Public tenders for business in Sandsli Norway

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!

Roads with infrastructure.

Multiconsult AS | Published November 14, 2015  -  Deadline January 8, 2016
cpvs
45000000

Roads with public installations and a bridge over the river Lone for the development of the Bjånes peninsula in Os municipality. Future development of 1 200 houses, business area and public services.

Development consultancy services

Inventura AS | Published November 8, 2017
Winner
Knowit Objectnet AS
cpvs
73220000, 72421000, 72230000, 72212780, 72212781, 72212782, 72212783

NDLA shall be internationalised through this project. In order to develop good digital teaching aids for sixth form education and to realise a Global Digital Library (GDL) together with our international partners, NDLA needs to join up with good suppliers of technical development services.

This competition is for framework agreements for the development of the following competence/service areas.

— Development of a framework for inter-activities — H5P or equivalent.

— UX/user experience, front-end development and design based on Java and Javascript.

— Technical architecture, system and delivery manager, roll-out and scaling of the operating environment.

See Annex 1 — The Contracting Authority's Requirement Specifications for details on what is included in ‘development’.

— Development of components for inter-activities.

— Design and development of new types of content.

— Development of a separate micro-service for inter-activities and content.

— Development work connected to both existing applications and new development.

— Development based on REACT, which is an open-source JavaScript library.

— Implementation of UX, including: Navigation, information structure, content adaptation and presentation, inter-activities and graphical design in client-side components that shall be exposed to different final user groups.

— Implementation of universal design for the design and development of new and existing systems.

— Authentication, cashing, indexing and searches.

— Responsible for the systems meeting business needs connected to GDL, both in the short and long term.

— Independent advice for NDLA on planning and carrying out development assignments.

— Design and development of architecture.

— Development of APIs connected to subject content.

— Development of functionality to consume external APIs.

— Taxonomy and data structuring competence that can contribute to organising and designing information structures, taxonomies, organising content marking and concepts for making content available on searches (internal and external), LMSs and other learning systems, adaptive learning systems, as well as our own navigation and viewing logic.

— GDL shall be developed and run on Amazon AWS or an equivalent service. There will be a need for assistance with the implementation and management of this framework during the project period. See the information in Annex 1.

Entreprise V2-RAS Construction

Multiconsult AS | Published July 1, 2016  -  Deadline September 7, 2016
cpvs
77800000, 03310000

The Industrial and Laboratory (ILAB), the principal, is a research foundation established in 1989 whose purpose is to facilitate research in aquaculture for both universities as private business and industry.

Target is the industry and government departments in the areas of fisheries, aquaculture and the environment.

ILAB is tenant.

This procurement safeguards delivery of RAS system with various support systems.

The entire processing facility established on the same plane, and it is clear delineation between the different departments.

Department of RAS equipment:

This project maintains complete RAS system with all components and guidelines for plumbing, electrical and automation.

In addition, it set aside spaces for equipment for oxygenation and air blowers for removing CO2 in RAS construction.

Marineholmen Industrial AS safeguards:

- Sped Water: Transportation of dilution water from Thormøhlens Gate 55 to inside of bygningsliv.

- Røra Add: Technical infrastructure for wastewater outside bygningsliv.

- Ventilation

Department of Post smolt and salmon lice lab:

This project safeguards the main intake seawater and solution to the wastewater out of the building with all components and guidelines for plumbing, electrical and automation.

Marineholmen Industrial AS safeguards:

- Seawater IPE: Carry forward the seawater from IPE to inside of bygningsliv.

- Seawater safety: Carry forward the seawater safety of Thormøhlens Gate 55 to inside of bygningsliv.

- Waste water: Waste water line from inside bygningsliv via jetty to sea

Entreprise E1 Electrical installations

Multiconsult AS | Published July 1, 2016  -  Deadline September 7, 2016
cpvs
77800000, 03310000

The Industrial and Laboratory (ILAB), the principal, is a research foundation established in 1989 whose purpose is to facilitate research in aquaculture for both universities as private business and industry.

Target is the industry and government departments in the areas of fisheries, aquaculture and the environment.

ILAB is tenant.

For example, under distribution with subcircuits and reserve units with automatic automatic switching.

The entire processing facility established on the same plane, and it is clear delineation between the different departments.

Department of RAS equipment:

This project maintains complete RAS system with all components and guidelines for plumbing, electrical and automation.

In addition, it set aside spaces for equipment for oxygenation and air blowers for removing CO2 in RAS construction.

Marineholmen Industrial AS safeguards:

- Sped Water: Transportation of dilution water from Thormøhlens Gate 55 to inside of bygningsliv.

- Røra Add: Technical infrastructure for wastewater outside bygningsliv.

- Ventilation

Department of Post smolt and salmon lice lab:

This project safeguards the main intake seawater and solution to the wastewater out of the building with all components and guidelines for plumbing, electrical and automation.

Marineholmen Industrial AS safeguards:

- Seawater IPE: Carry forward the seawater from IPE to inside of bygningsliv.

- Seawater safety: Carry forward the seawater safety of Thormøhlens Gate 55 to inside of bygningsliv.

- Waste water: Waste water line from inside bygningsliv via jetty to sea

Entreprise V1 Røra Add

Multiconsult AS | Published July 1, 2016  -  Deadline September 7, 2016
cpvs
77800000, 03310000

The Industrial and Laboratory (ILAB), the principal, is a research foundation established in 1989 whose purpose is to facilitate research in aquaculture for both universities as private business and industry.

Target is the industry and government departments in the areas of fisheries, aquaculture and the environment.

ILAB is tenant.

For example, pump sumps, piping in PE, kjølenalegg and guidelines for oxygen plants.

The entire processing facility established on the same plane, and it is clear delineation between the different departments.

Department of RAS equipment:

This project maintains complete RAS system with all components and guidelines for plumbing, electrical and automation.

In addition, it set aside spaces for equipment for oxygenation and air blowers for removing CO2 in RAS construction.

Marineholmen Industrial AS safeguards:

- Sped Water: Transportation of dilution water from Thormøhlens Gate 55 to inside of bygningsliv.

- Røra Add: Technical infrastructure for wastewater outside bygningsliv.

- Ventilation

Department of Post smolt and salmon lice lab:

This project safeguards the main intake seawater and solution to the wastewater out of the building with all components and guidelines for plumbing, electrical and automation.

Marineholmen Industrial AS safeguards:

- Seawater IPE: Carry forward the seawater from IPE to inside of bygningsliv.

- Seawater safety: Carry forward the seawater safety of Thormøhlens Gate 55 to inside of bygningsliv.

- Waste water: Waste water line from inside bygningsliv via jetty to sea

  • 1