Call +44 800 9755 164

Public tenders for catering in Hamburg Germany

Find all Catering tenders in the world.
Finding business opportunities has never been easier.

Results for catering. Make a new search!

Catering services

f & w fördern und wohnen AöR | Published August 8, 2015  -  Deadline October 7, 2015
cpvs
55520000

Promote production and supply of public catering / lunch at various facilities of f & w and live AöR in Hamburg and the immediate vicinity. There are facilities for the elderly and institutions for integration assistance.

Kitchen equipment, household and domestic items and catering supplies

Universitätsklinikum Hamburg-Eppendorf | Published July 8, 2015  -  Deadline August 3, 2015
cpvs
39220000, 39221000

- Planning the concept for the "Bistro Kids UKE" taking into account and in further development of the ideas of the client to offer the food / beverages and the operations. - Design and equipment production and output areas as part of the to be planned and to be implemented concept. - Implementation (delivery and installation) of the concept within the cost and time frame.

Military Hospital, UmBauhaus 1 Conveyors, Kreuzbau, freight elevator Catering

Bundesbauabteilung Hamburg, in Vertretung für die Bundesrepublik Deutschland | Published March 7, 2017  -  Deadline April 19, 2017
cpvs

Military Hospital, UmBauhaus 1

Software programming and consultancy services

Elbphilharmonie und Laeiszhalle Service GmbH | Published October 17, 2015
Winner
spiritec GbR
cpvs
72200000

The contract was awarded relates to the web shop programming, its renewal in connection with the relaunch of the Internet platform for venues Laeiszhalle and Elbphilharmonie is required. The web shop is networked with other systems, conduct online sales of a complete range of services for the event venues. It is the integration with various systems (partly as an optional power), namely: - elphilharmonie.de The web page; - The event-ticket system; - The Plaza ticketing; - The payment providers; - Merchandising (optional); - Parking (optional); - Gastro-performance (optional); - Catering during the event break (optional); - Insurance; - Vouchers; - Purchase Order (optional); - Order the Elbphilharmonie card (optional); planned. The web shop also is responsible for platform-overarching Services: - Single Sign On Login; - SelfCare functions (administration of user master data); - Newsletter-Registration; - Process Management; - Logging; - Monitoring. This requires streamlined processes, contemporary ergonomics of the user interface and a high-performance software solution. 500 operations) must be guaranteed. The web shop The user interface corresponds to the CI of the Elbphilharmonie / Laeiszhalle and support in the form of responsive design and / or independent forms depending Form Factor all common devices and browsers. The contractor is also responsible for - the operation, - and the support to the client as part of the Administration,

Detailed design planning of technical equipment in accordance with § 53 HOAI and production of technical investments within the revitalization of the Congress Centrum Hamburg (CCH) in 2 lots as responsible (partial) general contractor.

CCH Immobilien GmbH & Co. KG | Published November 15, 2014  -  Deadline December 12, 2014
cpvs
45330000, 71320000, 45310000, 45350000

Subject to final political decisions in December 2014, the detailed design and implementation from 2015 from 2016 is planned. On the other side stands the old building, which was built at the time as "multipurpose building" with 2 large, theaterbestuhlten halls, three other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH must be adjusted accordingly. The key points of this design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors that take place at the same time in the CCH, events related to separate and distinct paths guided tours and catering (Catering , assembly and disassembly, maintenance, etc. provided). The following measures are generally provided: - demolition component Ost - coring device center and renovation of facilities and plant engineering - construction and enlargement of the part east and enlargement of the conference areas with spacious lounge areas and a building high foyer area - Integration of Meeting and Event Technology (Media Technology) in the building, - construction of a new building automation with a building management system, taking into account the high demands of different usage areas - meeting high comfort requirements through the building, fire extinguishing systems and voice alarm, - adaptation of the technical building equipment in the component West as required. With the revitalization of the CCH DGNB gold standard is sought. The present draft planning forms the basis of the performance for the advertised performance here. The preliminary design for lighting, kitchen / dining and event technology were created in parallel to the planning of technical equipment and are also present at the draft stage. In addition, all construction trades of building services including project / construction work activities are to be performed. These benefits, however, are to coordinate and inter-lust. The access control systems are integrated into the planning. The forecourt is the only one within easy walking access to the CCH and the adjacent hotel and at the same time to connect the two parks planet un Blomen and ramparts. Based on the cost calculation Senate and Parliament of the Free and Hanseatic City of Hamburg will decide conclusively the end of 2014 / beginning of 2015 on the implementation of the project. The performance of the work provided for in the years 2016-2018. 100 million euros net (KG 300 + 400 + 500).

Ancillary building services

CCH Immobilien GmbH & Co. KG | Published July 4, 2015  -  Deadline July 30, 2015
cpvs
71326000

The detailed design is planned for 2015 and the implementation from 2017. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, 3 other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time in the CCH, event related to separate and part ways tours for visitors and supply (catering, construction and dismantling, maintenance, etc.) to be provided. The following measures are mainly provided: - demolition component Ost, - gutting component center and renewal of equipment and plant engineering, - construction and enlargement of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - construction of a new building automation with a building control systems taking into account the high demands of the different functional areas, - meeting high comfort requirements through the building, - adaptation of the technical building equipment in the part West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. The preparation of tender documents for the building services as well as for the demolition and the removal of hazardous materials is not included in this award. The Proposals must be with sufficient advance, even taking into account the relevant deadlines of VOB / A, completed.

Mechanical engineering installation works

CCH Immobilien GmbH & Co. KG | Published November 5, 2015
Winner
Schindler Aufzüge und Fahrtreppen GmbH
cpvs
45351000, 71320000

The Free and Hanseatic City of Hamburg (FHH) wants for the Congress Centrum Hamburg modernize its strategic position as an international convention city and to further expand (CCH) fundamentally. The detailed design architecture has been started which Umseetzung is planned for the 2017th On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, 3 further large halls and eleven smaller group rooms. In addition, exhibit space and communication areas are required. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time at the CCH, event related to separate and part ways tours for visitors and supply (catering, construction and dismantling, maintenance, etc.) provide. There are provided in the following main measures: - demolition component Ost, - coring component center, conveyor technology) - New construction and expansion of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - construction of a new building automation with a building control system, taking account the high demands of the different functional areas, - meet high comfort requirements through the building, - adaptation of the technical building equipment in the component West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. The present draft plan forms the basis of the performance for the advertised here performance. As part of the services to be awarded here all further planning services in particular the 5 Phases HOAI and all workshop and assembly plans are to provide for materials handling equipment (KGR 700). In addition, all works of art, including project funding / construction management activities are to be performed. The execution of the works provided for in the years 2017-2019.

Construction-site supervision services

CCH Immobilien GmbH & Co. KG | Published July 25, 2015  -  Deadline August 24, 2015
cpvs
71521000

Following the enlargement of the center in 2007 should be made now for a revitalization and renewal of demand in 1973 built old building. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, three more halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The design and approval planning of the technical equipment was created by RMN engineers. With the revitalization least the DGNB Silver Standard to be achieved DGNB Gold Standard is aimed at. The CCH then has 43 flexible meeting rooms with up to 13,270 seats in normal operation. The key points of the feasibility study are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time at the CCH, event related to separate and part ways tours for visitors and supply (catering, assembly and dismantling, maintenance etc. provide). Based on the present approval planning the following measures are mainly provided: - demolition component Ost, - construction and enlargement of the component East with spacious living areas and ei-ner building high lobby - coring component center and the renewal and modernization of the equipment and plant engineering, construction of a new building automation with a building control system taking into account the high demands of the different functional areas, - compliance with high comfort requirements through the building, - adaptation of the technical building equipment in the component West as required. The following awarding entities are distinguished: building automation, procurement unit 2 heating / air conditioning / ventilation / sanitation / use-specific installations, allocation unit 3 handling technology and procurement unit 4 special lighting.

Mechanical engineering installation works

CCH Immobilien GmbH & Co. KG | Published June 17, 2015  -  Deadline July 15, 2015
cpvs
45351000, 71320000

The detailed design architecture has been started, the Umseetzung is planned in 2017. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, three other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time in the CCH, event related to separate and part ways tours for visitors and supply (catering, construction and dismantling, maintenance, etc.) to be provided. There are provided in the following main measures: - demolition component Ost, - gutting component center, conveyor technology) - New construction and expansion of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - construction of a new building automation with a building control system, taking account the high demands of the different functional areas, - meeting high comfort requirements through the building, - adaptation of the technical building equipment in the part West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. This preliminary design is the basis of the performance for the advertised performance here. In addition, all construction materials handling technology including project / construction management activities are to be performed. The execution of the works provided for in the years 2017-2019.

Software programming and consultancy services

HamburgMusik gGmbH – Elbphilharmonie und Laeiszhalle Betriebsgesellschaft | Published June 18, 2015
Winner
m.i.r. media Digital Agency
cpvs
72200000

In the future, then the jointly controlled concert halls of Hamburg - the traditional Laeiszhalle and the nascent Elbphilharmonie - are represented under the joint website. Added to Elbphilharmonie Concerts which are not directed at the Laeiszhalle in the Elbe Philharmonic Hall, but at external venues. Access zurPlaza is controlled via an access control system, tickets can be booked via a separately accessible area of ​​the web shop. The presentation of the whole project and the access to the Plaza and the online Verkaufvon Plaza tickets will be central tasks of the site - as well as the meaningful linkage of the public area of ​​the Elbe Philharmonic concert with the commercial areas Hotel, catering and parking garage. The website must be in addition to a clear Konzertkalender a presentation tool for different usage and visitation, which must be linked to each other as possible. Since the events are held in both houses mainly evenings and weekends, a support must also be ensured.

Plumbing and sanitary works

CCH Immobilien GmbH & Co. KG | Published September 1, 2015
Winner
Caverion Deutschland GmbH
cpvs
45330000, 71320000, 45310000, 45350000

Subject to final policy decisions in December 2014, the detailed design in 2015 and the implementation of 2016 is planned. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, three other large halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. The cornerstones of the present design / planning permission application are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors that take place at the same time at the CCH, event related to separate and part ways tours for visitors and supply (catering , assembly and disassembly, maintenance, etc. provided). The following measures are mainly provided: - demolition component Ost, - coring component center and renewal of equipment and plant engineering, - construction and enlargement of the component East and enlargement of the conference areas with spacious living areas and a building high foyer area, - integration of conference and event technology (Media Technology) in the building, - construction of a new building automation with a building control system taking into account the high demands of the different functional areas, - meet high comfort requirements through the building, fire extinguishing systems and voice alarm, - adaptation of the technical building equipment in the component West as required. With the revitalization of the CCH the DGNB Gold Standard is sought. The present draft plan forms the basis of the performance for the advertised here performance. The preliminary design for lighting, kitchen / dining and event technology were created in parallel with the planning of the technical equipment and are also present at the draft stage. In addition, all works of the technical building trades including project / construction work activities are to be performed. These services are, however, to coordinate and integrate. The access control systems are to be integrated into the planning. The forecourt is the only within easy walking access to the CCH and to the neighboring hotel and at the same time connection to the two parks Planten un Blomen and ramparts. Based on the cost calculation Senate and Parliament of the Free and Hanseatic City of Hamburg will take a final decision late 2014 / early 2015 on the implementation of the project. The execution of the works provided for in the years 2016-2018. 100 000 000 EUR net (KG 300 + 400 + 500).

Demolition, site preparation and clearance work

CCH Immobilien GmbH & Co. KG | Published December 16, 2015  -  Deadline January 19, 2016
cpvs
45111000

Following the enlargement of the center in 2007 should take place now for a revitalization and renewal of demand in 1973 built old building. On the other side stands the old building, which was built at that time as a "multifunctional building" with 2 large, theaterbestuhlten halls, three more halls and eleven smaller group rooms. To remain competitive and to enable further growth in the utilization of the CCH, the spatial structure of the CCH should be adjusted accordingly. Based on this, a facade competition was held, from which the consortium AGN Leusmann GmbH / Tim Hupe Architekten emerged as the first winner. The design and approval planning of the technical equipment was created by RMN engineers. With the revitalization least the DGNB Silver Standard to be achieved DGNB Gold Standard is aimed at. The CCH then has 43 flexible meeting rooms with up to 13 270 seats in normal operation. The key points of the feasibility study are: - operating division of CCH in a western, a central and an eastern part, - the flow of visitors to events that are taking place at the same time at the CCH, event related to separate and part ways tours for visitors and supply (catering, assembly and dismantling, maintenance, etc. provided). Based on the present approval planning the following measures are provided mainly: - demolition component Ost including priority construction, - construction and enlargement of the component East with spacious living areas and a building high lobby - coring component center and the renewal and modernization of the equipment and plant engineering, construction of a new building automation with a building control system taking into account the high demands of the different functional areas, - meet high comfort requirements through the building, - adaptation of the technical building equipment in the component West as required. The contract is an extensive and demanding demolition action with high demands on occupational safety and health, the quality of implementation and compliance with noise control and vibration limits. Prestressed concrete constructions ("Hard Cancel") for the right of way construction with 2 basement floors and the adjoining 31 m high multi-storey part of the East CCH. To ensure the operation of the construction site immediately adjacent to hotels during the demolition interceptions of steel and reinforced concrete are connected to separating cuts in up to 1.00 m thick components under this demolition perform. The concrete demolition has to be crushed on the construction site with a crushing plant, so that it rubble recycling material of the grain size distribution is produced after 0/63 TL SoB-StB. Because of the hotel operation limits for the sound and the transfer of vibrations must be observed. When Period is 11 months provided in 2017th January 2017

Software programming and consultancy services

Elbphilharmonie und Laeiszhalle Service GmbH | Published July 25, 2015  -  Deadline August 31, 2015
cpvs
72200000

The Webshop is networked with other systems, the online sales of the complete range of services for event venues handle. It is planned to integrate with the following systems: - The web page elphilharmonie.de The other activities of the end-users are the responsibility of the web shop. The relaunch of the web page has been commissioned and is currently implemented. - The Event-Ticket System More activities like Checkout and delivery of print @ home-documents are the responsibility of the web shop. In addition, the ticket system is the leading system regarding. The administration of customer master data. Adjustments within the meaning of the planned integration in the web platform to be commissioned soon. - The Plaza ticketing tickets for events in the Elbphilharmonie automatically include the right of access to the Plaza. Prioritized distribution channel is the online sales. The web shop receives periodically from Plaza ticketing the availability per time window and must ensure a high-performance sales. - The payment provider The choice of payment provider is carried out with separate tender. These are to: - Merchandising (optional power) For the purposes of an unbroken inventory management, the aim is that the sale merchandising shop is handled by an integrated POS solution. - Parking (optional power) only in combination with an event ticket based on quantity quotas - Gastro services (optional services) Not necessarily in combination with an event ticket based on quantity quotas - Catering during the event Pause (optional power) only in combination with an event ticket based on quantity quotas - insurance only in conjunction with Event Services - vouchers this respect is another web-based application requires that supports the voucher sale and redemption by authorized cashiers. - Purchase Order (optional output) Instead the customer an order addressed to the ticket office with a request for telephone consultation. - Order the Elbphilharmonie-Card (optional power) The complete business transactions in the web shop are documented with a comprehensive reporting and communicates based auditable invoices to the accounting. The web shop also is responsible for platform-border services: - Single Sign On Login - SelfCare functions (administration of user master data) - newsletter registration - process management - Logging - Monitoring This requires streamlined processes, contemporary ergonomics of the user interface and a high-performance software solution. 500 operations) be ensured. The web shop The user interface corresponds to the CI of the Elbphilharmonie / Laeiszhalle and support in the form of responsive design and / or independent forms depending Form Factor all common devices and browsers. The contractor is also responsible for - the operation - and the support to the contractor as part of the Web shop administration in the production phase. Commissioning rendered on 01/03/2016.

Construction project management services

Verwaltungs- Berufsgenossenschaft (VBG) – Hauptverwaltung Hamburg | Published April 26, 2017  -  Deadline May 24, 2017
cpvs
71541000, 71540000

(VBG) and the Berufsgenossenschaft für Gesundheitsdienst und Wohlfahrtspflege (BGW) at the Hamburg site. The project management services for a construction project for a prevention center for the administrative professional association (VBG) In this case, it is intended to commission a project controller to commission a project controller, selected by means of a step-by-step assignment, according to the AHO expert commission "Project Management / Project Management" (as of May 2014).

The customers are planning to build a new prevention center in Hamburg's HafenCity (Baufeld 121), with the following distribution:

1. Qualification company (approx. 4 200 m² gross floor area),

2. Accommodation (about 9 800 m² gross floor area),

3. Catering business / health (approx. 2 600 m² gross floor area),

4. Prevention agency - other preventive services (approx. 6 200 m² gross floor area),

5. Bürobetrieb VBG (approx. 4 200 m² gross floor area) as well as,

6. Technology / Staircases / Underground garage (approx. 12,000 m² gross floor area).

A total of 28,000 m² of gross floor area will be developed above ground level.

More details can be found in the tender documents.

Architectural, engineering and planning services

GMH | Gebäudemanagement Hamburg GmbH | Published December 9, 2016
Winner
Kolb Planungsgesellschaft
cpvs
71240000

The GMH | Building management Hamburg GmbH was founded in 1987 for the sustainable construction and operation of commercial and municipal properties. Since 2013 GMH is a subsidiary of HGV Hamburger Gesellschaft Wealth and Investment Management mbH and thus indirectly owned by the Free and Hanseatic City of Hamburg. Focus of activity is the rehabilitation and management of school buildings in the south of Hamburg, and new buildings, renovation and management of university buildings.

The building MIN forum and computer science are by GMH | Building management Hamburg GmbH planned and built subject to the expected for the summer 2017 consent of the Hamburg Parliament under a tenant-landlord model and operated (for tenant-landlord model see Printed Matter 20/14486 at https: //www.buergerschaft- hh.de/parldok/).

The to schedule Catering is located primarily in the MIN-Forum. On the ground floor a cafeteria with 500 seats, a snack shop and a separate restaurant area with about 30 seats is to be realized there. On the ground floor of the computer science building that includes a cafeteria with 60 seats. All areas accessible to the host are supplied by a central kitchen preparation on the ground floor and basement of the MIN-Forum. The kitchen is designed for a production of 3 200 meals daily. The cafeteria is accessible via the common basement of the building and has its own distribution counter.

The services to be awarded consist of:

Technical equipment GEM. § 55 HOAI:

- Phases 3 (partial performance), and 4 acc. § 55 HOAI, technical equipment, investment group 7 gem. §53 (2) HOAI, part kitchen equipment (471 KG);

- Phases 5 to 8 gem. § 55 HOAI, technical equipment, investment group 7 gem. § 53 (2) HOAI, part kitchen equipment (KG 471) as an optional assignment by AG.

Demolition, site preparation and clearance work

CCH Immobilien GmbH & Co. KG | Published July 12, 2016
Winner
WiWa Wilko Wagner GmbH
cpvs
45111000

These services are part of a separate parallel tender, but have direct influence on the construction progress of constructive abandonment.

  • 1