpvs

Federal City: SZB-222254: supply of cleaning chemicals, disinfectants, dishwasher detergent, cleaning supplies, hygiene paper, etc. to the senior centers of Bonn

Research and development services and related consultancy services

Bundesministerium für Wirtschaft und Energie (BMWi), Referat I C 4 | Published July 23, 2016
Winner
Ökopol GmbH
cpvs
73000000

The REACH Regulation is the cornerstone of the EU chemicals policy. Their goal is a high level of protection for human health and the environment, to strengthen competitiveness and innovation, the free circulation of substances on the internal market and the promotion of alternative assessment methods. The registration process for some 30 000 chemical substances by manufacturers and importers is gradual from 2007 to 2018. In parallel, based on the data submitted, the identification of particularly hazardous substances, which can then be subjected to regulation. For regulatory purposes the prohibition or restriction with approval subject to certain uses of hazardous substances are mainly available. Although both limitation and authorization procedure under REACH basically work, but there are numerous criticisms of many traders, especially SMEs and downstream users, with respect to the high costs, particularly related to the regulatory process and the complex procedure. In addition, the lack of predictability and planning security are challenged. The EU Commission has adopted a roadmap in 2020 to achieve better predictability, simplification of processes and a higher efficiency / effectiveness. The aim is a basis for deciding to be created when the authorization is to be trodden as the "right way". (For more see section VI Nr. 3 "Other information").

Research and development services and related consultancy services

Bundesministerium für Wirtschaft und Energie (BMWi), Referat I C 4 | Published April 13, 2016  -  Deadline April 26, 2016
cpvs
73000000

The REACH Regulation is the cornerstone of the EU chemicals policy. Their goal is a high level of protection for human health and the environment, to strengthen competitiveness and innovation, the free circulation of substances on the internal market and the promotion of alternative assessment methods. The registration process for some 30 000 chemical substances by manufacturers and importers is gradual from 2007 to 2018. In parallel, based on the data submitted, the identification of particularly hazardous substances, which can then be subjected to regulation. For regulatory purposes the prohibition or restriction with approval subject to certain uses of hazardous substances are mainly available. Although both limitation and authorization procedure under REACH basically work, but there are numerous criticisms of many traders, especially SMEs and downstream users, with respect to the high costs, particularly related to the regulatory process and the complex procedure. In addition, the lack of predictability and planning security are challenged. The EU Commission has adopted a roadmap in 2020 to achieve better predictability, simplification of processes and a higher efficiency / effectiveness. The aim is a basis for deciding to be created when the authorization is to be trodden as the "right way".

(For more see section VI Nr. 3 "Other information").

City of Bonn, SZB 247581, supply of cleaning chemicals, disinfectants, dishwasher detergent, cleaning supplies, hygiene papers etc. to the senior centers of Bonn in 5 lots

Bundesstadt Bonn, Referat Vergabedienste | Published April 7, 2017  -  Deadline May 4, 2017
cpvs
24455000, 39830000, 39224000, 39831210

Cargo handling and storage services

HIL Heeresinstandsetzungslogistik GmbH | Published September 19, 2015
Winner
ESG Elektroniksystem-und Logistik-GmbH
cpvs
63100000, 35400000, 60100000

The HIL GmbH is responsible as defense technology companies with the industrial repair of military major equipment. The HIL GmbH intends to outsource the provision and operation of a logistics hub for military equipment to an external service. The process begins for the contractor to work everyday takeover of the assemblies, the operator of ZEBEL (Central Bundeswehr spare parts logistics) in Kaufungen and redelivery to this. What is required: - a working-day stock and movement information to the AG; - The establishment and operation of IT interfaces for AG, and ZEBEL Bundeswehr; - The transport management with tracking and work daily feedback, for CHP / WaffGes-Paid material; - The establishment and operation of an Internet-based computer links to the transport application for remanufacturer and HIL premises; - Work daily reporting of chemicals and chemical products to the German Army; 2600 m²) and of equipment; - Rack storage, pallet and shelf spaces; - Bulk storage; - The range of goods receipt and goods issue; - Free storage space; - CHP / weapons caches; - Bearing certainly shed (Merchandise SichhK Bw); - The establishment of a storage room for weapons or weapon parts with separate access control; - The collection of serial numbers and continuous logging each operation; - Safe handling of the logistics process of the Bundeswehr (VWH1, VWH 150 VWH153 and VWH156); - The establishment of a separate incoming goods inspection; - The batch size collection by default AG; - Certification according to DIN / EN ISO 9001 2008; - The provision of industrial trucks with a lifting capacity of up to 4 tonnes; VS-NFD met; - That the individuals involved in the case of transport in accordance with the conditions laid KrWaffKontrG about the qualifications and authorizations. the relevant provisions and regulations for the transport of KrWaffKontrG material features;

Industrial machinery

Deutsche Forschungsgemeinschaft e. V., Zentrale Beschaffungsstelle | Published May 2, 2015  -  Deadline May 28, 2015
cpvs
42000000

General requirements: - RIE ICP facility as a complete system, including all components needed for correct operation; - The plant is (x 1 cm2 substrate surface in the region 1) be be optimized and also for substrates up to 2 "diameter for small substrates; - The system must be usable as RIE (without ICP); An exchange between fluorine-containing and chlorine-containing gases must at all times be possible without replacing or changes of system components; - The homogeneity of the etching processes (homogeneity = ([max] - [min]) / (2 [medium]) - 100%) in an area with a diameter of 2 "must be at least ± 5% or better; - The equipment must be suitable for the use of metallic, semiconducting and insulating samples; - The working pressure must be adjusted at least in the range of 2-10-3 1-10-1 mbar to mbar; Vacuum system); Options), the other systems are not to be offered; - The system must be designed and suitable for use in a clean room. Vacuum system (process chamber) - Material: aluminum, made from a solid aluminum block, with at least one viewing window for process monitoring; - Connected via a VAT-valve with a lock chamber (vacuum lock); The diameter of the carrier wafer is to be 4 "; - Base pressure in the process chamber below 2 - 10-6 mbar; - To allow a user-side expansion of the system has the processing chamber side, at the height of the substrate, at least one additional flange having a size of at least DN63 and maximum DN100 have (the flange has at delivery be blanked off and required for any other purpose are ). About this flange, an alternative sample transfer in the chamber can be (not including transfer concept.) Must be possible; As a backing pump to a dry compressing or oil-sealed (Fomblin) backing pump can be used with a pumping speed of 25 m3 / h; - Including electric Kammern- and pump nozzle heater; - Measurement of the vacuum of the base pressure and the inlet pressure of the turbo-molecular pump; Pressure control over entire working pressure range in the process chamber; - Automatic VAT butterfly valve for regulating the pump power; - Vacuum chamber and conditioning electronics integrated compactly into a frame, any existing panels to be easily removable for maintenance purposes, backing pumps and gas cabinets can be located outside of the frame; Options). Including lock chamber vacuum measurement and inspection window; - Base pressure in the lock chamber after five minutes pump below 2 - 10-4 mbar; - Turbo molecular pump with a pumping speed of at least 65 l / s (N2) and a dry compressing backing pump with a Sauvermögen of at least 13 m3 / h. RIE substrate electrode - RIE substrate electrode having a diameter of at least 160 mm; The electrodes reach temperatures must also be possible as a continuous operation; The temperature control must be carried out on the system software; - Thermostat to control the temperature of the substrate electrode included; The helium pressure is to be specified as a parameter and measured and controlled by varying the flow; The starting positions of the capacity of the tuning unit must be additionally specified as process parameters. ICP source - ICP source in helischer (cylindrical) shape; - The ICP source must have a removable electrostatic shield; General requirements specified substrate sizes are sufficiently large, but at least be 65 mm; - The ICP source has to be like all the other components of the system for the use of inert, fluorine-containing and chlorine-containing process gases suitable; The starting positions of the capacity of the tuning unit must be additionally specified as process parameters; - RF power must be sufficient to achieve a plasma density of at least 11 ^ 5-10 1 / cm3 to achieve; - In the process, the specification of the bias voltage must be possible. Gas supply - flushable and sealable gas cabinet, designed for a total of at least 12 gas lines, of which at least 7 installed gas lines, gas lines need to be further upgraded gas lines electropolished and orbital welded; Input particle filter; - The individual gas lines should be interrupted by controlled valves and the gas flow controlled by calibrated MKS mass flow controller (MFC) (N2, O2, H2, CF4, CHF3, Ar, Cl2); - At least two installed gas lines must have a metal sealed MFC and a bypass (for corrosive or toxic gases) feature; - Gas distribution stainless steel VCR fittings in the gas cabinet. A plant control PC for system control with all necessary components are included; Sample transfer) and also allow manual control of the system; B. in csv format) ABG

Engineering design services for the construction of civil engineering works

Stadtwerke Bonn GmbH | Published April 12, 2017  -  Deadline May 10, 2017
cpvs
71322000, 71321000

Planning services for building services for a family, school and sports pool.

The construction decision is to be taken even in 2017 based on a business case for the construction and operation of the bath.

The project planning has been announced already in the course of a competition, followed by negotiation procedures; the achievements of structural design will be advertised separately.

no generation facilities must be planned in the pool for these media.

The building services includes:

System group 1 Wasser-Abwasser - water; Sewage sanitary-engineering of plants with branched network

- installations for purifying waste water

- Equipment for the chemical and physical treatment of water

Swimming pool water treatment consisting essentially of:

Investment group 2 heat supply - heating equipment for the pool water, sauna etc.

Integration into system groups 1 and 3

- house distribution station for distributing heat

Heat cool; heat recovery; Be, - and dehumidification, etc.

Exterior lighting.

Single battery;

- Central emergency lighting;

- lightning protection and grounding systems;

- lighting systems with special requirements.

Profibusausgang

Public address systems; Site supervision; Timing systems, POS systems; including access systems, remote control transmission networks.

Investment group 6 conveyor systems - systems to ensure a barrier-free access to the pool as required by law.

- Equipment for Verfahrung a mobile platform.

7.- investment group 7 process plants - Laundry and Cleaning Equipment

- Fire extinguishers;

- smoke removal systems as automatically operated plant;

- fire detection systems;

Water treatment;

- technical equipment for water treatment plant also see Group 1;

- technical equipment for sewage discharge;

- technical equipment for water pumping and storage;

- technical equipment for sludge treatment.

Medium size kitchens for catering including storage and cooling

Conditioning Group 8 building automation -Gebäudeautomationssysteme or automation systems with plant intergroup system integration.

  • 1