Call +44 800 9755 164

Public tenders for business in Zalaegerszeg Hungary

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!
BusinessHungaryzalaegerszeg

Táj.elj.eredm contract of sale Zalaegerszeg Mayor's Office of used cars by offsetting the purchase of motor vehicles.

Zalaegerszeg Megyei Jogú Város Polgármesteri Hivatala | Published October 16, 2015
cpvs
34100000, 34115200

Mayor's Office of offsetting purchases of cars used car. The purchased car: • Model: Volkswagen Passat Highline BMT 2.0 TDI DSG 4 door • Capacity: 1968 cm3 • Power: 110 kW / 150hp • Color: deep black pearl • Upholstery: seat: Titanium Black / doors: black • Dashboard: top: black / bottom: black • Carpet: black Vehicle basic features plus the following factory optional extras you need: • Deep Black pearl luster • Business Package • LED headlight • Multi-function leather steering wheel (3 spoke) • side airbags, rear • Technical Package • Winter Package II • Seat covers in Alcantara • skins Sunshine Blind on the rear window II. • Load restraint net in the luggage compartment • LED Headlight II. • Sőtétített heat insulating glass column "B" 65% fényszűréssel the credited vehicle data: • Model: Volkswagen Passat Comfortline BMT 2.0 TDI CR DSG • Capacity: 1968 cm3 • Power: 103 kW • Colour: Date gray • First registration in Hungary: 03/04/2011. 18-i status. 187,800 km) 23.) Government decree on the basis of § 26 (6) accept an equivalent product. The cost of administration borne by the tenderers. Estimated value: £ 9,300,000 net of which the estimated value of £ 2.8 million net to count cars.

PFA for Pannon Development Foundation Expert Information Service nyújtása- award

Pannon Fejlesztési Alapítvány | Published July 31, 2015
Winner
Illés Produkt Kft.
cpvs
79400000

Pannon Development Foundation for the provision of expert services within the framework of the "Strengthening the social and economic role of the West Pannon regional higher education building on the experience of dual training 'NAMES TÁMOP 4.1.1.F-14/1 / Conversion Project with code-2015-0011: first Finding Benchmark experience in Europe, industry-oriented business areas - Exploring I 2. Benchmark experience in Europe, industry-oriented business areas - II 3. Expert tasks of the foreign experience pilot, capable of small-scale testing of students, involving 4 with the other institutions to cooperate in Zalaegerszeg dual engineer training center Development of the operation - the development of the operation of the fifth I be able to work with several institutions in Zalaegerszeg dual engineer training center - 6 Expert II pilot jobs abroad experience, try the small sample 3.1 7 Expert tasks of the foreign experience pilot, try the small sample 03.02 8. Expert Tasks foreign experience pilot, try the small sample 03.03 Bidder expert task-specific (related to the development of the dual training engineering) is a service activity. CPV code: 79400000-8 Business and management consultancy and related services

Pannon Alapítvány- Development Expert Information service award

Pannon Fejlesztési Alapítvány | Published March 9, 2015
Winner
Pannon Novum Nyugat-dunántúli Regionális Innovációs Nonprofit Kft.
cpvs
79400000

Pannon Development Foundation for the provision of professional services in the context of mechatronics engineering research and education network designated as co-TÁMOP 4.1.1.C-12/1 / KONV-2012-0010 project with code • Web interface and database development, the "list of topics associated with the development of mechatronic" c. • Supplement specific tasks related to R & D strategy, in line with the new higher education strategy contractor will document describing the web interface, as well as a study activity forms. CPV code: 79400000-8 Business and management consultancy and related services

Contract award notice - DFMVK book purchases in 2015

Deák Ferenc Megyei és Városi Könyvtár | Published May 6, 2015
Winner
Könyvtárellátó Nonprofit Kft.
cpvs
22110000

Delivery framework contract, which is the object of a purchase and the specific locations both domestic and foreign, published distributor from Hungary directly available books delivered for the purpose of library materials in Hungary to obtain Hungarian and foreign language books will be marketed in 2015, net 49,500,000 - £ such Lowest value + a budget of 10%. Within 3-5 business days from the date of order: Shipping. Delivery Specifications, Requirements: • Full range of electronic services (ordering, complaint, monitoring, record deliveries downloads). • providing content for commercial purposes is not descriptive. • on customer volumes in the exploration of form and content (bibliographic description, reference ETO, keyword) in print and electronic format (HUNMARC). • The library is suitable for use in assembly volumes purchased (Shelf, corner, 1-1 books and card catalogs carton)

Zalaegerszeg Municipality "Zalaegerszeg, construction of water facilities in the south section of water supply to Valley Street" szerz.mód

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 21, 2016
Winner
HYDROCOMP Mélyépítő Kft.
cpvs
45231300

Zalaegerszeg construction, water facilities for the Valley Street in the south section of water supply
Principal amount:
• D110 / HDPE PE100 PN10 SDR17 construction of water supply: 700 m
• D32 / HDPE PE100 PN10 SDR17 construction of water supply: 128 m
• NA80 column hydrant construction: 3
• NA100 column hydrant redevelopment: 1
• Booster construction: 1 piece
A detailed technical description of the tender documentation.
Offer the Offeror must submit unpriced budget priced for proposals to be issued as part of the tender documentation.
Contracting authority shall notify tenderers that the invitation to tender, as well as to an article specified in the documentation, references are made to type only a clear definition of the nature of the subject. The contracting authority 310/2011. under Regulation (XII. 23.) Government. § 26 (6) accepts everything with an equivalent product.
The level of reserve funding (the amount can be used only conditionally) the fee is 3% of the total business. arrangements for the use of reserve funding, possible cases, as well as detailed financial terms of the applicable documentation (draft contract). The margin is solely for the performance of works, necessary for the proper and safe use works against the value of the settlement.
Estimated value: 19,076,027 - HUF + VAT

Zalaegerszeg Municipality "Zalaegerszeg, construction of water facilities in the south section of water supply to Valley Street" No. 2 szerz.mód

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 18, 2016
Winner
HYDROCOMP Mélyépítő Kft.
cpvs
45231300

Zalaegerszeg construction, water facilities for the Valley Street in the south section of water supply
Principal amount:
# D110 / HDPE PE100 PN10 SDR17 construction of water supply: 700 m
# D32 / HDPE PE100 PN10 SDR17 construction of water supply: 128 m
# NA80 column hydrant construction: 3
# NA100 column hydrant redevelopment: 1
Booster Building #: 1
A detailed technical description of the tender documentation.
Bidder must enclose with your bid priced as part of the tender documentation
unpriced budget for proposals will be issued.
Contracting authority shall notify tenderers that the invitation to tender and the
Links specified make, type in the file with only the
To clearly establish the nature of the subject have been made. The contracting authority 310/2011. (XII.
under Regulation 23) Government. § 26 (6) accepts everything with an equivalent product.
The level of reserve funding (the amount can be used only conditionally) the fee is 3% of the total business. arrangements for the use of reserve funding, possible cases, as well as the financial conditions
detail in the documentation (draft contract). The margin only in the construction
investment performance, the proper and necessary for the safe use of work
counter-value accounting be used.
Estimated value: 19,076,027 - HUF + VAT

Information on the contract amendment - Pannon Development Foundation - Expert Service

Pannon Fejlesztési Alapítvány | Published December 9, 2015
Winner
Illés Produkt Kft.
cpvs
79400000

Pannon Development Foundation for the provision of expert services within the framework of the "Strengthening the social and economic role of the West Pannon regional higher education building on the experience of dual training 'NAMES TÁMOP4.1.1.F14 / 1 / Konv20150011 project with code: 1. Benchmark exploration experience in Europe, industry-oriented economic regions able to I 5 with the other institutions to cooperate in Zalaegerszeg - Exploring I 2. Benchmark experience in Europe, industry-oriented economic regions - - II 3. Expert tasks of the foreign experience pilot, small-scale testing of students, involving the development of the fourth operation of the ability to more institutions to cooperate in Zalaegerszeg dual engineer training center Development of the operation of the dual engineer training center - 6 Expert II pilot jobs abroad experience, try the small sample 3.1 7 Expert tasks of the foreign experience pilot, try the small sample 02.03 8. Expert tasks of the foreign experience pilot, try the small sample 03.03 Bidder task-specific experts (relating to the further development of dual training in engineering) is a service activity. CPV Code: 794000008 Business and management consultancy and related services

Zalaegerszeg, Hill Street táj.elj.eredmény

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published July 13, 2015
Winner
HYDROCOMP Mélyépítő Kft
cpvs
45232400

Aquatic facilities for Zalaegerszeg, Hill Street sewage drains Phase I main volume # DN200 / KG PVC sewer construction: 289 m # DN150 / KG PVC sewer access channel construction 45 m # Ø100 / b cleansing shaft construction 7 pieces # 160 / 200 KG-PVC fittings incorporate instantaneous cleansing: 7 pieces of detailed specifications in the tender documentation. Address: 1123 Budapest, u Creation. 53, Building E III. Floor | Tel: + 36-1-796-10-00 | Fax: + 36-1-796-10-01 info@provitalzrt.hu | www.provitalzrt.hu 2. Bidder must submit priced offer to be issued as part of the tender documentation unpriced budget proposals. Contracting authority shall notify tenderers that the invitation to tender, as well as article of manufacture as defined in the documentation, references to type only taken to identify clearly the nature of the subject. Contracting 310/2011. Pursuant to Regulation (XII. 23.) on. § 26 (6) accepts everything with equivalent products. The level of reserve funding (the amount can be used only conditionally) the fee is 3% of the total business. Arrangements for the use of the margin of possible cases, as well as detailed financial terms of the applicable documentation (draft contract). The margin may only be used for the completion of works, necessary for the proper and safe use works against the value of the settlement. Estimated value: 11,663,689 - HUF + VAT

Zalaegerszeg, street táj.elj Valley. the outcome of

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published July 8, 2015
Winner
HYDROCOMP Mélyépítő Kft
cpvs
45231300

Construction Zalaegerszeg, water facilities for the Valley Street in the south section of water supply main volume # D110 / HDPE PE100 SDR17 PN10 plumbing construction of: 700 m # D32 / HDPE PE100 SDR17 PN10 plumbing construction of: 128 m # NA80 column hydrant construction: 3 Address: 1123 Budapest, Creation u. 53, Building E III. Floor | Tel: + 36-1-796-10-00 | Fax: + 36-1-796-10-01 info@provitalzrt.hu | www.provitalzrt.hu 2 # NA100 column hydrant reconstruction: # 1 Booster Building: 1 A detailed technical description of the tender documentation. Offer the Offeror must submit unpriced budget priced for proposals to be issued as part of the tender documentation. Contracting authority shall notify tenderers that the invitation to tender, as well as article of manufacture as defined in the documentation, references to type only taken to identify clearly the nature of the subject. Contracting 310/2011. Pursuant to Regulation (XII. 23.) on. § 26 (6) accepts everything with equivalent products. The level of reserve funding (the amount can be used only conditionally) the fee is 3% of the total business. Arrangements for the use of the margin of possible cases, as well as detailed financial terms of the applicable documentation (draft contract). The margin may only be used for the completion of works, necessary for the proper and safe use works against the value of the settlement. Estimated value: 19,076,027 - HUF + VAT

Zalaegerszeg County Town city marketing support related news, publishing programs

Egerszegi Sport és Turizmus Szolgáltató és Üzemeltető Kft. | Published April 1, 2015
Winner
Pannon Lapok Társasága Kiadói Kft.;Pannon Lapok Társasága Kiadói Kft.
cpvs
79810000, 79553000

Zalaegerszeg County Town city marketing support related news, programs, publishing the first sub-tasks: tourist offer Zalaegerszeg the presentation, so the first line: Tourism marketing; Investment promotion; Economic opportunities, business presentation; Keeping young people at home; Festivals markets; TOP developments related marketing programs (Lower Forest, Village Museum, etc ..); Craft products to market, local homemade products, Zala products - Zala Workplace Initiative; Presentation of the local art scene; local vocational and higher education supply more popular. Release Date: 21 times the second sub-tasks: a) local products, producers publications about the contents of this publication: Local producers, products, contacts, presentations farmers' markets - calendar of local products shops selling guide to Call information local products, development-related sources of short supply chains, e government for the purpose of communication. The publication parameters: Size A / 5 Paper quality: Cover: Galerie Fine Gloss 115 g; Inside: LWC - NorCote gloss 70g Length: Minimum 24 + 4 pages Copies: eg 45000. b) Art Series The aim of the project: a quality, to the extent such a typography and graphic solutions for which it is not possible in a traditional setting. The selection of artists presented: the creative Zalaegerszeg John Nemeth Kossuth prize worth ceramic artist, a member of decorative arts and design arts department of the Hungarian Academy of Arts in collaboration because of his previous work, his reputation would really credible list of selected artists. 2500 for example. Data indicating quantity: 4 Estimated time of the procedure: 1. For sub-tasks: 14,000,000, -EUR for Lot 2: 2535000, -EUR

Zalaegerszeg Pine Street access road related works (water supply, sewerage and rainwater) kivitelezése- Contract award

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published October 8, 2014
Winner
HYDROCOMP Mélyépítő Kft.
cpvs
45231300, 45232450, 45232400

Construction Zalaegerszeg, Fir Street access road related works (potable water, rainwater and sewage) Main volume: • DN110 / HDPE PN10 water lines, 119 m • DN100 KTB FF hydrant building: 2 • DN200 / KG PVC sewer construction: 224, 5 m • Ø100 / b cleaner shaft construction: 7 • DN300 / KG PVC rainwater construction: 105 m • DN400 / KG PVC rainwater construction: 87 m • DN500 / PRAGMA rainwater construction: 19.7 m • DN600 / PRAGMA rainwater construction 10 m • Ø60 / b TO rainwater construction: 84 m • 45x45cm belméretű gully pit building: 2 • Ø100 / b cleaner shaft construction: 11 pieces of detailed technical specifications of the tender documentation. Bidder must submit the offer budget priced unpriced tender to be issued as part of the tender documentation. Contracting authority shall inform tenderers to the call for proposals, as well as article of manufacture as defined in the documentation and references are made to type only a clear definition of the nature of the subject. 310/2011 of the contracting authority. Pursuant to Regulation (XII. 23rd) on. § 26 (6) accept everything with an equivalent product. The level of reserve funding (amount used only conditionally) the total fee of 10% of the business. Arrangements for the use of the margin of possible cases, as well as financial terms of the details contained in the documentation (draft contract). The margin is solely for the performance of works, necessary for the proper and safe use of the work against the value of the settlement. Estimated value: 23,552,426, - + VAT CPV code (s): Main object: Main vocabulary: Water and sewage pipelines 45231300-8 45232450-1 45232400-6 Construction of Drainage Sewer construction

"Preparation and construction work at Zalaegerszeg, Kazinczy topographical map of the fourth amendment of a contract for detailed design documentation. Building during 3172 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
BMT Mérnöki Kft. és Z-Service Kft. Közös Ajánlattevők (Vezető: BMT Mérnöki Kft.); Tag: Z-SERVICE Kft.
cpvs
45000000, 09331000, 45320000, 45311000, 45350000, 45421132, 71245000

Building under paragraph 3172 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor thermal insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"The preparation and carrying out construction works Keszthely, Kossuth u modification of a contract for detailed design documentation. 42. u. Building under 774/9 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabadics Építő Kft - Szabau Invest Kft. Közös Ajánlattevők (Vezető: SZABADICS - ÉPÍTŐ Építőipari és Ingatlanforgalmi Kft.), Tag: SZABAU INVEST Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311000, 45350000, 45421132, 71245000

Building under paragraph 774/9 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, padlás- and cellar ceiling heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading heating systems, renewable energy utilization PV system construction and completion of all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation and modification of a contract to perform construction works construction plan documentation alaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and documentation to carry out construction works construction plan Lenti, 11 hrsz Temple Square. Building during 1084/3 "

Zala Megyei Kormányhivatal | Published November 9, 2015
Winner
LE-KO Építőipari Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 1084/3 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor and a flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, renewable energy utilizing solar building systems, and perform all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation and execution of a contract for work at Zalaegerszeg, Kazinczy u fourth space construction design documentation under the EEOP 5.6.0 / Project ID No. 12-2013-0037. Building during 3172 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
BMT Mérnöki Kft. és Z-Service Kft. Közös Ajánlattevők (Vezető: BMT Mérnöki Kft. (1023 Budapest, Ürömi utca 48.), Tag: Z-SERVICE Kft. (1137 Budapest, Szent István krt. 2. V/30.))
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under paragraph 3172 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor thermal insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and construction work at Keszthely, Kossuth u detailed design documentation. 42. u. Building under 774/9 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
Szabadics Építő Kft - Szabau Invest Kft. Közös Ajánlattevők (Vezető: SZABADICS - ÉPÍTŐ Építőipari és Ingatlanforgalmi Kft. (9700 Szombathely, Fő tér 24.), Tag: SZABAU INVEST Építőipari és Ingatlanforgalmi Kft. (H-8900 Zalaegerszeg, Sütő u. 4. II/1.))
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under paragraph 774/9 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, padlás- and cellar ceiling heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading heating systems, renewable energy utilization PV system construction and completion of all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation of detailed design documentation under the EEOP 5.6.0 / 12-2013-0037 identification number of projects and a contract to perform construction works Zalaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.
  • 1