Public tenders for chemical in 99947-bad-langensalza Germany

Find all Chemical tenders in the world.
Finding business opportunities has never been easier.

Results for chemical. Make a new search!
ChemicalGermany99947-bad-langensalza

Procurement of laboratory consumables "Merck Chemicals" or equivalent

Thüringen: Thüringer Landesamt für Verbraucherschutz | Published September 4, 2017  -  Deadline October 11, 2017
cpvs
33000000

Afforestation in Forstamt Bad Doberan

Landesforst MV AöR | Published October 7, 2016  -  Deadline September 30, 2016
Winner
-
cpvs
entfällt

Afforestation of a meadow area of ​​10.05 ha (net area 8.00 ha) with TEI and EK and forest edges, Chemical preparations, in strips deep loosening with Tiefenmeißel and fence construction (ca 2850 running meters), culture fuse to 4 years (Kulturplege, fence entertainment and demolition)

Afforestation in Forstamt Bad Doberan

Landesforst MV AöR | Published September 23, 2016  -  Deadline September 30, 2016
Winner
-
cpvs
entfällt

Afforestation of a meadow area of ​​10.05 ha (net area 8.00 ha) with TEI and EK and forest edges, Chemical preparations, in strips deep loosening with Tiefenmeißel and fence construction (ca 2850 running meters), culture fuse to 4 years (Kulturplege, fence entertainment and demolition)

Sewage treatment services

Stadt Bad Homburg vor der Höhe – Der Magistrat, Fachbereich Recht – Vergabestelle | Published August 13, 2016  -  Deadline September 14, 2016
cpvs

For the wastewater treatment plant Bad Homburg / Ober-Eschbach, the supply of liquid precipitant for chemical phosphate elimination for the period of 2 years

Toxic substances rehabilitation services

Kreis Stormarn | Published November 4, 2017
Winner
BAUER Resources GmbH
cpvs
90743200

On the site Bunsenstraße 2 and the south adjacent property of the company Kahl in Trittau (see Appendices 1 and 2) has been proven by extensive investigations an underground pollution by volatile chlorinated hydrocarbons (CHC). Affected are the media soil (max 7 700mg / kgTS), soil air (max 10 936 mg / m 3 ) and groundwater (maximum 235 000 μg / l).

ISCO refurbishment plants, 40% NaMnO4 solution, mobile, enclosed soil air extraction systems and more according to the specifications are to be supplied.

On the site Bunsenstraße 2 and the south adjacent property of the company Kahl in Trittau (see Appendices 1 and 2) has been proven by extensive investigations an underground pollution by volatile chlorinated hydrocarbons (CHC). Affected are the media soil (max 7 700mg / kgTS), soil air (max 10 936 mg / m 3 ) and groundwater (maximum 235 000 μg / l).

The underground damage is to be remedied from spring 2017 as part of an EU-funded land recycling. It is intended to carry out the groundwater remediation by means of the ISCO (In Situ Chemical Oxidation) method, which is supported by a parallel soil vapor extraction system. As an oxidizing agent permanganate should be used. In addition, a partial soil replacement will be carried out in connection with the separate decommissioning of all construction facilities on the Bunsenstraße 2 property.

ISCO refurbishment plants, 40% NaMnO4 solution, mobile, enclosed soil air extraction systems and more according to the specifications are to be supplied.

  • 1