Public tenders for business in Paks Hungary

Find all Business tenders in the world.
Finding business opportunities has never been easier.

Results for business. Make a new search!

The purchase of 5 pieces + 100 %% new electric midi bus Paks Local Government grant for the project application dossier - information

Paks Város Önkormányzata | Published August 12, 2015
Winner
Bally Holding Trust Kft. és „GATE” Tanácsadó Innovációs Oktató és Szolgáltató Közhasznú Nonprofit Kft. közös ajánlattevők
cpvs
71242000, 79421200, 72224000

Subject: "5 + 100% acquisition of new electric midi bus Paks Local Government for a project grant application dossier" as part of a contract. Quantity: grant-application dossier containing the following documents: - Project Data Sheet - Feasibility Study - PAD and its annexes: - 30 days Project previously supplied Founding Document - technical specifications - cost tablet - Presentation of the strategic fit is business operators in the evaluation stage availability, preparing the necessary corrections, and clarifications to answer questions, contact the Intermediary Organization.

Tájék. authors. mode. - Paks, blocks between the inner Kurchatov street Kando Kalman utca and the preparation of export-license plans for a full array of internal rekontsrukciójához between Kurchatov street Ifjúság

Paks Város Önkormányzata | Published March 21, 2016
Winner
SZABOLCS Mérnökiroda Kft.
cpvs
71220000, 71240000

Subject: Paks, Kurchatov utcaKandó
Kálmán Street block between internal (Kurchatov
bordered street, street Eugene Wigner, Youth and Kandó way street by area)
and the Kurchatov Street Youth
blocks between the inner path (Kurchatov Street, Babits
Michael Gagarin street
bordered by streets, Youth and Eugene Wigner way street
export-license plans for the area) full rekontsrukciójához
within the framework of the preparation of the design contract.
quantity:
The task:
Preparation and building / construction / legal licensing business plans
Design by submission of the licensing authority and the
with the appropriate content and number of copies Client
completion date of transfer of the contract signature date of 70 days.
The complete implementation plans transfer deadline: the last received
30 days from the authorization decision, receipt by designer
B. tasks:
Preparation and building / construction / legal licensing business plans
Design by submission of the licensing authority and the
with the appropriate content and number of copies Client
completion date of transfer of the contract signature date of 90 days.
The complete implementation plans transfer deadline: the last received
30 days from the authorization decision, receipt by designer
The fact that the designers of any procurement process and for the execution of works
it should be available in subsequent works, which
Technical expertise in relation to the context of the plans and documents
roles should be. The designers for carrying out these tasks separately
contract does not have.

Electrical machinery, apparatus, equipment and consumables; lighting

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published November 24, 2016
Winner
Visola Villamos Szigeteléstechnikai Kft.
cpvs
31000000, 31640000

Development of hermetic cable bushing for the digital radio system to operate 50 Ω nominal impedance, coaxial, and structured wiring to enable twisted-pair cable with a mix of mounted contained in this procurement specifications described, as well as the production and characterization of the developed hermetic cable bushing of the following scope and schedule:

Phase I:

- 3 prototype hermetic cable bushing rating.

II. schedule:

-. 4 qualified hermetic cable bushing production of the Paks Nuclear Power Plant Ltd. 1-4. in the block of installation.

The development and production must be carried out in PGKK the Paks Nuclear Power Plant Zrt. Blocks of Soviet-type Hermetic grommets used as a replacement or renovation as. The Paks Nuclear Power Plant Zrt. Provides the technical documentation available to the carrier. In case of renewal of the type used PGKK hermetic kábelátvezetőket.

1. In addition to the net amount of the advance provided for the amount of value added tax and the total amount of the advance plus value added tax is indicated as 9. (Billing and Payment) of the Treaty 9.2.

2. By 9:11, 9:15 and 23.5 points MVM Zrt Kontó. National Business Services Ltd. is changed.

For more detailed information, see. 1 no. contract modification.

Engineering support services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published May 19, 2017  -  Deadline June 22, 2017
cpvs
71336000, 72267100

improving the business framework contract / Operational log entries and preparation of technical support and ad hoc reports from 2017 to 2021. years.

The KHM (Maintenance Effectiveness Monitoring) periodic reports to the RRE (SSCs) reliability and unavailability monitoring support, KM (risk monitor) operation of the electronic logging system to log entries proofreading and reporting of and initial processing of peer-reviewed data in an offline external e -naplóban (fixing operational entries used by MVM PAZrt program).

And providing technical framework support required to meet the quality of the reports by the detailed procurement technical specification.

1.1 Task description

The task can be performed only in Hungarian.

1.1.2 E-journal entries revision

0: fixed 00 to e-journal entries proofread (data correction) will be subject to the KHM and WANO (World Association of Nuclear Operators) reporting of production records, KM (Risk Monitor) operation and PSA (Probabilistic safety assessment) failure compilation of statistics véve.A aspects of repair and data loading, proceed as ordered occasionally cycles into the application form.

After the year 350 000 log entry screening, based on the assumption of a 5% rate of annual planned revision quantity: 17 500 pcs.

The scheduled running of algorithms, loading data into the database.

According to this diary 1.1.3 to support the KHM, WANO and HAEA (Hungarian Atomic Energy Authority) report preparation of reports specific in application form.

The preparation of the data must be done to make it suitable for further processing in tabular form.

1.1.4 Technical Support Framework (human consulting, software backup insurance) e-journal system fixed application form by occasionally to perform the following tasks

provide a piece daytime phone number 1.1.4.1 is available for assistance, which may indicate a problem within 06-18 hours.

In addition to the working hours to sign a deal with mistakes and next business day.

1.1.4.2 If the problem is due to software e- logging fails, paper documents for the lost time obliged to fix the system after the patch.

Setting 1.1.4.3 Privileges and investigation issues.

assistance with using 1.1.4.4 Application.

1.1.4.5 Reporting and interpretation assistance related queries.

1.1.4.6 support for the interpretation of some functions.

1.1.4.7 Incorrect assistance in the restoration of data recording.

1.1.4.8 help users to frequently asked questions.

issues 1.1.4.9 Data scrutiny.

1.1.4.10 Application support for parameterization.

1.1.4.11 Database monitoring, monitoring of table spaces for the Megrend problems. direction.

Application Server 1.1.4.12 examining the problems, issues indication to the operator.

Making 1.1.4.13 An occasional individual queries formulated in accordance with the customer's needs.

1.1.4.14 The scheduled running of algorithms, loading data into the database.

1.1.4.15 algorithms in the system (e-executable log data acquisition algorithms) change tracking megrend. Based on demand.

Detailed in the tender documentation for procurement specification.

Battery mode Kalocsa excluding contract

Uszód-Dunaszentbenedek-Géderlak Községek és Kalocsa Város Szennyvíz Közmű Önkormányzati Társulása | Published September 9, 2015
Winner
Kalocsa Konzorcium
cpvs
45232420, 71322000

A contract to the "float, Géderlak, Dunaszentbenedek szennyvízcsatornázása villages, Kalocsa expansion and reconstruction of the city's sewer network wastewater treatment plant" within the framework of EEOP No. 1.2.0. / Kalocsai 09-11-2011-0026 project called the reconstruction of the wastewater treatment plant design and construction Yellow works according to FIDIC contract conditions. Quantity: kalocsai wastewater treatment plant reconstruction according to the design and construction works Yellow FIDIC contract conditions: the nominal capacity of the current operating license: Hydraulic = 5,600 m3 / d Biological = 56667 Lee Kalocsa wastewater treatment plant purified wastewater recipient of the Danube left bank in 1517 fkm Envelope. Design capacity: Hydraulic capacity: Qd = 3,240 m3 / d + 20 m3 / d TFH Biological capacity: 42,916 Lee + 717 Lee TFH Kalocsa wastewater treatment plant works for a list: - Biological phosphorus removal building - Internal recirculation (nitrate recirculation) Conversion - Sludge Compost Development - Expansion to 6,000 t / year capacity of 3,000 t / year. If the Bidder proposes a different technology, a description should be prepared for at least the same level of detail in the indicative plan. § 125 (9) of par.) Up to a maximum of 6,168,309 HUF 306/2011. Based on (XII.23.) Government Decree § 7 (2) of the reserve funding used only for the completion of works, necessary for the proper and safe use works against the value of the settlement. The proportion of non-eligible expenses due to industrial waste ratio is 12.58% of the business award, a maximum of 22,168,309 HUF net, which is included in the estimate.

Software programming and consultancy services

Nemzeti Üzleti Szolgáltató Zártkörűen Működő Részvénytársaság | Published September 27, 2017
Winner
Enterprise Services Magyarország Korlátolt Felelősségű Társaság
cpvs
72200000

Under the KOMP2 program managed by NÜSZ Zrt. For the integration of regional water utilities: implementation of a unified SAP ISU customer service system along with unified customer service processes.

The NÜSZ Zrt., As a Contracting Authority (AK), aimed at the integration of regional water utilities

KOMP2 program: Unified SAP ISU along standard customer service processes

based integrated customer support system

, which provides technical support to the full customer relationship business of Water Utilities, including, inter alia,

among the customer service processes SAP ISU

CIC module support, online customer service solution, integrated call center

solution, the current account management SAP FICA

module support, reading, clearing, billing processes SAP ISU

module support, the metering is SAP ISU

DM module support, integrated customer support document

management and output management solution, support for public utility engineering processes with SAP PM and SM modules.

In addition, the system to be implemented must be integrated with SAP ERP modules (FI, CO, PS, AM, MM, SD). The concerned Water Utility

currently exceeds 700 000 customers, so the system to be implemented must be capable of delivering 1 000 000

customer order management. During the creation of the integrated system, the expectation is in accordance with the operating rules of the Contracting Authority

Creating interface interfaces for SAP environments using a middleware application solution. With the middleware application

the number of interfaces to be established is 100. The detailed specification of the system is technical

as described herein.

Uninterruptible power supplies

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published January 11, 2017
Winner
Extor Elektronika Kft.
cpvs
31154000, 31158100, 71240000, 45310000, 71245000

Delivery of 18 pieces at least 100 kVA UPS unit (inverter and battery charger).

17 pieces of ground-fault-finder Battery Charger transport.

17 pieces of equipment UPS (inverter and charger) and 16 ground fault finder charger installation and commissioning.

Currently breakdown of operating systems.

Export, as-built plans and preparing Permits Hungarian.

Two-level (Service engineer and technician, maintenance-level) education.

Delivery of at least 18 pieces of 100kVA uninterruptible power unit (inverter and battery charger).

17 pieces of ground-fault-finder Battery Charger transport.

17 pieces of equipment UPS (inverter and charger) and earth fault finder 16pcs battery charger installation and commissioning.

Currently breakdown of operating systems.

Export, as-built plans and preparing Permits Hungarian.

Two-level (Service engineer and technician, maintenance-level) education.

Contents No. 2 contract modification:

The Treaty of section 4.2 4 (Obligations of the Contractor) supplemented technical design documentation of the blocks security system.

The Treaty 8 (Billing) of 9 and 13 shall be amended as follows:

9) 1 1-4 Safety Unit uninterruptible electrical system and structural engineering design plan delivery volume:, 12/12/2016 1,000,000 HUF;.

9 b) 1 1-4 Safety Unit uninterruptible electrical system and structural engineering design quality plan delivery:, 12.15.2016 500 000 HUF;.

9 c) 3 1 Unit uninterrupted security system (Y, X, W) export volume licensing plan documentation handover:, 03/01/2017 13,235,952 HUF..

13 3 1 Unit uninterrupted security system (Y, X, W) export authorization plan documentation quality transfer 28/03/2017.

MVM Zrt Kontó. Name of National Business Services Ltd. changed.

Procurement Technical Description 3.1.3. the following is added: The Making Unit uninterruptible safety equipment, technical design, which includes a detailed description of the transformation of engineering solutions and depth of detail so that the conversion may be based on underlying documentation and the detailed design.

Billing of 9 and 13 is amended in accordance with the modification.

C15 supply of engineering services jobs from 2016 to 2017. years - Contract award on

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published November 5, 2015
Winner
Trampus és Társa Kft.
cpvs
71300000

Contracting points out that the full amount may be different from those presented -30 percent. Tasks to be undertaken within the framework of the Treaty of preparation, review and sometimes additional expert opinions, analyzes and Permits documents containing proposals for technical problems encountered in the implementation of tasks related to the cycle modification solutions for the fuel for the Paks Nuclear Power Plant Zrt. Engineering justified are subject. The Contractor's detailed responsibilities: a) the provision of technical issues Technical support services; b) Freedom of expression, giving written advice on technical issues arising in the implementation of the tasks; In preparing c) providing technical consultation is an important technical decisions; d) making Opponents review conceptual designs, plans, technical reports, during dossier evaluation by other contractors; e) Level Facility Permits compilation; Periodic Safety Update Reports) g) ABOS (Nuclear Power Plant Safety Systems classification) performance of the conversion and operation of technology systems classified in category 1 safety experts coherently activities; Compilation h) Condition Assessment Reports; 25. defined.) Government Decree), taking into account j) Participation in Municipal technical consultations, k) Technical / normative regulations, decisions, recommendations for revision. The above technical support service functions to the Contractor provides the following key areas: - technical analyzes, aging management, in-service periodic inspections and functional tests, including materials inspection and maintenance efficiency, control activities, exploring the causes of failure, change, improving technology - scheduling maintenance mechanical, electrical and control engineering fields , modify, overhaul schedules, deterministic and probabilistic analyzes, re-evaluation, determination of conversion needs that may arise, primary and secondary circuit water plant / water chemistry issues and waste management. The Contractor shall perform his duties within the framework of technical support core activities and implementation of ad hoc tasks. Core Business 31 provides continuous service to Buyer as follows: Govt defined in Regulation 25.) In light;. - Customer demand retention of expert meetings, the location and ensure the administration; Therefore, there is always the responsibility of implementing all of the contractor and the contracting authority for the opportunity to put forward projects to promote the successful implementation of the new tasks, which are approved by the contracting authority. 2016-2017. expected volumes's Advanced tasks (2016) Exercise Period Provision (h) Technical support services for technical issues on technical issues 580 written opinions administered incurred in the implementation of tasks in preparing to provide 100 Technical consultation is an important technical decisions Making 100 Opponents review conceptual designs and plans by other entrepreneurs in technical reports, dossiers are evaluated 100 facility-level authorization dossier for 2000. Periodic Safety Update Reports) 1000 ABOS (Nuclear Power Systems Security classification) the conversion and operation of technology systems classified in one security category coherent professional activities defined in Regulation compilation 1000 Status Assessment Reports 0 25) Government. taking into account technical consultations 800 Participation in 40 technical / normative regulations, resolutions, reviewing recommendations 200 2016 TOTAL: 5920 Advanced tasks (2017) Exercise Period Provision (h) Technical support services for technical issues on technical issues 350 Exam providing of expertise involved in the implementation of the tasks 100 Technical Consultation In preparing to provide important technical decisions 40 Create Opponents review conceptual designs, plans, technical reports, during dossier evaluation 40 Facility-Level Permits Compilation 1800 Periodic Safety Update Report) prepared by other contractors converting 400 ABOS (Nuclear Power Systems Security classification) included one security category of technological systems and operating activities coherently expert on the assessment reports compiled 100 1100 25) as defined in Regulation taking into account the Government. 700 Participation in the technical consultation

Further information on the outcome of the process - Active Energy Association - Creating EEOP-6.2.0 / B / ID No. 11-2013-0006 project ENERGY HOUSE Screening Center

Aktív Energia Egyesület | Published November 21, 2014
cpvs
45000000, 45211100, 45212312

Subject: EEOP-6.2.0 / B / ID No. 11-2013-0006 project is to create ENERGY HOUSE Screening Center Amount: Passive House design consists of three structural building units: • First, a monolithic reinforced concrete building parts: adobe masonry infill, located in the office here , business and the social part of the exhibition floor space. • On the other hand, the exhibition and conference is located in front of the greenhouse space, steel supporting structure. • Third, the building is distinguished by its movable wall building. Foundation: The foundation funds nadir of 1.50 m occurs during the pillars. The insulation is located between the two. The reinforced concrete tie beam building provides a movable wall rail system of the host structure. The concrete grade C25 / 30 XC2-16-F3 BS 4798-1: 2004 Monolithic reinforced concrete building: The building is 10x12 m 25x25 cm cross-section of the pillars are made of reinforced concrete structures. The pillars are broadened so attached to the bottom beam under the floor. The stairs are also made of reinforced concrete arch structure. The monolithic reinforced concrete lintels also. The adobe walls filling. The concrete grade C25 / 30 XC1-16-F3 BS 4798-1: 2004 rebar: B500 Greenhouse building: Dimensions 10,6x13,8 200 m for the main Hea -as profiles made the connections are made M24 10.9 bolts. One is located in the 3.0-m frames per 75 cm vertical steel hollow sections are made to receive the glass wall. The bracing two increments of 20 mm steel rod stretched happen. Scüco connected to the steel structure of the glass structure. Steel grade S 235 BS EN 10027-1 Building Mobile: The mobile wall steel supporting structure also 10,60x12,75 m frame structure is located on the main points as 3.00 m Hea 240 profiles. Hea profile also prepared. The strained relations framework 10.9 grade screws. Handling certain condition of the building is fully open, upright design of the wheels should be such that the power indicator up to be able to pick up. Mobilisation: Maximum vertical load limits Pz = 90. The largest upward force Pz1- = -10 CN Pz2- = -25 CN (in the middle of the corner points) Maximum lateral force Px = 40 CN between the steel structures vertically placed wooden purlins are made of 75 cm - a. Determination of the size of wooden structures and relations of the establishment is not part of the design task. Material Qualities Floor Concrete C25 / 30 XC2-16-F3 Floors Walls C25 / 30 XC1-16-F3 Mounting concrete C8 / 10-XN (H) -MSZ-1: 2004 Reinforcing steel B500B Steel S235 JR Building support structure contained in the following standards compliance. The support structure of the building does not contain asbestos. Applied standards: BS EN 1990: 2005 Basics of structural design EN 1991-1: 2005 BS impacts of structures EN 1993-1-1 Design of steel structures to obtain the passive house certification is not part of the contract. In addition, the building must be not only the permanent exhibitions, but periodic conferences, events and meetings as well as suitable, in which visitors specifically to learn about renewable energy technologies up close, even during operation.

Diaphragm valves

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published February 24, 2017
Winner
OT Industries Tervező Zrt.
cpvs
42131290, 71334000, 45310000, 45350000

High-pressure emergency core cooling system pumps can be tested in the implementation of the installation of 24 pieces of szilfonszelep.

The amount of purchases:

The testability implementation of the purchase and delivery, installation and associated mechanical, electrical and control engineering and preparation of manufacturing authorization plan documentation, manufacturing services and other procurement, construction, commissioning Implementation of 24 pieces of electrically operated szilfonszelep.

The objective of public procurement:

The electrically operated szilfonszelep purchase, delivery and installation of testability of under * 0TH10 (20.30) D001 pumps ASME (American Society of Mechanical Engineers) requirements to ensure the block in all operating conditions, so that the emergency availability is not reduced.

The technical scope of:

The guidance system must be adapted to the reci and próbaági business function is reversed, a common branch before the two branches will be built per pump to be delivered 2 DN80 Series szilfonszelep (of 24 pieces) reci function, the current reciágban remains 1 DN50 and szilfonszelep trial function.

The contractor (entrepreneur) expect major tasks:

- Preparation of design specifications in accordance with standard MSZ27003 NCA-3250 standards,

- The authorization level 1-4. Making Unit mechanical design documentation,

- The authorization level 1-4. Making Unit electrical and instrumentation design documentation,

- Preparation of installation work programs touch every area of ​​expertise, participation in commissioning,

szilfonszelep performing seismic testing put into production,

- Detailed in the detailed design called. Creating organizational generate design documentation,

- Creating a quality control plan,

- Conversion of all involved in the field with respect to change in the Final Safety Analysis Report (FSR), sections, operational documents such as operating instructions, testing instructions, operating schedules, preparing reteszkönyvek,

- Full (mechanical, electrical and control engineering) to carry out construction works,

- The purchase, supply and installation of electrically operated szilfonszelepek,

- Manufacturing Execution and Quality Control Technical Manual (KMMEU)

- To ensure reporting of independent nuclear expert,

- Providing on-site during construction based on the Customer demand for ad hoc designer's leadership,

- 1-4. Unit Engineer, Manufacturing (mechanical, electrical, instrumentation field filling the as-built plans for the distribution system of Customer file) electrical, instrumentation built drawings.

Preparation of licensing documentation:

The documentation, which must comply with the requirements in force in general designer for the customer and the recommendations provided for by government decrees in terms of form and content.

Existing pipelines and valves technical parameters:

* 0TH18 (28.38) wiring parameters:

Size: 57 * 5.5.

Design temperature: 60 0C ..

Design pressure up to 140 bar.

ABOS: FBOs 2: 2 (according to NSC).

* 0TH17 (27.37) wiring parameters:

Size: 133 * 11th

Design temperature: 60 0C.

Design pressure up to 140 bar.

ABOS: FBOs 2: 2 (according to NSC).

* 0TH18 (28.38) S201,202 valves:

Type: SZ-26360-050 (szilfonszelep).

Size: NA50.

Pressure rating: PN200.

Closing Time: 6s.

Opening Time: 6s.

ABOS: FBOs 2: 1 (NSC).

* 0TH17 (27.37) S201 valves:

UF26031.

Size: NA100.

Pressure rating: PN200.

ABOS: FBOs 2: 2 (according to NSC).

Requirements of new electrically operated szilfonszelepekkel The main requirements to be installed:

requirements for construction and operation, final inspection, marking and documented in the procurement technical specification includes:

  • 1