Public tenders for catering in Hamburg Germany

Find all Catering tenders in the world.
Finding business opportunities has never been easier.

Results for catering. Make a new search!

Construction of a catering kitchen

Behörde für Stadtentwicklung und Wohnen | Published September 12, 2017  -  Deadline September 28, 2017
cpvs

Supply and installation of a stainless steel catering kitchen with wall-mounted and various work cabinets; Kitchen sink; Cooling freezer combination approx. 340 liters; Dishwasher,

Catering services

f & w fördern und wohnen AöR | Published August 8, 2015  -  Deadline October 7, 2015
cpvs
55520000

Promote production and supply of public catering / lunch at various facilities of f & w and live AöR in Hamburg and the immediate vicinity. There are facilities for the elderly and institutions for integration assistance.

Kitchen equipment, household and domestic items and catering supplies

Universitätsklinikum Hamburg-Eppendorf | Published July 8, 2015  -  Deadline August 3, 2015
cpvs
39220000, 39221000

- Planning the concept for the "Bistro Kids UKE" taking into account and in further development of the ideas of the client to offer the food / beverages and the operations. - Design and equipment production and output areas as part of the to be planned and to be implemented concept. - Implementation (delivery and installation) of the concept within the cost and time frame.

Military Hospital, UmBauhaus 1 Conveyors, Kreuzbau, freight elevator Catering

Bundesbauabteilung Hamburg, in Vertretung für die Bundesrepublik Deutschland | Published March 7, 2017  -  Deadline April 19, 2017
cpvs

Military Hospital, UmBauhaus 1

Accommodation, catering, seminar rental and seminar equipment during the International Expert and Evaluation Conference of the ENSA Program in November 2017

Engagement Global gGmbH - Service für Entwicklungsinitiativen | Published July 19, 2017  -  Deadline August 9, 2017
cpvs
55110000, 55100000, 55120000

Notice

Event services

Norddeutscher Rundfunk (NDR) | Published September 29, 2017
Winner
Sievers Consulting GmbH
cpvs
79952000

For events in the field of live communication, the NDR is looking for one or several event agencies that support the responsible areas of the NDR during the conception, planning, organization and implementation.

Rostock).

- Listing of procurement and cost control incl.

- Creation of commissioning and planking surveys.

NDR procurement guidelines (see 3.4.6).

- Review offer for profitability.

- Review, evaluation and dissemination of offers for approval to clients.

- Commissioning.

- Creation and sending of an MRP / Masterplan, ie:

- Create parameters for Masterplan.

Scheduling).

- Voting Masterplan client.

Updates).

- Creation of a true-to-scale map including all facilities, incl.

- coordination with client.

- Briefing and production with department.

Coordination with all relevant authorities / overall organizers.

Cooperations, catering.

2

Lot 1 |

Port of Hamburg

Hanse Sail

- Submission of the required content for the NDR event to create a

Implementation of the measures required by the overall organizer in the safety concept.

- commissioning, handling and billing of the artists.

- Briefing by client / program.

- enforce transmission, performance and documentation rights.

- voting contracts with management and NDR.

- Handling Technical Rider and coordination of stage requirements.

- Handling and billing GEMA.

- Handling and settlement of the artist's social insurance fund (KSK).

- Operative updates of the artists (hotel, directions).

- Vote PR special actions, recordings.

- On site, artist support.

- Billing management.

- Billing / Overview Program Boudget.

- Billing against the NDR including all additional costs (catering, towels, etc.).

The requirements of the NDR must be taken into account.

Crew catering.

- On-site support for all NDR activities, ie:

- Total Sequence Management and Stage Management.

- Coordination and control of all external and internal trades.

- Creation of the photomaterial of the program points.

- NDR care programs.

Gastronomic, brand partners).

- Support NDR press office / PR agency.

- support of editorial offices / NDR television, radio, online / integration of NDR television broadcasts into the show process, if desired.

Safety regulations and accident prevention regulations.

- Compliance with DIN Norm 15905-5 (sound level measurement).

The Kiel weekly office does not see itself as an overall event organizer, but rather as overall coordinator, organizer and part-organizer of Kiel Week.

- Listing of procurement and cost control incl.

- Creation of commissioning and planking surveys.

NDR procurement guidelines (see 3.4.6).

- Review offer for profitability.

- Review, evaluation and dissemination of offers for approval to clients.

- Commissioning.

- Creation and sending of an MRP / Masterplan, ie:

- Create parameters for Masterplan.

Scheduling).

- Voting Masterplan client.

Updates).

- Creation of a true-to-scale map including all facilities, incl.

- coordination with client.

- Briefing and production with department.

Coordinate with all relevant authorities / overall coordinator Kiel Week.

Cooperations, catering.

- Establish a safety concept for the NDR area based on the guidelines / guidelines of the local authorities.

- commissioning, handling and billing of the artists.

- Briefing by client / program.

- enforce transmission, performance and documentation rights.

- voting contracts with management and NDR.

- Handling Technical Rider and coordination of stage requirements.

- Handling and billing GEMA.

- Handling and settlement of the artist's social insurance fund (KSK).

- Operative updates of the artists (hotel, directions).

- Vote PR special actions, recordings.

- On site, artist support.

- Billing Management 2.

Lot 2 |

Kiel Week

- Billing / Overview Program Boudget.

- Billing against the NDR including all additional costs (catering, towels, etc.).

The requirements of the NDR must be taken into account.

Crew catering.

- Handling of VIP events / side events (reception mayor, VIP reception).

- On-site support for all NDR activities, ie:

- Total Sequence Management and Stage Management.

- Coordination and control of all external and internal trades.

- creation of photographic material d

"Framework agreement for conference venues for seminars for employees of the BA (RIS Erfurt) - Public Call 13-17-00900

Bundesagentur für Arbeit | Published November 7, 2017  -  Deadline November 21, 2017
cpvs

For the employees of the Federal Employment Agency suitable conference facilities (accommodation, catering, seminar and group rooms with appropriate technical and media equipment) are required for the realization of seminars.

Software programming and consultancy services

Elbphilharmonie und Laeiszhalle Service GmbH | Published October 17, 2015
Winner
spiritec GbR
cpvs
72200000

The contract was awarded relates to the web shop programming, its renewal in connection with the relaunch of the Internet platform for venues Laeiszhalle and Elbphilharmonie is required. The web shop is networked with other systems, conduct online sales of a complete range of services for the event venues. It is the integration with various systems (partly as an optional power), namely: - elphilharmonie.de The web page; - The event-ticket system; - The Plaza ticketing; - The payment providers; - Merchandising (optional); - Parking (optional); - Gastro-performance (optional); - Catering during the event break (optional); - Insurance; - Vouchers; - Purchase Order (optional); - Order the Elbphilharmonie card (optional); planned. The web shop also is responsible for platform-overarching Services: - Single Sign On Login; - SelfCare functions (administration of user master data); - Newsletter-Registration; - Process Management; - Logging; - Monitoring. This requires streamlined processes, contemporary ergonomics of the user interface and a high-performance software solution. 500 operations) must be guaranteed. The web shop The user interface corresponds to the CI of the Elbphilharmonie / Laeiszhalle and support in the form of responsive design and / or independent forms depending Form Factor all common devices and browsers. The contractor is also responsible for - the operation, - and the support to the client as part of the Administration,

EURES Adviser Anniversary 2018 - 13-17-00814

Bundesagentur für Arbeit | Published October 17, 2017  -  Deadline November 10, 2017
cpvs

For BA employees and their partner organizations, an external meeting place (accommodation, catering, meeting room and seminar rooms with appropriate technical and media equipment) is required for carrying out a further training course. The measure is referred to as the "EURES-Tagung 2018".

Detailed design planning of technical equipment in accordance with § 53 HOAI and production of technical investments within the revitalization of the Congress Centrum Hamburg (CCH) in 2 lots as responsible (partial) general contractor.

CCH Immobilien GmbH & Co. KG | Published November 15, 2014  -  Deadline December 12, 2014
cpvs
45330000, 71320000, 45310000, 45350000

Subject to final political decisions in December 2014, the detailed design and implementation from 2015 from 2016 is planned. On the other side stands the old building, which was built at the time as "multipurpose building" with 2 large, theaterbestuhlten halls, three other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH must be adjusted accordingly. The key points of this design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors that take place at the same time in the CCH, events related to separate and distinct paths guided tours and catering (Catering , assembly and disassembly, maintenance, etc. provided). The following measures are generally provided: - demolition component Ost - coring device center and renovation of facilities and plant engineering - construction and enlargement of the part east and enlargement of the conference areas with spacious lounge areas and a building high foyer area - Integration of Meeting and Event Technology (Media Technology) in the building, - construction of a new building automation with a building management system, taking into account the high demands of different usage areas - meeting high comfort requirements through the building, fire extinguishing systems and voice alarm, - adaptation of the technical building equipment in the component West as required. With the revitalization of the CCH DGNB gold standard is sought. The present draft planning forms the basis of the performance for the advertised performance here. The preliminary design for lighting, kitchen / dining and event technology were created in parallel to the planning of technical equipment and are also present at the draft stage. In addition, all construction trades of building services including project / construction work activities are to be performed. These benefits, however, are to coordinate and inter-lust. The access control systems are integrated into the planning. The forecourt is the only one within easy walking access to the CCH and the adjacent hotel and at the same time to connect the two parks planet un Blomen and ramparts. Based on the cost calculation Senate and Parliament of the Free and Hanseatic City of Hamburg will decide conclusively the end of 2014 / beginning of 2015 on the implementation of the project. The performance of the work provided for in the years 2016-2018. 100 million euros net (KG 300 + 400 + 500).

Ancillary building services

CCH Immobilien GmbH & Co. KG | Published July 4, 2015  -  Deadline July 30, 2015
cpvs
71326000

The detailed design is planned for 2015 and the implementation from 2017. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, 3 other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time in the CCH, event related to separate and part ways tours for visitors and supply (catering, construction and dismantling, maintenance, etc.) to be provided. The following measures are mainly provided: - demolition component Ost, - gutting component center and renewal of equipment and plant engineering, - construction and enlargement of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - construction of a new building automation with a building control systems taking into account the high demands of the different functional areas, - meeting high comfort requirements through the building, - adaptation of the technical building equipment in the part West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. The preparation of tender documents for the building services as well as for the demolition and the removal of hazardous materials is not included in this award. The Proposals must be with sufficient advance, even taking into account the relevant deadlines of VOB / A, completed.

Hotel services

Techniker Krankenkasse | Published November 15, 2017  -  Deadline December 11, 2017
cpvs
55100000

Further training events are held nationwide for the TK staff, especially in Hamburg and the surrounding area of ​​Hamburg and in the Ruhr area. The organization of these events is currently carried out centrally in the TK service center Personnel Service by the team Business Travel and Events.

Not all events can be conducted in private rooms, eg. B. for capacity reasons. For this the TK books conference rooms and overnight stays in hotels.

All further information can be found in the tender documents.

The services to be provided include the provision of meeting rooms including presentation material and technology, catering services and rooms.

Mechanical engineering installation works

CCH Immobilien GmbH & Co. KG | Published November 5, 2015
Winner
Schindler Aufzüge und Fahrtreppen GmbH
cpvs
45351000, 71320000

The Free and Hanseatic City of Hamburg (FHH) wants for the Congress Centrum Hamburg modernize its strategic position as an international convention city and to further expand (CCH) fundamentally. The detailed design architecture has been started which Umseetzung is planned for the 2017th On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, 3 further large halls and eleven smaller group rooms. In addition, exhibit space and communication areas are required. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time at the CCH, event related to separate and part ways tours for visitors and supply (catering, construction and dismantling, maintenance, etc.) provide. There are provided in the following main measures: - demolition component Ost, - coring component center, conveyor technology) - New construction and expansion of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - construction of a new building automation with a building control system, taking account the high demands of the different functional areas, - meet high comfort requirements through the building, - adaptation of the technical building equipment in the component West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. The present draft plan forms the basis of the performance for the advertised here performance. As part of the services to be awarded here all further planning services in particular the 5 Phases HOAI and all workshop and assembly plans are to provide for materials handling equipment (KGR 700). In addition, all works of art, including project funding / construction management activities are to be performed. The execution of the works provided for in the years 2017-2019.

Construction-site supervision services

CCH Immobilien GmbH & Co. KG | Published July 25, 2015  -  Deadline August 24, 2015
cpvs
71521000

Following the enlargement of the center in 2007 should be made now for a revitalization and renewal of demand in 1973 built old building. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, three more halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The design and approval planning of the technical equipment was created by RMN engineers. With the revitalization least the DGNB Silver Standard to be achieved DGNB Gold Standard is aimed at. The CCH then has 43 flexible meeting rooms with up to 13,270 seats in normal operation. The key points of the feasibility study are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time at the CCH, event related to separate and part ways tours for visitors and supply (catering, assembly and dismantling, maintenance etc. provide). Based on the present approval planning the following measures are mainly provided: - demolition component Ost, - construction and enlargement of the component East with spacious living areas and ei-ner building high lobby - coring component center and the renewal and modernization of the equipment and plant engineering, construction of a new building automation with a building control system taking into account the high demands of the different functional areas, - compliance with high comfort requirements through the building, - adaptation of the technical building equipment in the component West as required. The following awarding entities are distinguished: building automation, procurement unit 2 heating / air conditioning / ventilation / sanitation / use-specific installations, allocation unit 3 handling technology and procurement unit 4 special lighting.

Mechanical engineering installation works

CCH Immobilien GmbH & Co. KG | Published June 17, 2015  -  Deadline July 15, 2015
cpvs
45351000, 71320000

The detailed design architecture has been started, the Umseetzung is planned in 2017. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, three other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time in the CCH, event related to separate and part ways tours for visitors and supply (catering, construction and dismantling, maintenance, etc.) to be provided. There are provided in the following main measures: - demolition component Ost, - gutting component center, conveyor technology) - New construction and expansion of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - construction of a new building automation with a building control system, taking account the high demands of the different functional areas, - meeting high comfort requirements through the building, - adaptation of the technical building equipment in the part West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. This preliminary design is the basis of the performance for the advertised performance here. In addition, all construction materials handling technology including project / construction management activities are to be performed. The execution of the works provided for in the years 2017-2019.

Software programming and consultancy services

HamburgMusik gGmbH – Elbphilharmonie und Laeiszhalle Betriebsgesellschaft | Published June 18, 2015
Winner
m.i.r. media Digital Agency
cpvs
72200000

In the future, then the jointly controlled concert halls of Hamburg - the traditional Laeiszhalle and the nascent Elbphilharmonie - are represented under the joint website. Added to Elbphilharmonie Concerts which are not directed at the Laeiszhalle in the Elbe Philharmonic Hall, but at external venues. Access zurPlaza is controlled via an access control system, tickets can be booked via a separately accessible area of ​​the web shop. The presentation of the whole project and the access to the Plaza and the online Verkaufvon Plaza tickets will be central tasks of the site - as well as the meaningful linkage of the public area of ​​the Elbe Philharmonic concert with the commercial areas Hotel, catering and parking garage. The website must be in addition to a clear Konzertkalender a presentation tool for different usage and visitation, which must be linked to each other as possible. Since the events are held in both houses mainly evenings and weekends, a support must also be ensured.

Secondary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published October 4, 2017
cpvs
45214220, 39220000, 39314000, 39141000, 39221000, 39711200

The district school is located in the Hamburg district of Winterhude. The construction project comprises the new construction of a class house on the historically grown school location on the Meerweinstraße 26-28 vis-à-vis main building of the district school of Fritz Schumacher.

The new building of the class house is planned as a 3-storey building with a partial basement. The second floor is back staggered on the southeast side.

The BGF of the building is approx. 3 925 m². The construction site is accessible via the adjacent Wohnstraße Geißlertwiete regardless of the school company. The school enterprise continues to work in other building parts during the construction work.

A module 1 final production kitchen is planned at the location of the Meerweinstraße.

For later use, use of the kitchen is provided as a warm-up kitchen and food dispenser.

The food is produced by a catering service outside the school grounds.

Buildings associated with transport

Flughafen Hamburg GmbH | Published September 27, 2017  -  Deadline November 6, 2017
cpvs
45213300, 45213331, 71240000

The object of the award is the ready-to-go and ready-to-use production of a hall building (BGF approx. 8 200 m 2 ) according to defined procedural, functional, spatial and plant engineering requirements for passenger handling.

The construction site is located on the apron 2 in the security area of ​​the airport. Construction is carried out on a "island-side" island site under parallel operation.

14 aircraft positions on the apron will be developed in the walk-in-walk-out process. The terminal is connected via shuttle buses.

In the hall are waiting areas for passengers including sanitary facilities, staff rooms and temporary storage areas for retail and catering.

The useful life is defined as 20 years.

Operational commissioning must take place no later than 1 July 2019.

See point II.1.4).

Buildings associated with transport

Flughafen Hamburg GmbH | Published September 28, 2017  -  Deadline November 6, 2017
cpvs
45213300, 45213331, 71240000

The object of the award is the ready-to-go and ready-to-use production of a hall building (BGF approx. 8 200 m 2 ) according to defined procedural, functional, spatial and plant engineering requirements for passenger handling.

The construction site is located on the apron 2 in the security area of ​​the airport. Construction is carried out on a "island-side" island site under parallel operation.

14 aircraft positions on the apron will be developed in the walk-in-walk-out process. The terminal is connected via shuttle buses.

In the hall are waiting areas for passengers including sanitary facilities, staff rooms and temporary storage areas for retail and catering.

The useful life is defined as 20 years.

Operational commissioning must take place no later than 1 July 2019.

Buildings associated with transport

Flughafen Hamburg GmbH | Published October 27, 2017  -  Deadline November 14, 2017
cpvs
45213300, 45213331, 71240000

The object of the award is the ready-to-go and ready-to-use production of a hall building (BGF approx. 8,200 m2) according to defined procedural, functional, spatial and plant engineering requirements for passenger handling.

The construction site is located on the apron 2 in the security area of ​​the airport. Construction is carried out on a "island-side" island site under parallel operation.

14 aircraft positions on the apron will be developed in the walk-in-walk-out process. The terminal is connected via shuttle buses.

In the hall are waiting areas for passengers including sanitary facilities, staff rooms and temporary storage areas for retail and catering.

The useful life is defined as 20 years.

Operational commissioning must take place no later than 1 July 2019.