Public tenders for catering in Werne Germany

Find all Catering tenders in the world.
Finding business opportunities has never been easier.

Results for catering. Make a new search!

Architectural services for buildings

Bäderbetrieb der Stadt Werne | Published June 17, 2016
Winner
Geising+Böker Generalplaner GmbH
cpvs
71221000, 71247000

The Bäderbetrieb town Werne intends the construction of the swimming pool and an outdoor brine pool and the renovation of the swimming pool with the existing 50m pool at the Natur-Solebad Werne "Am Hagen 2".

The following space program is to be implemented:

- 25 m sport pool with 5 swimming lines including integrated 1 m (springboard) and 3 m (platform) jump facility and Teilhubboden,

- Multifunction pool (approximately 100 m² water surface) with movable floor,

- Sliding system (body slide with 80 m length)

- Kiddie pool (about 40 square meters of water) with child-friendly attractions,

- Catering each for the bath and the salt chamber,

- All season brine pool with 560 m² of water including a connected Sole Lounge as lounge,

- Administrative area with offices and staff rooms,

- The same program next room for a sports and leisure oriented bath,

- Restoration of the outdoor pool, taking account of the 50 m-basin and construction of a toddlers pool.

Object of the contract awarded to the project planning in the power image building and interiors as well as outdoor installations in the work phases 2 to. 9

Architectural services for buildings

Bäderbetrieb der Stadt Werne | Published November 6, 2015  -  Deadline December 4, 2015
cpvs
71221000, 71247000

The Bäderbetrieb the city Werne intends the construction of the indoor pool and a saltwater outdoor pool and renovation of the swimming pool with the existing 50-meter pool at the natural Werne brine bath "Am Hagen 2". The following space program is to be implemented: - 25 m lap pool with 5 swimming lines including integrated 1 m (springboard) and 3 m (platform) diving boards and Teilhubboden, - Multifunction pool (approximately 100 m² water surface) with lifting bottom - slipping system (body slide with ca. 80 m length), - children's wading pool (about 40 square meters of water) with child-friendly attractions - catering each for the bathroom and the Sole area - year-round saltwater pool with 560 m² water surface, including a connected Sole-Lounge as lounge area, - administrative area with offices and staff rooms - The same Outbuildings program for a sports and leisure oriented bath, - renovation of the swimming pool, taking into account the 50 m basin and construction of a toddlers pool. Object of the contract awarded to the project planning in the power image building and interiors as well as outdoor installations in the work phases 2 to. 9

Engineering services

Bäderbetrieb der Stadt Werne | Published December 5, 2015  -  Deadline January 14, 2016
cpvs
71300000

The Bäderbetrieb the city Werne intends the construction of the indoor pool and a saltwater outdoor pool and renovation of the swimming pool with the existing 50-meter pool at the natural Werne brine bath "Am Hagen 2". The subject of this procurement procedure are the specialist planning services for power image § 55 (HOAI) - technical equipment for this project. The following space program is to be implemented: - 25 m lap pool with 5 swimming lines including integrated 1 m (springboard) and 3 m (platform) diving boards and Teilhubboden, - Multifunction pool (approximately 100 m² water surface) with lifting bottom - slipping system (body slide with ca. 80 m length), - children's wading pool (about 40 square meters of water) with child-friendly attractions - catering each for the bathroom and the Sole area - year-round saltwater pool with 560 m² water surface, including a connected Sole-Lounge as lounge area - administrative area with offices and staff rooms, - The same Outbuildings program for a sports and leisure oriented bath, - renovation of the swimming pool, taking into account the 50 m basin and construction of a small children's pool covered by this contract award procedure are the specialist planning services for power image § 55 (HOAI) - technical equipment for this project.

Engineering services

Bäderbetrieb der Stadt Werne | Published June 17, 2016
Winner
Ingenieurgesellschaft Bannert mbH
cpvs
71300000

The Bäderbetrieb town Werne intends the construction of the swimming pool and an outdoor brine pool and the renovation of the swimming pool with the existing 50m pool at the Natur-Solebad Werne "Am Hagen 2".

The subject of this procurement procedure are the specialized design services for power image § 55 (HOAI) - technical equipment for this project.

The following space program is to be implemented:

- 25 m sport pool with 5 swimming lines including integrated 1 m (springboard) and 3 m (platform) jump facility and Teilhubboden,

- Multifunction pool (approximately 100 m² water surface) with movable floor,

- Sliding system (body slide with 80 m length)

- Kiddie pool (about 40 square meters of water) with child-friendly attractions,

- Catering each for the bath and the salt chamber,

- All season brine pool with 560 m² of water including a connected Sole Lounge as lounge

- Administrative area with offices and staff rooms,

- The same program next room for a sports and leisure oriented bath,

- Restoration of the outdoor pool, taking account of the 50 m-basin and construction of a toddlers pool.

The subject of this procurement procedure are the specialized design services for power image § 55 (HOAI) - technical equipment for this project.

  • 1