Call +44 800 9755 164

Public tenders for business in Groningen Netherlands

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!

Business services: law, marketing, consulting, recruitment, printing and security

IUC-Noord | Published February 9, 2017  -  Deadline March 20, 2017
cpvs
79000000, 80000000

The purpose of this tender is to conclude an agreement with one contractor for the purpose of supporting smaller municipalities in GOAB (Municipal compensatory policy).

For a complete description of the attached documents.

The Ministry of Education is looking for a service provider that, from 2017, may offer a new support program to municipalities for Municipal compensatory policy (GOAB). The support program should contribute to improving the quality and range of the GOAB, and thereby reduce the educational disadvantages of children between 2 and 12 years and prevented. Simultaneously, the support section is informative role for the Ministry. On the basis of the route can be obtained namely a complementary picture of how things are in the municipalities where special attention is required.

Drilling Rig and Personnel — Geothermal wells WarmteStad

WarmteStad BV | Published February 22, 2017  -  Deadline March 22, 2017
cpvs
76431000, 34144100, 45255110, 76410000

WarmteStad is developing a district heating scheme within the city limits of Groningen that planned capable of providing 10.600 housing equivalents (WE) of heat within 7 years. This is the equivalent of 8 000 000 m3 of gas per year. The heat will be produced from a geothermal doublet in the Slochteren formation at a True Vertical depth of between 3.200 and 3.600 meters. Both producer and injector well will be drilled deviated, ending at a separation of about 1 300 meters at reservoir depth. Based on reservoir parameters a P50 production of 232 m3/hr can be expected. For the design of surface facilities and the business case a maximum production has been set at 200 m3/hr. The minimum expected production (P90) of the reservoir was estimated at 160 m3/hr It is therefore the aim of the project to obtain a production 200 m3/hr.

  • 1